排洪能力 的英文怎麼說
中文拼音 [bèihóngnénglì]
排洪能力
英文
flood carrying capacity-
In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively
本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。Currently sewage in sewage pumping station system is pumped manually. so the station is working in low water level and energy is consumed. this mode ca n ' t predict the inflow ' s changing
當前污水泵站排放系統主要採用人工值守方式排水,低水位高揚程耗能嚴重,且缺乏預測能力,流量洪峰來臨時易產生污水溢出污染。For this reason, the comprehensive layout and integrated regulation of the area from zhuqi to kegong in minjiang river are urgently needed, these measures will improve the natural conditions of minjiang river and enhance the ability of flood controlling, shipping and drainage to insure the security of fuzhou
為此,急需對閩江竹岐至科貢、文山裡河段進行全面規劃和綜合整治。使得在經濟持續高速發展的同時,改善閩江自然條件,提高防洪排澇、通航及取排水等能力,確保福州市防洪安全。Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river
在現場查勘的基礎上,通過對丹江口水庫和小浪底水庫攔沙初期下遊河道演變、排洪能力變化特點的對比,分析了黃河下游防洪面臨的新形勢:小浪底水庫攔沙初期,下遊河道發生沖刷,但艾山以下窄河段沖淤變化不大,近年來形成的淤積萎縮的狀況難以很快改觀,游蕩性河段調整劇烈,工程出險機遇增大,河道水位流量關系中水流量以下部分同流量水位明顯降低,中水流量以上部分水位降低幅度可能會明顯偏小,防洪形勢仍不容樂觀。Under this arrangement, efficient maintenance and conservation of the capacities of these watercourses can be effected to reduce the probability and severity of flooding
在這安排下,維修水道的效率便可提高,排水道的排洪能力也得以維持,這絕對有助於減低水浸的次數及嚴重程度。The new contractor successfully completed the critical river channel works to provide a flow capacity of 1 in 10 year before the wet season of 2002, which reduced the flooding risk in the areas alongside the upper river indus, he added
他說,結果新承建商趕及在二二年雨季來臨前完成關鍵河道工程,提供接近十年一遇的排洪能力,減低河道兩旁村落受水浸的威脅。The completion of the works is a remarkable milestone in relieving the residents of the north district from the perennial flooding menace. the five - year river training works, with a total cost of 1. 2 billion, have upgraded the capacity of the river channels to cater for one in 50 year rainstorms
拓展署完成新界北區梧桐河盆地的治河工程,將河道提升到五十年一遇的排洪能力,整套治河工程總共耗資十二億港元,施工期歷時近五年多。This text handles a tunnel for draining off water in huangjiawangarbage ground, in yichangcities is for the example, intro - ducedthe support techniqueofthe anchored bar, thesprayed concrete associated withthereinforcement matwhich is used in theengineeringconstruction, and pass to monitor, express the support technique can develop to the maximum bearing, and become the passive support becomean active support, so the the support technique guarantees the stabilizationof the tunnel and the normal proceeding of theconstruction with theengineering
摘要以宜昌市黃家灣垃圾處理場排洪洞為例,介紹了錨噴網支護技術在淺埋軟弱圍巖隧洞施工中的應用,並通過監測,表明錨噴網支護能最大限度地發揮圍巖的自承能力、變被動支護為主動支護,從而保證隧洞圍巖的穩定和工程施工正常進行。There have been great changes of boundary conditions in the lower yellow river in recent years owing to the influence of water and sediment development and human activities
小浪底水庫投入運用后,黃河下游在較長時期內受下泄清水影響,河道沖淤演變及排洪能力將會發生較大的變化。In the northern new territories, one of the critical flood mitigation undertakings is the shenzhen river regulation project, which is aimed at improving the downstream outlet for several major rivers in sheung shui and ta kwu ling
在新界北部,較重要的防洪工程包括治理深圳河計劃? ?目的是提高位於上水及打鼓嶺地區的主要河流出口的排洪能力。There is sharp gradient in top and small gradient in bottom. the ability of removing flood is high in top and it is small in bottom correspondingly. sediment silt up continually, so the bed of river is jacked up year by year and become the famous river on land
由於泥沙含量高,現行河道已行水140餘年,山東段河床上寬下窄,坡度上陡下緩,排洪能力上大下小,在泥沙淤積作用下,河床逐年抬高,成為世界上著名的地上「懸河」 。The alteration and conversion of natural streams to drainage channels has enhanced the natural capacity of freshwaters to assimilate volumes of floodwater and surface drainage, but channelisation also results in a loss of ecological capital stock since drainage channels cannot be colonised by normal stream assemblages of flora and fauna
有部分天然溪澗已改成渠道,這提高了淡水河道吸納洪水及地面排水的天然能力,但亦損害了生態方面的資產,因為渠道並非如溪澗一般可以供動植物棲息生長。分享友人