排水法 的英文怎麼說
中文拼音 [bèishuǐfǎ]
排水法
英文
displacement method-
In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented
摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。The schedule for garment sewing assembly line
服裝縫紉流水線負荷平衡優化編排方法This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation
應用流體力學理論結合碼頭結構建設,分析了地下水排泄過程,藉助管道和碎塊石盲溝建立了港口碼頭快速排水與擋墻基床排水的方法;運用質量守恆定律和地下水滲流原理,建立了港口碼頭排水計算數學模型和排水過程計算公式,並用在了碼頭的穩定設計計算中。Discussion on the building of catch pits in front of residential districts
淺談住宅小區樓前排水檢查井的做法Soft soil ground treatment for tank by dewatering concretion
運用排水固結法處理大型油罐軟土地基From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound
但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。Experimental study on the air floatation treating mine wastewater
氣浮法處理煤礦井下排水試驗研究Drainage way with floor blocked up, drainage with back outlet sanitary facilities and drainage with floor descended are discussed and summarized. a new drainage way with floor descended is introduced which solves the problem of seeper drainage
在工程實例中,提出了一種新的下沉式排水方式,徹底解決了目前下沉式作法的下沉空間積水排除問題。Due to the effect of uentrapment of water and air is considered during the generation of water - filled cells, the method presented here can simulate the objective existing hysteresis between drainage and imbibition process, which can " t be reflected by the previous numerical simulation methods
由於該法在生成裂隙充水域時考慮了水和氣的「圈閉」效應,故能模擬出裂隙排水與吸水過程間客觀存在的滯后現象,這是以往數值試驗法所不能的。Experimental research on electro - osmotic consolidation of lacustrine clay
電滲排水法加固湖相軟粘土的試驗研究Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years
建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。Treatment of breakwater soft foundation by sand bags and dewatering plastic sheet can fully satisfy the project need
採用袋裝砂和塑料排水板的軟基處理方法完全能夠滿足工程需要。Because of the advantages of prefabricated plastic drains over other vertical drains, this technology is widely used in recent soft clay foundation improvement in our country and it has been a main method in drainage consolidation methods
由於塑料排水板與其它排水體相比具有諸多優點,近幾年來在國內軟粘土地基處理中被廣泛使用,塑料板排水法成為排水固結法中最主要的方法。The displacement method, on the other hand, can be used to obtain accurately the cubic volume of any part of the tree.
另一方面,排水法可用來精確求得樹木任一部分的立方材積。There are many ways to handle the soft soil, such as : use the sand mat as a layer, carry to press in advance, press by thin film in the vacuum in advance, drain by use the sand well, drain by plastics plank, and reunite the foundation
軟土的處理有許多方法,如:砂墊層,堆載預壓法,薄膜真空預壓法,袋裝砂井排水法,塑料排水板法,復合地基法。Rapid drawing water method after flood in local small co al mine
一種地方小礦井水災后快捷排水法But the theoretical research of it is lagged the practice, so the use of it is still in the period of experience
但對塑料板排水法的理論研究遠滯後於工程實踐,塑料板排水法的使用還處于經驗階段。In this dissertation, based on the field data of using prefabricated plastic drains improving soft clay foundation of filling - sea project in the shenzhen gulf, the qualitative and quantitative analysis of many factors of theoretic calculation way used in prefabricated plastic drains design were done, which could be a reference to choose the theoretic calculation way in other projects
本課題根據所收集到的深圳灣填海工程中塑料板排水法處理軟粘土地基的工程實測資料,對塑料板排水法處理軟粘土地基的理論分析計算中通常要考慮的各種要素進行了定性或定量分析,可作為同類工程中選擇理論計算方法的參考。At the same time, the applicability and error of different methods used in prefabricated plastic to calculate final settlement based on the field settlement data and to calculate percent consolidation were compared in this dissertation. the results could be a reference in choosing the method of calculating settlement and percent consolidation and to evaluate the error of results in other projects
對目前根據現場實測沉降資料推算最終沉降的方法和常用的固結度計算方法在用於塑料板排水法時的適用性和計算結果的偏差規律進行了比較研究,可作為選擇計算方法和估計計算誤差的依據。Making use of many layers composite technique and heat press technique to make artificial skull, through a series of performance testes ( including elongate performance, compress performance, curve performance, concussion performance, lay cut performance, concussion cut performance ), making use of drainage method to calculate its average density, which is 1. 25kg / m3, and combustion method to calculate its content of macromolecule, which is 57. 7 %
利用多層復合技術和模壓技術制備來的人工顱骨復合材料,通過對其一系列性能測試(包括拉伸性能、壓縮性能、彎曲性能、沖擊韌性、層間剪切強度和沖擊剪切強度等) ,證明了該復合材料具有良好的物理機械性能。採用排水法計算復合材料的平均密度為1 . 25kg m ~ 3 ,採用灼燒法計算復合材料的含膠量為57 . 7 ,證明該復合材料比強度較高。分享友人