排放系統 的英文怎麼說

中文拼音 [bèifàngtǒng]
排放系統 英文
drain off system
  • : 排構詞成分。
  • : releaseset freelet go
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 排放 : discharge; blowoff; blowdown; issue; volley; emission; sluice; bleed
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. The gangue discharge system by belt conveyance in the mine

    礦內輸送帶運輸矸石排放系統
  2. With the establishment of the regional headquarter for asia pacific in shanghai in 2003, geberit underlined its commitment to china. esteemed as a pioneer in sanitary and piping systems, geberit is mastering all kind of in - building water flows. the broad product family ranges consist of flushing tanks and mechanisms, electronic sensors, traps, shower toilets, water drainage and water supply systems

    吉博力公司於1996進入中國,於1996年和1997年在浙江岱山和上海建立了兩個生產基地,主要生產節水型水箱隱蔽式水箱水箱配件及各種管道,並銷售所有吉博力集團的其它產品,如電子感應水嘴,電子感應小便沖水,高密度聚乙烯管道hdpe ,以及虹吸式屋面雨水排放系統等。
  3. Pipe racking system

    鉆桿排放系統
  4. Forestry machinery - portable chain - saws and brush cutters - exhaust system - caused fire risk

    林業機械便攜式油鋸和割灌機易引起火險的排放系統
  5. Specification for design of fuel gas system and combustible gas emission system in petrochemical enterprises

    石油化工企業燃料氣和可燃性氣體排放系統設計規范
  6. Recirculation of air from industrial process exhaust systems

    工業加工排放系統出空氣的再循環
  7. Analysis on silting up in center river discharging system of sibao sewage treatment plant in hangzhou

    杭州市四堡污水處理廠江心排放系統淤積現象分析
  8. Currently sewage in sewage pumping station system is pumped manually. so the station is working in low water level and energy is consumed. this mode ca n ' t predict the inflow ' s changing

    當前污水泵站排放系統主要採用人工值守方式水,低水位高揚程耗能嚴重,且缺乏預測能力,流量洪峰來臨時易產生污水溢出污染。
  9. Manufactured safety vacuum release systems for residential and commercial swimming pools, spa, hot tub, and wading pool suction systems

    住宅和商用游泳池健康中心熱浴盆和淺水池吸入用人造安全真空排放系統
  10. By researching the sewage pumping station ' s working situation and studying the advanced theory in sewage pumping control, the sewage pumping control system based on predictive control is proposed

    通過分析污水泵站排放系統運行情況,結合當前國內外研究成果,提出了基於預測控制的污水控制
  11. The question of power waste and sewage overflow in sewage pumping station system is proposed. in order to solve this question, predictive control and vvvf are applied

    本文針對當前污水泵站排放系統存在的耗能多及污水溢出污染的問題,提出了採用預測控制,結合變頻調速的控制手段。
  12. On the base of studying in arithmetic of predictive control, different math models are used to approach the control system. general water level control, pid control and predictive control using in sewage pumping station are compared. by simulating the different models using in control system, the conclusion that the aim of saving power and preventing pollution in sewage pumping station can be achieved by using predictive control is got

    在預測控制演算法研究的基礎上,分析了用不同的數學模型逼近污水泵站排放系統,比較了採用常規水位控制、 pid控制和預測控制對污水泵站排放系統的控制效果,在模擬結果對比的基礎上,得到了採用預測控制可以更好的解決節能無污控制目標的結論。
  13. Experimentation of sewage pumping station based on predictive control with vvvf is carried out. the experimentation result shows that the sewage pumping station predictive control system can be running under the condition of high water level. by using this control mode, inflow sewage is pumped out entirely

    在模擬研究基礎上,搭建了模擬試驗,在實驗室條件下,對污水泵站排放系統進行了結合變頻調速的預測控制模擬試驗,試驗結果表明,採用預測控制,可以使運行在高水位低揚程的工況下,使流入泵站管網的污水等量出,實現了節能無污的控制目標。
  14. Opest oil protection and emission system test

    油品保護及排放系統試驗
  15. The food and environmental hygiene department ( fehd ) and the building management carried out thorough cleansing and disinfection of the common areas and individual flats of block e between april 7 and 10. disinfection of individual flats focused on sinks, bathtubs, washbasins, toilet bowls and floor drains in the toilet and kitchens. subsequent test for e - coli showed that the disinfection of the sewage system was effective

    在四月七日至十日期間,食物環境?生署(食環署)及管理公司已為e座的公眾地方及各個單位進行徹底清潔及消毒。各個單位的消毒工作集中在廁所和廚房內的洗滌盆、浴缸、洗手盆、馬桶和地面水渠。其後進行的大腸桿菌化驗結果顯示,是次污水排放系統的消毒工作有效。
  16. Yuen long, kam tin, ngau tam mei and tin shui wai drainage improvements, stage 1, phase 2b - kam tin

    元朗錦田牛潭尾及天水圍雨水排放系統改善計劃第1階段第2b期-錦田
  17. Another dmp study for southern hong kong island commenced in september for completion in 2004, aiming at devising long - term and short - term measures for upgrading the stormwater drainage system so as to cope with current and future development needs

    此外,香港島南區雨水整體計劃研究於九月展開,將於二零零四年完成。這項研究將制定改善雨水排放系統的長、短期措施,以應付現在及未來發展的需要。
  18. To tie in with the temporary traffic arrangment for the west kowloon drainage improvement works at dundas street, the part - time pedestrian areas at sai yeung choi street south between soy street and dundas street, and soy street between sai yeung choi street south and fa yuen street are temporarily suspended

    渠務署在登打士街進行西九雨水排放系統改善的工程,位於西洋菜街南介乎豉油街與登打士街及豉油街介乎西洋菜街南與花園街之部份時間行人專用區會暫時取消,改為全日通車。
  19. Technical rules for discharge system of radioactive waste water from lwr nuclear power plant

    輕水堆核電廠射性廢水排放系統技術規定
  20. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - - tam tin ( works package d ) road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第92cd號元朗、錦田、牛潭尾及天水圍雨水排放系統改善工程第1階段第2b期? ?錦田(工程組合d )擬建的長莆、馬鞍崗、元崗新村及田心村地區水改善工程? ?附屬道路工程
分享友人