排水體 的英文怎麼說

中文拼音 [bèishuǐ]
排水體 英文
displacementhull
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 體構詞成分。
  • 排水 : drain off water; drain away water; dewatering
  1. At the same time 7794m3 affusion test were processed, and roadbed settlement observation conducted for two more year, physical mechanism and chemical index experiment were analyzed in the laboratory, section experiment of earth sample was proceed, changement of compacted soil body micromechanism along with depth were analysed by polariscope and scan electricscope. drain ditch, barrel - drain and little bridge were treated by composite geotextile

    在室內進行了物理力學、化學指標實驗分析,並對土樣結構進行了切片試驗,用偏光顯微鏡和掃描電鏡分析了土壤碾壓后沿深度分佈的土微觀結構變化情況,對邊坡、邊溝、溝、小橋涵及護坡封採用復合土工布進行處理。
  2. Archimedes first discovered principle of displacement of water by solid bodies

    阿基米德最先發展固的原理。
  3. Archimedes first discovered the principle that water is displaced by solid bodies

    阿基米德最先發現固的原理。
  4. This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation

    應用流力學理論結合碼頭結構建設,分析了地下泄過程,藉助管道和碎塊石盲溝建立了港口碼頭快速與擋墻基床的方法;運用質量守恆定律和地下滲流原理,建立了港口碼頭計算數學模型和過程計算公式,並用在了碼頭的穩定設計計算中。
  5. In - soluble fibre helps solid wastes pass through the body more efficiently, and thereby reduces exposure of the intestines to toxic substances that can cause intestinal cancer. this kind of fibre also prevents or reduces the severity of constipation, hemorrhoids, and diverticulosis

    溶性食物纖維能加速使糞便外,直接減少廢物在腸道停留時間,減低有害致癌物質在腸臟積聚,能預防腸道癌,避免便秘、痔瘡及憩室病的出現或惡化。
  6. Stream standards refer to quality of receiving water downstream from the origin of sewage discharge.

    標準是指污放點下游的受納質。
  7. Article 24 the local people ' s governments at various levels sha1l organize agricultura1 collective economic organizations and farmers to manage in a planned way the cultivated land with a slope of above 5 degrees but under the reclamation - forbidden degrees, by taking in line with different conditions such water and soil conservation measures as regulating drainage systems, building terraced fields, and practicing a method of cultivation conducive to water and soi1 conservation

    第二十四條各級地方人民政府應當組織農業集經濟組織和農民,有計劃地對禁止開墾坡度以下、五度以上的耕地進行治理,根據不同情況,採取整治系統、修建梯田、蓄保土耕作等土保持措施。
  8. From transportation planning, forestation and water body organization, outdoor setting designing to room dimensions, spatial order arrangement, function designing, possibility of transformation and habitant participation, the principle of pro - human should be implemented through out all the procedures

    從居住區交通規劃、綠化和組織、戶外小品設計到戶內房間尺度、空間秩序安、各功能空間設計、住宅改造的各種可能性以及居民參與設計的方式都始終貫徹人性化的原則。
  9. Hydathode a specialized secretory structure involve in the removal of excess water from plants

    器:是植物用來內多餘份的特化分泌結構。
  10. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防工程、有防要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給管道、設備安裝為2年; 5 、裝修工程為2年。
  11. The results showed the following : the siphon drainage effect of hank slope is not markedly obvious with more penetrable rock soil, hut is obvious for soil with less penetrability

    結果表明:對于滲透性較大的巖土,岸坡虹吸效果不明顯,而對于滲透性較小的巖土,岸坡虹吸效果明顯。
  12. Adopting the construction scheme which combines iron - frame moulded board with unsegragating concrete underwater and encircling steel hoop on glass fiber reinforced plastic mortar pipes, the difficulty in construction of outfall in riprap mound within a short period period is overcome

    摘要通過採用鋼框模板結合下不離析混凝土以及對玻璃鋼夾砂管採用抱箍的施工方案,成功解決了在較短工期內完成拋石棱中出口施工難度大的問題。
  13. The salbes mineral salt is sudoriferous and can discharge the waste and superfluous water in body, promoting the metabolism of skin, and it can also soften dirt and supply salbes mineral salt and minerals, making skin delicate and tight

    索貝斯礦鹽有發汗的作用,它可以內的廢物和多餘的分,促進皮膚的新陳代謝,還可以軟化污垢、補充索貝斯礦鹽分和礦物質,使肌膚細致、緊繃。
  14. Because of the advantages of prefabricated plastic drains over other vertical drains, this technology is widely used in recent soft clay foundation improvement in our country and it has been a main method in drainage consolidation methods

    由於塑料板與其它排水體相比具有諸多優點,近幾年來在國內軟粘土地基處理中被廣泛使用,塑料板法成為固結法中最主要的方法。
  15. Key issues including water plugging types, waterproof board spreading methods, drop of external water pressure and lining design for resisting hydraulic pressure, etc. were studied, thus the composite waterproof and drainage system to control drainage were put forward, including grouting sphere for water plugging, primary support, grid sysytem for waterproof and drainage and lining to resist hydraulic pressure

    重點就堵方式、防板鋪掛形式、外壓力的折減以及抗壓襯砌設計等技術問題進行了研究,提出了可通過注漿堵圈、初期支護、防網格和抗壓襯砌形成綜合防排水體系,它可以達到控制放的目的。
  16. The pore water pressure difference between silt and pvds ( or sand drains ) increases and the soil consolidation velocity is accelerated during the embankment construction

    在路基填築期間,淤泥地基與豎向排水體之間的孔壓差增大,加速土固結。
  17. Some key subjects of numeric analysis were discussed such as : selecting principles of constitutive equations of soft clay, the equivalent theory of vertical drains ground, the definition of load step, the determination of vertical drains as well as the treatment methods of the decline of groundwater level, sealing wall and nearby water source

    著重論述了真空預壓加固地基數值分析中對土本構方程的選擇、砂井地基等效轉換、分析荷載步的確定、豎向排水體的界定、地下下降的處理、密封帷幕的處理、附近補充源的處理等問題。
  18. The mechanics of vacuum preloading was discussed by contrast of vacuum preloading and heaped preloading. the factors affecting the result of vacuum preloading for ground consolidation were as follows : the geological conditions of site, the intensity of vacuum pumping, the condition of underground water and installation of vertical drainage line. through analysis of these factors, some conceptions and design principles were proposed for vacuum preloading

    在此基礎上,通過堆載預壓與真空預壓的對比闡述了真空預壓加固地基機理,分析了影響真空預壓加固地基最終加固效果的各個因素:場地地質條件、抽真空作用強度、地下賦存情況及豎向排水體的設置等。
  19. A method to back analysis the distribution pattern of negative pore - water pressure along vertical drainage line was proposed. some practical vacuum preloading projects were analyzed. the results showed that distribution patterns of negative pore - water pressure along the vertical drainage line were uniform and the magnitude was about half of the vacuum degree under the membrane

    提出由現場實測資料反分析豎向排水體中的負壓分佈的方法,通過對若干工程實例的反分析,認為真空預壓下負壓分佈沿豎向排水體的分佈基本均布,其值約在膜下真空度的50左右。
  20. In spite of modifying coefficient, a modifying term is used to modify brandt ' s theory of sphere grain model ; this term ' s expression has been acquired, and the result is identical to biot - geertsma ' s theory in form and quantity, in which the two classics theories is in perfect harmony. it is also confirmed that the constitutive relation of carroll and n. katsube theory, and the bulk modulu of kuster scattered waves are identical to biot theory

    在工程中的絕大多數情況下,該結果與biot - geertsma理論的結果在形式及數值上幾乎完全一致,從而使這兩個不直接相關的經典理論較好的統一起來。 ( 3 )在土動力學中常用的不條件下,分別證明了carroll的應力-應變關系中不排水體積模量、 kuster散射波理論的積模量與biot - geertsma理論是完全一致的。
分享友人