排氣管線 的英文怎麼說

中文拼音 [bèiguǎnxiàn]
排氣管線 英文
blow off pipe line
  • : 排構詞成分。
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 排氣 : [機械工程] exhaust; aerofluxus; air out; exit gas; ventilate; atmosphere; vent排氣泵 exhaust pump...
  • 管線 : line pipe; lead-out管線安裝 pipelining; 管線泵 in-line pump; 管線測量 pipeline survey; 管線敷設 pipelining
  1. Bda is equipped with advanced facilities for international telecom, water, electricity, natural gas, steam, heat, and separate drainage systems for sewage and rainfall

    開發區建有高水平的國際通訊設施和水電天燃蒸汽熱源等站所及雨污分流的水系統。
  2. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠( 1520 ) ;海南海燕油公司八所油碼頭;海燕公司白沙液化中轉站;海南南山美國阿科公司儲油萬立米大罐工程;海南南山電力股份有限公司天然及燃安裝工程;海南南海天然有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島;昌化江穿越工程;西東輸十九標段,太行山土石方工程。
  3. The approach followed the schedule and the route is the same as before, through the abruzzi - spur. despite the bad weather, the higher camps were established one after another

    依據登山日程和路程而安的登山進軍路和上次一樣,也是穿過阿布拉孜山脊。盡壞天的不利影響,更高的營地還是一個接一個陸陸續續地建立了。
  4. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電、給道、設備安裝為2年; 5 、裝修工程為2年。
  5. Prescribed products include plugs, adaptors, lampholders, flexible cords, extension units and unvented thermal storage type electric water heaters

    訂明產品包括插頭、適配接頭(萬能蘇) 、燈座、軟電、拖板及無儲水式電熱水器。
  6. Remark : additional exhaust lines to the system ( the exhaust line for used helium and the line from chamber evacuation pump ) will be required

    備注:另外要求到系統的排氣管線(用於使用后的氦和從真空箱抽真空泵的排氣管線) 。
  7. High - tech computer controlled motor control centre for more efficient power distribution. modern facilities to meet the highest standards for environmental protection and safety. all tands are equipped with 316l stainless steel vapour lines for vapour balancing, absorption or combustion. pressurised tanks to prevent breathing

    蒸汽回收和火炬用於不允許向大放的產品,每座罐設有與碼頭、火車罐車裝卸臺和汽車罐車裝車站相連的產品蒸汽,產品蒸汽會被完全回收。
  8. Pressure test of segmental pigging : cleanup sundries, free rust, drainage and exhaust in pipe

    分段清試壓:清除雜物、浮銹、水、
  9. Pressure test of through out pigging : inspect pipe deformation and construction quality. exhaust before water pressure test, drainage before manufacture, dryness and medium isolation

    總通清試壓:檢測變形、施工質量。水壓試驗前、生產前水、乾燥、介質隔離。
  10. The cause of vacuum degree formation under groundwater table is discussed in the paper. the testing results show that vacuum degree above the groundwater table is produced directly by pumping air, and that vacuum degree below groundwater table is produced mainly by dewatering and by escaping of sealed air from the end of flexible pipe. based on the bernoulli equation, the limit lowering of groundwater table is analyzed, which is about 5 ~ 7m. the effective influence depth of vacuum preloading has relationship with pvds depth and can be more than 10m

    對地下水位以下的真空度成因進行了分析,結果表明,地下水位以下測到的真空度是由於測試軟中水位下降或部分封存體從軟末端逃逸引起的,與地下水位以上的真空度由抽直接形成在成因上存在不同;根據伯努俐方程,對地下水位下降的極限深度進行了分析,得出真空預壓中地下水位的極限下降深度為5 7m ;對有效影響深度的分析結果表明,真空預壓的有效影響深度與塑料水板的打設深度具備一定關系,有效影響深度可以超過10m 。
  11. Freezing weather precaution ? subsequent to testing a piping system, valves should be in an open position to allow complete drainage

    結冰候預防-檢測系統后,閥門應該處于開啟狀態,做到泄完全充分。
  12. Air - conditioner, heat sources, cooling coils, heating coils, reheaters, smoke exhaust systems, air handling units, fan coil units, room air units, etc

    調節裝置冷機、發熱圈、冷卻圈、加熱器、煙系統、風櫃、風機盤、窗口機等
  13. The exhaust system and muffler are simplified as a set of 1 - d pipes with non - isentropic flow and with variable sections. the partial differential equations of non - stationary flow are transferred into the stationary differential equations by means of the characteristic lines. these equations are solved by finite difference method

    系的計算中將簡化為一組一維非等熵變截面,並通過「特徵法」將描述其運動的非定常流的偏微分方程轉化為常微分方程,再用差分數值方法依靠計算機求解。
  14. Jiangsu changshu siji sunshine solar energy co., ltd hereinafter referred to the company is an enterprise specializing in the production of solar water heaters and solar vacuum tubes. it has the most advanced automatic continuous high vacuum exhausting system and automatic vacuum coating production lines. the company uses the high - quality raw materials from tianxu group, with the most advanced production equipment, and hire professional and technical personnel involved in the production and management, which assure the good quality of products and professional technology. the company.

    江蘇常熟市四季陽光太陽能有限公司是一家專業生產太陽熱水器及真空集熱的企業。擁有國內最先進的圓盤連續式高真空自動臺及全自動真空鍍膜生產。現公司原材料全部採用天旭集團的優質毛坯,擁有國內最先進的生產設備,並聘請國內知名企業的專業技術人員參與生產理。
  15. “ on some of these cars, if that pipe gets cut off near some wiring or a fuel line or a gas tank ? which in some cases are not shielded ? there is a possibility of a fire and / or explosion, ” said david eames of pittman automotive service in seattle

    「在這些車上,如果在接近電或燃油或油箱的地方被截斷?有時這些地方沒有被隔離開?就有發生火災或爆炸的可能, 」來自西雅圖皮特曼汽車服務公司的大衛?艾姆斯說道。
  16. Normal discharge and nuisance spitting are accommodated by the use of a watts air gap fitting and a fabricated indirect waste line

    採用美國瓦茨隙連接件和預制導向水,可能會伴隨正常的放和有害的噴濺。
  17. In the case of a pit drain, ensure an adequate air gap exists between the bottom of the drain line and the bottom of the pit

    在坑內放時,請確保在和坑底部之間有適當的隙存在。
  18. Lower aluminium touches continue at the front and rear of the vehicle, giving visual emphasis to front air ducts and rear exhaust outlets and adding a bold strip along the edge of the bootlid between the tail lamps

    鋁飾條在車身前後持續延伸,使前進風和後口顯得非常突出,並使后備箱邊沿和尾燈之間形成強烈的條。
  19. Application the machine is mainly used for producing large - aperture pipe material. the produced pipe materials are widely used in water - supply pipe, gas pipe, chemical pipe agricultural irrigating pipe and others

    該生產主要用於生產大口徑材,生產的材廣泛用於上水,煤,化工用,農業灌溉和人民生活等方面的大口徑給,等特殊用途的材。
  20. Bleed off surface accumulators

    地面
分享友人