掘進斷面 的英文怎麼說

中文拼音 [juéjìnduànmiàn]
掘進斷面 英文
excavated section
  • : 動詞(刨; 挖) dig
  • : 進構詞成分。
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 斷面 : section; fracture surface; plane of fracture
  1. The new applications of survey are described in the fields of indicating underground advance, seeking out lossed ore deposit, discovering neotype deposit for detecting the gold deposit ; determining productive aquifer for looking for groundwater ; discovering fracturation zone controlling crop out of hot spring for developing the hot spring, and locating the position of ancient rock slide for prospecting the earth slide

    摘要綜述了應用輕便測量技術在地礦及地下水尋找等方的一些新應用,例如:在金礦勘探中指導坑道,找到了被遺漏的礦體,發現了新的礦化類型;在地下水尋找中,確定了富水層位;在溫泉開發中,探明了控制溫泉出露的裂帶;在滑坡研究中,確定了古滑坡的具體位置。
  2. Quality control of the operation of tbm full - size tunnelling machine

    隧道機在隧道施工中的質量控制
  3. Treatment to lost blast in grent fault drifting working face

    工作的丟炮治理
  4. Give priority to develop and manufacture full - face excavator, large - tonnage hydraulic excavator, heavy - tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders

    重點開發生產全機、大型液壓挖機、大噸位輪式裝載機、系列汽車起重機以及靜液壓式中小噸位和多功能裝載機。
  5. Advancement of doorhead by full section descending slicing

    下行分層全馬頭門
  6. Full face driving

  7. Research on isolated gas drainage mechanism and application for heading face

    工作式抽放瓦斯機理及應用研究
  8. In order to facilitate selection of tbms in a project based on engineering geology and hydrogeology conditions, project characteristics and environmental constraints, it is necessary to understand the operation mechanisms of different tbms and classify them accordingly

    本文介紹了各種類型的全隧道機的運行機理,並根據最終開挖隧道,掌子的支護類型及巖土體的破碎機理對全隧道行分類。
  9. As support and liner against cross section rock, spraying - concrete has enormous influence on the tunneling progress and the safety of the tbm tunnel ' s tunneling machine

    作為隧洞巖石支撐和襯砌的重要手段之一的噴射混凝土支護對tbm隧洞度和安全影響極大。
  10. Based on the theory of detonation dynamics and fracture mechanics and combined with engineering experiences, the parameters of soft rock tunnel hole charge and smooth blasting are analysized to enhance tunnel excavation proficiency in soft rock and smooth blasting. value scope of smooth blasting is acquired, which can give some experience for parameters design and construction of smooth blasting in soft rock tunnel excavation

    摘要為提高軟巖巷道效率和光爆效果,利用爆轟動力學和裂力學理論,分析了軟巖巷道掏槽及光爆參數,結合工程實踐經驗,得出了軟巖巷道光爆破參數的取值范圍,對軟巖巷道爆破參數的設計和施工具有一定的指導意義。
  11. Kkl102 air refrigerator for mines application is used to lower tempdrature of underground coal mines, and it can decrease the temperature of mining work surface of 14 ? section from 32 to below 26 rapidly

    Kkl102礦用空氣製冷機用於降低地下煤礦工作的溫度,能迅速將為14 ?的工作的溫度由32降到26以下。
  12. Construction measures for accelerating excavation of long and small tunnel

    加快長距離小隧洞速度的施工措施
  13. It is quite evident that the rm - 80 is not suited to working on the harden ling. in order to make rm - 80 be suited to the conditions in china, we conduct an analyse and a calculation theoretically on excavating obstruction, excavating productivity and traction ability sa well. so that we can choose a better matching of produvtivity to solve problem of insufficient ability of excavation

    為使rm80型全道碴清篩機的性能適合我國國情,我們從理論上對該機在板結地段作業時的挖阻力、挖功率及作業工況下的牽引能力行計算分析,從而選擇出一種更好的功率匹配關系,解決挖能力不足的問題。
  14. The primary contents are as follows : 1. according to the feature and the theory of shield tunnel construction, based on the factors that cause effects on environment, the workable monitoring project is established, which include principles of design, the selection of monitoring cross section, the layout of monitoring points, monitoring content and materials feedback. such as operation program, selection of earth pressure, wall - back grouting, rectification of shield machine, which are used to reduce the effect of construction on environment, are analyzed in detail

    完成的主要研究內容如下: 1 、根據盾構法的施工特點及原理,在明確了盾構施工安全影響因素的基礎上,從監測方案設計原則、監測的選擇、監測點的布置、監測內容以及信息反饋等出發,提出行之有效的監測方案;詳細分析了模式、土壓力選擇、壁后注漿、盾構糾偏等施工控制手段,用來減小盾構施工對周邊環境的影響。
  15. Those mentioned above has already been proved either in and outside our country. infact, when the machine works on the track which is mudding and hardening, especially on hardening line, rm - 80 can not give full play to it ' s productivity, and sometime the machine can not go forward with excavating chain turnning, which results in a low productivity of not more than 100 meters per hour

    在我們的生產實際中,尤其在板結地段, rm80型全道碴清篩機的作業效率就不能得以充分的發揮,經常出現挖鏈轉不動、清篩機不前,或者是作業效率很低,以致於每小時作業速度不足百米的情況。
  16. Full face round

    炮眼組
  17. Roadheader is a part profile tunnel boring machine which can excavate, convey rock blocks and walk by itself. it is very suitable to excavate soft - rock tunnel

    臂式機是一種集開挖、裝碴和自動行走於一體的部分隧道機,它非常適用於軟巖隧道的
  18. The directional breaking blasting technology for underground development used in xishimen iron mine is described. a comprehensive summary is made of it which includes the test technology, the blasting parameters and the on - site application effect so as to provide precious experiences for other mines

    論述了西石門鐵礦井下定向裂爆破技術,對其試驗工藝、爆破參數、現場應用效果等方行了全總結,為其它礦山井下提供了寶貴經驗。
  19. Venfilation of combined way of pressing in one - way coalroad driving long distance cross - section

    長距離大單巷壓入式聯合方式的通風
  20. Several pretensions on quick advancement at hard heading with big fault

    巖巷快速的幾點體會
分享友人