接力站 的英文怎麼說
中文拼音 [jiēlìzhàn]
接力站
英文
relay station-
Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems
接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的吊裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。Then the old specimen in the corner who appeared to have some spark of vitality left read out that sir anthony macdonnell had left euston for the chief secretary s lodge or words to that effect. to which absorbing piece of intelligence echo answered why
接著,坐在角落裡的那個彷彿還剩有幾分活力的怪老頭261讀道:安東尼麥克唐奈爵士從尤斯頓車站出發,前往次官官邸,或諸如此類的消息。Selection of preheated temperature for tgp penstock welding
三峽工程左岸電站引水壓力鋼管焊接預熱溫度的選擇They had special receiving powers , not unlike a satellite receiving station
他們有特殊的接收能力,這與衛星接收站相似。Electromagnetic environment protection requirements for microwave relay stations
微波接力站電磁環境保護要求The icv provides protected transport for an infantry squad and direct fire support during the dismounted assault. the icv carries a 9 - man squad and retains the capability to provide effective supporting fire to the squad while it is dismounted. the primary design of the iav has two variants : the infantry carrier vehicle and the mobile gun system
美軍裝備的「斯崔克」 icv ,是新組建的中型旅主要作戰裝備,能夠完整的輸送一個步兵班,駕駛員車長,及后艙的9名步兵,除可以提供行進中的保護外,還能為下車作戰提供直接的火力支援,使用的頂置武器站可以根據任務而改變,可選擇的武器: m2hb 12 . 7mm機槍, mk - 19 40mm榴彈機槍。The route of the beijing olympic torch relay has been decided with hangzhou as a stop
北京奧運火炬接力路線已經確定,杭州是其中一站。In order to prolong the distance of slurry transportation, the general transportation method is to add pumping station, which is expensive and inconvenient
為延長排距,傳統的方法是採用中間接力泵站,但其投資費用大,而且調整不方便。This plan avoids the phenomenon that it is too hot at the nearer of the heatsource but too coid at the end. most big heat - net use indirect heat - supply mode, when the fist - net can provide enough thermal energy, the regulating system can run dependably according the initial value
為解決好熱力站的爭熱現象,提出「熱量均攤」控制策略,避免了熱源近端太熱而末端太冷的現象的發生。大型熱網普遍採用間接供熱方式,當一次熱網供熱能力充足時,調節系統會根據設定值可靠運行。As a result a major concert was organised at the end of the torch relay as well as numerous events along the route through london, in conjunction with many london boroughs
最終,在臨近奧運火炬接力活動的尾聲,倫敦組織了一場大型的音樂會,並在整個倫敦站及眾多倫敦自治市鎮舉辦了各種精彩紛呈的活動。Between the two villages on another trail, and just a 20 - minute stroll from the ferry at yung shue wan, is hung shing yeh beach
從榕樹灣渡輪碼頭步行20分鐘,便到達洪聖爺灣。盡管這里接近電力站,卻經常有不少人到此進行日光浴。Apr. 11st 2005, principle agreement for qinhuangdao lng terminal, and trunkline and gas power project was signed between cnooc gp, china power investement corporation and qinhuangdao municipal government
4月11日,中海石油天然氣及發電有限責任公司、中國電力投資集團公司和秦皇島市政府在秦皇島簽訂《關于合作開發建設秦皇島lng接收站線項目及燃氣電廠項目的協議》 。On 1st september 06, china light power announced that it proposed to build a liquefied natural gas receiving terminal at south soko island
2006年9月1日,中華電力宣布建議在大鴉洲興建液化天然氣接收站The recent proposal by china light and power to build a liquefied natural gas receiving terminal at south soko island is a threat to the existence of the chinese white dolphin in hong kong waters
中華電力下稱中電最近建議在大鴉洲興建液化天然氣接收站,威脅香港水域的中華白海豚的存活。Wwf considers the decision made by the environmental protection department to approve the eia report of the china light and power s liquefied natural gas receiving terminal and associated facilities a bad precedent for the hong kong environment
本會認為環境保護署環保署批準中華電力中電液化天然氣接收站及相關設施的環境影響評估報告,在香港環境保護的前題下,立下一個極差的先例。Wwf believes the government should appoint an independent auditor to evaluate the potential for this crucial gas field to continue supplying hong kong, and to publicly release the findings of the investigation so as remove all doubt as to the urgency of building a new lng terminal in hong kong, and facilitate rational site selection
本會認為政府應該委派獨立專業人士,評估這塊重要氣田繼續向香港輸氣的能力,並公開調查結果,以釋除市民對中電急於興建新液化天然氣接收站的疑慮,同時促進有關方面選擇合理的地址。The rescue tools power pack is delivered as a compact ready - to - use unit which only needs to be connected to the hydraulic system of rescue vehicle
該動力站只需將其同搶修車輛的液壓系統連接,便可以發揮所有的功能。Wwf questioned both clps intentions to construct a liquefied natural gas terminal on the soko islands, and the government silence on the development of a uniquely rich marine area today
世界自然基金會對于中華電力在大小鴉洲興建液化天然氣接收站的計劃,以及政府對發展這片位置獨特物種富饒的海岸范圍保持緘默的態度表示質疑。One of primary arguments of clp for the need to put an lng terminal on the soko islands, rather than at black s point where their gas fired power station is, has been that i existing gas supply from the yacheng gasfield, near hainan island to black s point will run out sooner than anticipated and, ii a lng terminal can be built more quickly at the soko s than at other sites
中華電力公司下稱中電聲稱必須在大鴉洲興建液化天然氣接收站,而不選擇在現有的鼓灘天然氣發電廠的原址興建新站,當中的主要原因包括:一現存的海南島崖城供港天然氣田壽命比預期短,以及二在大鴉洲興建液化天然氣接收站比在其他位置興建的施工期較短。After reviewing the major components of the environmental impact assessment for black point as a potential site for the liquefied natural gas terminal for hong kong, wwf considers that clp has not provided a balanced comparison for the two potential sites : black point and south soko island soko
中華電力下稱中電就在香港興建液化天然氣接收站的可行選址進行環境影響評估,世界自然基金會審閱當中的鼓灘部份后,認為中電並沒就鼓灘與大鴉洲兩個可行選址進行公平的比較。分享友人