排水閘 的英文怎麼說

中文拼音 [bèishuǐzhá]
排水閘 英文
drain sluice
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  1. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,庫產生泥沙異重流的機率較大,能否運動到壩前出庫外,還要看異重流潛入點位置、入庫流量、洪峰歷時、入庫含沙量、門運用等因素,需要做好異重流預報監測工作。
  2. Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control

    第三十七條任何單位和個人不得破壞、侵佔、毀損庫大壩、堤防、、護岸、抽站、渠系等防洪工程和文、通信設施以及防汛備用的器材、物料等。
  3. The water level of the river networkcan be regulated effectively to meet crop demand, by controlling open time and lifting height of thetidal gate

    通過調節擋潮的運行時間和開啟度,使該系統既能滿足澇要求,又能合理控制河網位,使之滿足農作物生長對地下位的要求。
  4. Based on the moveable - bed model tests and some relative studies, it is found that the proposal reservoir for the hongshiyan hydropower station will be a heavy deposit reservoir, its sand - flushing sluice could not effectively de - silt and serious hidden - troubles exist in its diversion tunnel

    摘要待建的紅石巖電站庫屬嚴重淤沙型庫,通過動床工模型試驗和有關研究分析發現,其沖沙沙效果不理想,引隧洞存在進沙嚴重的隱患。
  5. Cast - iron sluice gates for water supply and sewerage

    用鑄鐵
  6. The article introduces the waterproofing and drainage measures and materials for the dam, the foundation of the permanent lock and some buildings of the three gorges project

    介紹了三峽工程中大壩、永久船基礎及一些建築物的防措施和所用材料。
  7. This can fully consider the effect of the structure of transmission line and the selection of lighting parameter etc. by calculating and analyzing various of factor that affect the lightning tripping probability of 500kv double circuit transmission line, we can draw the conclusions : the result by intersecting method is more accord with the practicality circumstance than by existing standard methods, using unbalance high insulation and reverse sequence of wire can reduce the contemporary outage rate of double circuit line, reducing the footing resistance is one of the most efficiency method to reduce the back stroking rate of double circuit transmission line, the double back stroking rate and the single back stroking rate will fall by three ground wire, when the footing resistance is 10 ohm, the back stroking rate by three ground wire is 83 percent of by two ground wire

    在分析輸電線路繞擊耐雷性能時,對線路的雷電屏蔽問題進行了分析,提出對擊距法進行改進,充分考慮了風速的影響因素,編寫了具有工程實用價值的計算線路繞擊耐雷平的程序,此方法可以充分考慮線路結構和雷電參數等對繞擊率的影響。通過對影響500kv同桿雙回線路雷擊跳率的各種因素進行了計算和分析,得到以下結論:採用相交法的計算結果比定義法更符合實際運行情況。採用不平衡高絕緣方式和導線逆相序列可以大大降低雙回同時跳率。
  8. In this paper, numerical simulation on salt water drairming straightly to inland waterway is based on the engineering instance about yaojiang lock in ningbo city. the field of saltwater concentration is attained at any position and any time

    本文結合寧波市姚江船的工程實例,對鹽直接放入內河進行數值模擬,得到河道內任意位置和任意時刻鹽濃度場的分佈。
  9. Resilient - seated gate valves for water supply and drainage service

    用軟密封
  10. Gate valves for water and sewage systems

    和污系統門閥
  11. 2. the distribution of velocity and concentration field are gained by numerically simulating the pulsed non - steady flow field of riverway equipped with navigation lock, after salt water is drained it into

    2 、對船河道的脈沖狀非穩態流場進行數值模擬,得出將鹽放入后河道的濃度場和速度場分佈。
  12. Distributes hoses and their assemblies, valves, couplings, tank truck accessories, liquid and dry bulk handling equipments ; servicing the chemical, petroleum, and dry bulk markets

    -主要生產「 twt 」品牌的各類蝶閥閥止回閥力自動控制閥截止閥和復全式氣閥等。
  13. When building permanent dams and sluice gate structure on navigable or bamboo and log rafting streams, the construction unit must simultaneously build facilities for ship or log passage or, after being approved by departments authorized by the state council, take other remedial measures and also make adequate arrangements for navigation and bamboo and log rafting during the construction period and the initial filling period, and bear the expenses thereby incurred

    在通航或者竹木流放的河流上修建永久性攔河壩,建設單位必須同時修建過船、過木設施,或者經國務院授權的部門批準採取其他補救措施,並妥善安施工和蓄期間的航運和竹木流放,所需費用由建設單位負擔。
  14. For this reason, this paper puts forward a guide wall should be increased to reduce the sand flowing into the tunnel and increase sand - flushing effectiveness of sand gate

    為此,提出了增設一道導墻的方案,以減少引隧洞進沙並提高沖沙沙效果。
  15. Weiyuan lake : perfect mix of form and function the automatic watergate in weiyuan lake the chinese university has the largest campus in hong kong at 134 hectares

    未圓湖以不銹鋼及強化玻璃製成,有四個洪位,利用感應器開關,可調節湖位高低。
  16. Being been produced upon advanced design and technology at home and abroad and fitted with advanced manual and electric actuators and accordance with the standard of 《 cj / t3006 - 1992 cast iron gate valve for water - supply and sewerage 》, our valves are strong in sealing capability, good in antifriction, easy to mount, flexible for opening and closing and long in service life

    本公司的門系列產品符合cj / t3006 - 1992 《供用鑄鐵門》標準,該產品綜合國內外先進的結構和工藝,並採用國內先進的手、電動控制裝置,使得門具有密封性強、耐磨性好、安裝方便、啟閉靈活、壽命長等特點。
分享友人