接水建築物 的英文怎麼說

中文拼音 [jiēshuǐjiàn]
接水建築物 英文
barrage
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • 接水 : water impact
  1. It can also restrain the decomposition of organic substances in the soil and the bind of nitrogen, and wash away the nutritious elements, such as magnesium, calcium, and potassium. the acid rain deprives the soil. it acidifies the rivers and lakes, and dissolves the heavy metal in the soil into water, therefore poisons the fish

    它可以直使大片森林死亡,農作枯萎;也會抑制土壤中有機的分解和氮的固定,淋洗與土壤粒子結合的鈣、鎂、鉀等營養元素,使土壤貧瘠化;還可使湖泊、河流酸化,並溶解土壤和體底泥中的重金屬進入中,毒害魚類;加速和文古跡的腐蝕和風化過程;可能危及人體健康。
  2. There was now visible a house or houses - for the building spread far - with many windows, and lights burning in some ; we went up a broad pebbly path, splashing wet, and were admitted at a door ; then the servant led me through a passage into a room with a fire, where she left me alone

    這時看得見一間,也許是幾間房子,因為那鋪展得很開,上面有很多窗子,其中幾扇里亮著燈。我們踏上一條沫飛濺的寬闊石子路,后來又進了一扇門。著僕人帶我穿過一條過道,進了一個生著火的房間,撇下我走了。
  3. Its good effect is proven by actual operation, providing reference for solving the seepage problem in water feeding structures

    為根本上解決輸縫止滲漏問題提供了借鑒和參考。
  4. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連改進傳統的電焊連方式,採用大量採用鋼筋頭機械連技術,有效提高了頭強度和鋼筋連速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了的整體性和耐久性。
  5. Used to component joint water - proof, building distortion seam, construction seam and metal, concrete etc seam water - proof, for example, tunnel, substructure etc underground seam water - proof construction

    適用於裝配式結構構件砌縫防變形縫、施工縫用和金屬、混凝土等各類預製件的縫防,例如:隧道、人防、基礎工程等地下工程的縫防
  6. Tai koo dockyard and tai koo sugar refinery had built some important composite industrial buildings, as well as developed the area into a self - sufficient community with bungalows, shops of various kinds, a hospital and several reservoirs. furthermore, a cable car system had been built to carry staff up the hill

    太古船塢和太古糖廠更在該區興了重要的工業綜合,並將該處地區發展成自給自足的生活區,不但興了平房、各式商店、一所醫院和數個塘,而且更造了一個架空纜車系統,載員工往山上去。
  7. Water - proofing of buildings - part 9 : penetrations, transitions, connections and endings

    的防性.第9部分:滲透轉換連和端
  8. Plastics piping systems - thermoplastics piping systems for soil and waste discharge - test method for airtightness of joints

    塑料管道系統.內糞和污排放下道用熱塑管道系統.連件的氣密性試驗方法
  9. An emphasized study on what mentioned above for the water system of the urban center of guilin city and the relevant planning of flood control is described herein

    文中重點研究了桂林市中心城系中環境容量、體的連與流動、系之間的連以及城市系的防洪規劃等內容。
  10. Shipbuilding and marine structures - filling connection for drinking water tanks - components

    造船和海上.飲用箱注頭.部件
  11. Shipbuilding and marine structures - filling connection for drinking water tanks - general requirements

    造船和海上.飲用箱注頭.總要求
  12. Shipbuilding and marine structures. filling connection for drinking water tanks. part 2 : components

    造船工業和海上.飲罐用注頭.第2部分:元件
  13. Shipbuilding and marine structures. filling connection for drinking water tanks. part 1 : general requirements

    造船工業和海上.飲用箱注頭.第1部分:一般要求
  14. Water - proofing of buildings - part 8 : water - proofing over joints for movements

    的防性.第8部分:活動連頭的防
  15. Domestic renovation work often creates noise and air pollution nuisances. expedient drainage connection leads to long lasting water pollution problem. in removal of unauthorized building works, there could also be asbestos removal problem

    家居裝修工程經常發出噪音,並造成空氣問題錯誤駁的污喉管亦會引致質被污染的情況在清拆違例時,亦有可能會衍生處理含石棉廢方面的問題。
  16. These early developments were mostly not at that date on mains drains, and nightsoil was removed each night from the houses

    當時,這些早期發展的大多沒有連渠,因此住戶的糞便須每晚從屋內清走。
  17. Within the water system planning, the main studies must be made on the problems related to the urban ecological environment i. e. the water environmental capacity, water storage condition of lakes and the layout, the water - body connection and flowing, the structures for water body connection and the reception facilities etc

    系規劃中應著重研究城市生態的環境容量、湖泊蓄條件和布局、體連與流動、以及系的連與觀賞設施等問題。
  18. The excavating method of protected level of foundation for hydraulic structure is concemeted with the quality, progress and benefits of engineering

    基礎保護層開挖方法直影響到電工程的質量、進度和效益。
  19. Some buildings were originally installed with toilets that made use of subterranean or stream water and owners of these buildings found it extremely difficult to change to seawater because substantial changes were required to the existing plumbing and other ancillary structures. these modifications were expensive therefore owners did not accept them

    至於原來已設有利用地下或山坑作排污用途的,除需將原有沖設施改裝外,輸送海的管道及其他配套設施,均較一般使用淡或山坑的管道昂貴,故多不為業主受。
  20. As a project financed by yunfeng and ming tomb hydroelectric power station, the study on " mathematical model for dam safety monitoring and dynamic inverse model for underground power house " was conducted. according to the data observed in - situ, the under - fitting problems in regression models for dam safety monitoring were discussed, and the computational parameters and boundary conditions of underground structures were determined on the base of dynamic inverse mathematical model

    本文利用大壩運行監測資料和電站廠房結構的振動測試數據,對的正反分析模型中的相關問題進行了探討,分析了大壩安全監測回歸模型存在的欠擬合現象,立了通用的結構動力最優化反分析模型,實現用戶優化演算法對復雜結構的直調用和優化計算,在計算模型方法的基礎上對雲峰寬縫重力壩的安全狀況和十三陵抽蓄能電站的動力反演問題進行實例分析。
分享友人