排泥孔 的英文怎麼說

中文拼音 [bèikǒng]
排泥孔 英文
mudhole
  • : 排構詞成分。
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  1. The effective adhesion of permeable base and asphalt pavement, good residence of scouring property of mixture and good drainable property are benefit for undersurface of pavement and permeable base course to keep good successive contact condition

    隙水穩定碎石水基層和瀝青面層的有效聯結、混合料本身良好的抗沖刷性能和良好的水性能,有利於瀝青下面層和水基層的層間接觸條件維持在連續狀態。
  2. Fibre - cement pipes for sewers and drains - manholes and inspection chambers

    下水管和水道用纖維水管.人和檢驗井
  3. Fibre - cement pipes for drains and sewers - part 2 : manholes and inspection chambers

    雨水和污水放用纖維水管.第2部分:人和檢查室
  4. Fibre cement pipes for drains and sewers - part 2 : manholes and inspection chambers ; german version en 588 - 2 : 2001

    水管和下水道纖維水管.第2部分:人和檢查室
  5. The sediment model tests for the desilting bottom intakes of two hydropower stations are introduced herein, in which a new combined type of " grid desilting gallery + desilting bottom intake " ( grid desilting bottom intake ) is put forward

    文中介紹了2個電站進水口沙底沙模型試驗情況,提出了一種新的「格柵式沙廊道沙底」的組合型式(簡稱格柵式沙底) ,取得了理想的沙效果,較好地解決了工程實際問題。
  6. The pore water pressure dissipation in the silt is produced mainly by lowering of groundwater table and pore water pressure dissipation in the pvds ( or sand drains ) is produced mainly by vacuum degree

    地基中隙水壓力消散主要是由於地下水位線的下降引起的;而砂井或塑中的壓消散大部分由真空度直接引起。
  7. The pore water pressure difference between silt and pvds ( or sand drains ) increases and the soil consolidation velocity is accelerated during the embankment construction

    在路基填築期間,淤地基與豎向水體之間的壓差增大,加速土體固結。
分享友人