  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧的設計和施工中面臨的一些問題,選取隧的一個典型斷面進行滲流、滲控分析和及支護的有限元數值模擬,從而就深埋隧不同的及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了索、研究。
  2. First, based on comprehension analysis of the present study status on optimizing method to displacement back analysis in underground engineering home and abroad, intelligent optimizing method, which fits the features of underground engineering, has been developed by introducing annealing algorithm and genetic algorithm and improving them. second, according to practical features of nonlinear displacement for underground engineering, the mechanical model on back analysis to initial ground stress and mechanical parameters of surrounding rock mass in underground engineering is established, which is based on the measuring results of displacement of convergence in underground holes. while, by introducing finite element method and combining improved annealing algorithm and improved genetic - annealing algorithm, the theory and method of elastic - plastic displacement back analysis to surrounding rock in underground engineering has been founded

    首先,本文在綜合分析國內外地下工程優化位移反分析方法研究現狀的基礎上,引進模擬退火與遺傳演算法,並對其進行改進,建立了適合於地下工程問題特點的智能優化演算法;其次,根據地下工程非線性特點,基於地下工程周收斂位移量測結果,建立了用於地下工程初始地應力與圍巖力學參數反演分析的力學模型,並引進有限元分析手段,結合改進模擬退火演算法與改進遺傳-模擬退火演算法,分別建立了基於這兩種智能優化演算法的地下工程圍巖彈塑性位移反分析理論與方法,並發了相應的分析計算程序,為地下工程圍巖穩定性與順序優化分析奠定了基礎;然後,在上述基礎上,根據地下工程施工順序優化設計的特點,建立了基於圍巖塑性區面積的地下工程施工順序優化分析模型,基於改進模擬退火演算法與改進遺傳-模擬退火演算法建立了地下工程施工順序優化分析方法,並發了相應的分析計算程序;最後,將上述分析計算程序用於工程實例分析,討了其應用方法,證明了該文研究成果的合理性和可靠性。
  3. The construction of the multiple - arch tunnel is deeply related to the form of center partition, the tunnel ' s section and excavation method etc. the change regularities of stress field caused by excavation are studied by 4 multiple - arch unlined tunnel model tests. the difference in lining for various multiple - arch sections is analyzed and the mechanics characteristics of center partition is discussed. then, a reasonable construction method for multiple - arch tunnel and a better section are put forward

    通過4個連拱模型試驗,研究了連拱毛引起的應力場變化規律,對不同的連拱斷面的襯砌受力差異進行了深入的分析,同時對中隔墻的受力特點也作了討,提出了合理的連拱隧道構築方法及優化斷面圖。
  4. The excavation verifies that the anomaly characteristics of the gpr accord with true position of the subterranean cavitation

    驗證,地雷達異常特徵與地下空實際位置相吻合。