排水鋪面 的英文怎麼說

中文拼音 [bèishuǐmiàn]
排水鋪面 英文
drainage blanket
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 排水 : drain off water; drain away water; dewatering
  • 鋪面 : 鋪面shop front; storefront鋪面房 shop building; a house with a shop front
  1. Ventilation and gas management during district rise passing through gob of small coal pit

    礦21采區2031采系統的改造
  2. The water - depth computer monitoring system collects data from gps, multi - frequency fathometer ( 16 frequencies ) and plc network. based on the analysis of these data, a three - dimensional underwater ground profile is presented for the scheduled area of geotextiles - laying, the development tool of the three - dimensional underwater ground profile is opengl. this thesis is organized into five chapters

    深計算機監控系統採集來自gps 、多通道測深儀( 16通道)以及plc網路的數據,將這些數據進行處理后,顯示待設軟體的小區域內的三維下地形,三維地形的開發採用目前國際上流行的三維圖形介opengl 。
  3. During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline

    本文通過東湖環湖景觀建設綜合整治二期工程中的茶港親平臺、沙灘浴場及停車場的道路和景觀設計,對東湖環湖的路裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通道等多個方進行了分析,以期建立一個統一有序的視覺體系,增強東湖環湖旅遊線的文化性、藝術性和獨特性,合理安布置配套設施,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽路。
  4. Standard test method for measuring pavement texture drainage using an outflow meter

    用出流量計測量結構量的標準試驗方法
  5. A total of 48 km of sewage pipes were installed, serving an area of 20 square km. as a result, lhasa is no longer muddy during the rainy season. two waterworks were built and connected through a 70 - km network of pipes to some 60 percent of homes

    全城新修柏油馬路15條,全長70公里,拉薩街道變得平坦寬闊了;設上下管道48公里,服務積20平方公里,拉薩再也不是下雨滿城滿城泥了;新建自來廠兩個,管70公里,供積占城區的60 ,拉薩人從此能喝上新鮮清潔的自來了。
  6. A small and tender remontant osmanthus bush and some golden sunflowers greet us at the foot of the east wall. nearby is a small cement platform for flower pots, where some green potted plants flourish. all four walls look new after a whitewash, and in the west end of the yard, a clear water pool, stoves, a kitchen, and a bathroom are available

    當你踏進現今的庭院時,映入眼簾的是一片地的米黃色磁磚,靠著南墻是一整潔的格式泥壁櫃,上放滿同修拿來的缽花東墻腳下,迎接著我們的是一株嬌小的四季桂,旁邊還有金色的太陽花相伴接著緊挨的是專放花缽的小小泥臺,上擺放了生氣盎然的盆栽四墻壁經過粉刷后顯得煥然一新西有潔白的池灶臺,廚房和洗手間供大家使用。
  7. In 2000, the company imported cad systems, cradle - style cloth laying machines, computer automatic cutting system, durkopp computer sleeve machines, computer automatic pocket - hole sewing machines, and macpi computer - control solid press flowline from america, germany and italy. from the course of stocking to processing, and leaving factory, each working procedure is under controlled state in order to prevent unqualified products and insure 100 percent yield

    2000年公司自籌資金,從美國、德國、義大利引進cad放碼、版系統;獨特搖籃式布機,電腦自動裁剪系統,杜克普電腦上袖機、開袋機,邁埤電腦控制立體整燙流線。公司從進貨檢驗,加工直至成品出廠,每道環節、工序都處于受控狀態,以消除和防止不合格產品轉序和出廠,保證產品合格率達到100 % ,全實施"零缺陷工程" 。
  8. Standard specification for post - applied coatings, pavings, and linings for corrugated steel sewer and drainage pipe

    波紋鋼管和污管用后塗覆和襯里材料標準規范
分享友人