排水管設備 的英文怎麼說

中文拼音 [bèishuǐguǎnshèbèi]
排水管設備 英文
soil stack installation
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • 排水管 : drain-pipe; pipe weep; exhaust water pipe; fall tube; scupper pipe; scupper shoot; off-take pipe
  • 排水 : drain off water; drain away water; dewatering
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  1. Manufacturers ' data report for watertube boilers, superheaters, waterwalls, economizers

    鍋爐過熱爐壁和熱力裝置的生產商數據報告
  2. To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related

    對屋頂,地板,地下室,下道,氣口,泥和混凝土,地基等相關的結構進行每季度,每半年,每年的檢查和修理。
  3. Review of the building standards of sanitary fitments, plumbing, drainage works and latrines regulations

    檢討建築物生標準裝置工程及廁所規則
  4. 10. building standards of sanitary fitments, plumbing, drainage works and latrines amendment regulation 1997

    10 . 1997年建築物生標準裝置工程及廁所修訂規例
  5. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為計文件規定的該工程的合理使用年限; 2 、房屋防工程、有防要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣線、給道、安裝為2年; 5 、裝修工程為2年。
  6. The construction includes 31 buildings, including administration building, maintenance factory, wheel - cutting factory, signals and telecommunication facility control room, machinery and electricity equipment factory, etc. furthermore, there are also several kinds of equipments facility : such as, oil tank, gasoline station, automobile - washing factory, way dregs storage area, way dregs loading machine shelter, water discharge channel, wasted water pipe line and scenic spots facility, etc

    工程內容包含有31棟建築物如行政綜合大樓檢驗修理廠車輪鏃削廠號志及通訊機房機電與工務廠等。另有各項施如:油槽加油站洗車廠道渣儲存區,道渣裝卸機棚溝渠污線景觀施等。
  7. Dental equipment. connections for supply and waste lines

    牙科.供連接件
  8. Legislative council question 2 : " review of the building standards of sanitary fitments, plumbing, drainage works and latrines regulations " by the hon alan leong and a reply by the secretary for housing, planning and lands, mr michael suen, in the legislative council

    立法會會議上樑家傑議員就立法會二題:檢討建築物生標準裝置工程及廁所規則的提問和房屋及規劃地政局局長孫明揚的答覆
  9. Practice for underground installation of thermoplastic pipe for sewers and other gravity - flow applications

    和其它重力流動用熱塑性的地下安裝實施規程
  10. Water systems for fire extinguishing - filling and draining devices opeated by remote control - part 2 : for water extinguishing systems with empty and non - pressure pipework ; requirements and testing

    消防用.遙控注裝置. 2部分:空和無壓
  11. Sanitary fitments are provided to a standard not less than that required by the building standards of sanitary fitments, plumbing, drainage works and latrines regulations cap 123 sub

    的?生,其標準並不低於建築物?生標準工程及廁所
  12. Sanitary fitments are provided to a standard not less than that required by the building ( standards of sanitary fitments, plumbing, drainage works and latrines ) regulations ( cap 123 sub

    的?生,其標準並不低於《建築物( ?生標準、工程及廁所
  13. E associated works including at - grade roads, drainage, sewers, watermains, slope stabilization and protection works, traffic aids, street lighting, electrical and mechanical works, traffic control and surveillance system works, fire services main, irrigation system, hard and soft landscaping, fire hydrants and emergency crossing

    進行相關的地面道路及污渠輸斜坡鞏固護坡電氣及機械園景建築及種植花木緊急過路處工程置輔助交通交通制及監察系統裝街道照明安裝消防街井頭灌溉系統。
  14. The cause of vacuum degree formation under groundwater table is discussed in the paper. the testing results show that vacuum degree above the groundwater table is produced directly by pumping air, and that vacuum degree below groundwater table is produced mainly by dewatering and by escaping of sealed air from the end of flexible pipe. based on the bernoulli equation, the limit lowering of groundwater table is analyzed, which is about 5 ~ 7m. the effective influence depth of vacuum preloading has relationship with pvds depth and can be more than 10m

    對地下位線以下的真空度成因進行了分析,結果表明,地下位線以下測到的真空度是由於測試軟位下降或部分封存氣體從軟末端逃逸引起的,與地下位線以上的真空度由抽氣直接形成在成因上存在不同;根據伯努俐方程,對地下位下降的極限深度進行了分析,得出真空預壓中地下位的極限下降深度為5 7m ;對有效影響深度的分析結果表明,真空預壓的有效影響深度與塑料板的打深度具一定關系,有效影響深度可以超過10m 。
  15. Comprehensive arrangement the location of kitchen & toilet in the house, rational division of the space of the kitchen & toilet ( eg. it is necessary to separate the dry from humid space in toilet, the clean from contaminated space in kitchen ), it is emphasized that decent space for kitchen & toilet and some flexible space is advocated in the design, the appurtenances arrangement should be coped with the human engineer, it is better to design pipe well and equipment layer to accommodate the various meters, wires and pipes. in order to save energy and water, it is recommend to use solar energy and the different quality water

    本著「以人為本」的計思想,提出適宜經濟適用住宅的整體廚衛計思路和方法,即:綜合協調廚衛在住宅中的位置;對廚衛空間進行合理分隔(衛生間干濕分離,廚房潔污分離) ;廚衛各空間必須具有適宜的空間尺度和面積保障,並提倡具一定的面積彈性計;依據人體工效學原理進行廚衛部分的綜合布局;利用道井、層綜合布局各種線儀表;採用分質供計系統和太陽能供能系統,達到節節能;注重廚衛的煙通風計,提高室內環境質量;考慮廚衛的適應能力,注重通用計。
  16. When the system finishes water supply, this valve can automatically supplement air into the sealed water pipe, which can be evacuated just to open the valve at the outlet, suitable for the evacuation and freeze - proof system of water supply etc. facilities

    自動充氣系統供完成後,該閥可自動補充空氣進入密封,將下端閥門打開即可實現空,適用於供防凍系統
  17. Standard specification for geocomposites for pavement edge drains and other high - flow applications

    路面邊緣及其他高流動性用土工復合材料的標準規范
  18. 5. 2 the proposed list of inspection items covers different building elements, including external elements, structural elements, drainage, fire safety but excluding those fire service installations currently regulated by the fire services department, and unauthorised building works those constituting obvious or imminent danger to life and property will need to be rectified under the proposed scheme

    5 . 2擬議的檢驗項目涵蓋樓宇的不同部分,包括外墻附建構件結構性構件系統樓宇消防安全構件目前由消防處規的消防裝置除外及僭建物對生命財產有明顯或迫切危險的僭建物須根據擬議驗樓計劃而清拆。
  19. Jiangsu changshu siji sunshine solar energy co., ltd hereinafter referred to the company is an enterprise specializing in the production of solar water heaters and solar vacuum tubes. it has the most advanced automatic continuous high vacuum exhausting system and automatic vacuum coating production lines. the company uses the high - quality raw materials from tianxu group, with the most advanced production equipment, and hire professional and technical personnel involved in the production and management, which assure the good quality of products and professional technology. the company.

    江蘇常熟市四季陽光太陽能有限公司是一家專業生產太陽熱器及真空集熱的企業。擁有國內最先進的圓盤連續式高真空自動氣臺及全自動真空鍍膜生產線。現公司原材料全部採用天旭集團的優質毛坯,擁有國內最先進的生產,並聘請國內知名企業的專業技術人員參與生產理。
  20. Dental equipment - connections for supply and waste lines

    牙科.漱口沖洗牙用給接頭
分享友人