接合板樁 的英文怎麼說

中文拼音 [jiēbǎnzhuāng]
接合板樁 英文
connecting pile
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • 接合 : joint; zygosis; juncture; articulation; concrescent; nexus; coaptation; syndesis; synapsis; meet;...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼箍法」做地基梁鋼筋連點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜闡述,並就人工挖孔、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔施工採用鋼筋砼護壁確保挖孔的安全成型,使用柔性連鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜施工技術的可行性。
  2. Because interaction between pile - raft foundations and soil is very complex, what ' s more, there are many effect factors, piles and caps ( or rafts ) form a common working system whose bearing capacity and settlement are affected and restricted by interaction between them. the method of computing settlement that code provides is not a pure theoretic method and it is an experiential method in essence. in this paper, based on engineering designs of taiyuan, in - site experiments, observation data of structure settlement and so on, settlement is analyzed and computed by applying mindlin stress formula and using software matlab

    現規范推薦的基沉降計算方法,並不是一種純理論的方法,其實質是一種經驗擬的方法;本文結太原地區的工程設計、現場試驗、主體沉降觀測資料等,運用明德林( mindlin )應力公式,然後按分層總和法原理,採用matlab軟體計算程序進行沉降計算、分析,結果表明:高層建築?筏基礎沉降較小,且較均勻,得出了太原地區的?筏基礎沉降計算的經驗系數_ p ,從而使設計、計算結果更近於工程實際,同時考慮筏對上部結構荷載的分擔是理的、先進的,對高層建築?筏基礎加強了認識。
  3. Abstract : combined the engineering field, this paper introduces a kind of the butt weld in the flat position technology of the steel flat pile using simply device

    文摘:結現場實際,介紹了一種利用簡易設備實現鋼技術。
分享友人