排沙設施 的英文怎麼說
中文拼音 [bèishāshèshī]
排沙設施
英文
sand bypassing-
Once book our hotel, you can have outdoor barbecue bar, sports ground pingpong, basketball and beach entertainment facility beach balls, volleyball, etc
入住本酒店可免費享用露天燒烤吧酒店運動場地乒乓球籃球及沙灘娛樂設施沙灘足球排球拔河繩等。The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc
分析表明,採用將放淤閘布設在彎道上段的凹岸、彎道設置溢流堰、淤沙條渠的合理分區和科學調度等措施,可以實現試驗工程淤粗排細的目標。For recreation, cactus resort sanya boasts the largest outdoor swimming pool in china, two tennis courts, beach volleyball, mountain bikes, pedalos, billiards, a massage area and a wide range of other indoor and outdoor games
酒店擁有中國面積最大的室外泳池,兩個泥地網球場、沙灘排球場、山地車、腳踏船、撞球、按摩廳等多類型的室內、外運動及康樂設施。During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline
本文通過東湖環湖景觀建設綜合整治二期工程中的茶港親水平臺、沙灘浴場及停車場的道路和景觀設計,對東湖環湖的路面、鋪裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通道等多個方面進行了分析,以期建立一個統一有序的視覺體系,增強東湖環湖旅遊線的文化性、藝術性和獨特性,合理安排布置配套設施,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽路。The resort ' s extensive facilities include a large fully equipped swimming pool with water slide, children ' s pool, and beach volleyball court
度假村設施完善?包括設備齊全的寬大游泳池、滑水道、兒童游泳池和沙灘排球場。Sports activities and courses in physical education are organised at the main campus of the university in shatin for students to participate on a group basis
另外,院方定期安排同學前往沙田香港中文大學享用校園內的大型體育設施,鍛煉體魄。2. detailed introductions are given for the design scheme and engineering situations. 3. the construction design, construction scheme and construction technology of ballastless embedded sleeper track are researched in combining with the constructing of the ballastless track on shahe bridge inside b26 - 1 section on qin - shen railway. the design, application and construction measure for the adjustable up - supporting bracket for track panel are particularly described and expatiated
結合秦沈客運專線b26 - 1標段內沙河無碴軌道實際施工情況,對長枕埋入式無碴軌道的總體施工安排、施工方案以及施工工藝進行了研究,同時重點對長枕埋入式無碴軌道的上承式可調式軌排支撐托架的設計、使用和施工測量控制進行了細致地說明和闡述。The sewerage facilities at the immigration control points at sha tau kok, man kam to and lok ma chau were not designed to cater for the present flow and discharge standards
沙頭角、文錦渡和落馬洲出入境管制站的排污設施並非為應付現時的人流和排放量而設計。Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china
簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例On the basis of analysis on wastewater pollution and water quality monitoring in the shaxi river basin, countermeasures are proposed in order to solve the existing problems, including adjusting industrial structure and rationally arranging industrial allocation, integrated treatment and water environment improvement, total discharge control, fulfilling the benign circulation of water environment, improving the monitoring net and capability, optimizing the allocation of water resources and water environment quality, hastening the construction of sewage treatment plants, and making the water quality of the effluents reach the national standard
摘要在分析沙溪流域廢污水排放、水質監測等情況的基礎上,針對流域水環境存在問題,提出了沙溪流域水環境對策措施:調整產業結構,合理工業布局;實施綜合治理,改善水環境;實行總量控制,實現水環境良性循環;完善監測網路,提高監測能力;優化水資源配置方式,改善水環境質量;加快污水處理廠建設,實現達標排放。In view of the increasing population in tseung kwan o, students proposed to build more sports facilities in the district, such as basketball court, beach volleyball court and football field
將軍澳的居民不斷增多,同學建議需加建體育運動設施供居民使用,如籃球場、沙灘排球場和足球場等。分享友人