接收狀態變量 的英文怎麼說

中文拼音 [jiēshōuzhuàngtàibiànliáng]
接收狀態變量 英文
receive state variable
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : Ⅰ名詞1 (形狀) form; shape 2 (情況) state; condition; situation; circumstances 3 (陳述事件或...
  • : 名詞1. (形狀; 狀態) form; condition; appearance 2. [物理學] (物質結構的狀態或階段) state 3. [語言學] (一種語法范疇) voice
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 接收 : 1 (收受) receive; reception; accept; [電學] receipt; receiving 2 (接管) take over; expropriat...
  • 狀態 : status; state; condition; state of affairs: (病的)危險狀態 critical condition; 戰爭狀態 state o...
  1. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉橋結構設計理論和懸臂施工方法的特點,提出了以最佳成橋作為施工控制的最終目標,以實施最佳施工階段為技術路線,以索力調整為核心內容的斜拉橋施工控制理論,簡稱為最佳成橋法;以斜拉橋主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化,建立了最佳施工階段的索力調整計算模型;推導了考慮徐縮效應的索力調整計算公式;用最佳成橋法對一實橋工程進行了施工控制全過程計算研究,得到的成橋與設計目標相當近,優于該橋以「雙控」為控制目標的實測結果,有力地證明了本文方法的正確性及其工程實際價值
  2. Firstly, according to the characteristic that the doppler frequency shift signal can be approximated as a single sinusoid signal, the extended sinusoid signal retrieval ( pisarenko and esprit ) methods are presented and signal state and measurement formulations are developed, so the kalman filter recursive method is got. the brief introduction of low velocity moving target doppler frequency shift signal wigner - ville transformation and wavelet transformation expression are presented in this paper. secondly, because the clutter is gaussian distribution, cumement and high - order spectrum based methods are presented and the simulation results prove their good performance to suppress gaussian clutter in low velocity moving target doppler frequency shift signal processing

    一個方面是根據低速目標的多普勒信號可簡化為單一正弦波形式這一特點,得到了擴展的高斯色噪聲背景下的諧波恢復演算法,即高斯色噪聲中的pisarenko諧波恢復法和旋轉因子不法( esprit ) ;並推導了信號的方程和觀測方程,進而得到基於卡爾曼濾波的遞推演算法對信號進行提取;本文還簡單的介紹了低速運動目標的多普勒頻移信號的wigner - ville換與小波換;另一個方面是針對雜波服從高斯分佈這一特點,提出了對信號求累積和高階譜來對高斯雜波進行抑制。