接連的水道 的英文怎麼說

中文拼音 [jiēliándeshuǐdào]
接連的水道 英文
successivewatercourse
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : 4次方是 The fourth power of 2 is direction
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 接連 : on end; in a row; in succession; running
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  1. Operating instructions : use the upper right - hand corner of each screen is the pipeline, the water hydrants connected to the ignition point fire

    操作指南:使用畫面右上角每次所給出,將消防栓到著火點滅火吧
  2. Two containers of mercury, connected by a small-bore pipe, are mounted so as to tilt with the gyro.

    兩個裝有容器用小口徑,安裝得使它們可以隨著陀螺傾斜。
  3. " and today our toilet isp team is pleased to be leading the way through the sewers, up out of your toilet and - splat - right onto your pc.

    「如今,我們廁所isp團隊對于能領先於這一領域感到很高興,實現了個人電腦與廁所中下。 」
  4. " and today our toilet isp team is pleased to be leading the way through the sewers, up out of your toilet and - - splat - - right onto your pc.

    「如今,我們廁所isp團隊對于能領先於這一領域感到很高興,實現了個人電腦與廁所中下。 」
  5. Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures, pipes, and laterals

    加筋混凝土暴雨排溝設施管和橫向排溝間溝回彈性標準規范
  6. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫跨新田東面主要排單線行車路橋,以沿該主要排東面近車輛輪候區現有未命名路與淳裕路
  7. Measure the space where the existing electric water heater now sits ( including necessary plumbing, venting and gas connections ) and note its existing tank size

    測量現有電熱器所佔有空間(包括必要,通風和燃氣) ,注意現有器容積大小。
  8. The thesis also makes a full illustration on the optimization of sewage pipe net which consists of the optimization on pipe connection in examing well

    管網優化設計也包括管在檢查井內優化,本文也做了詳盡闡述。
  9. A civil airport in the county town is undertaking. the geothermal energy resouces have been utilized properly. a hot spring plaza has set up in the town, where vistors can enjoy the perfect facilities and services

    城東鄰永安南巖,兩條平坦如砥穿行境內城民用機場已在籌建之中豐富地熱資源得到開發利用, 「溫泉滑洗凝脂」 ,坐落在城區溫泉大廈,設施完善,為遊人提供優質服務。
  10. The relief valve should never be solidly piped into a drainage ditch, sewer or sump

    安全閥絕不能用堅硬到排溝、排管或污坑裡。
  11. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    壩外,其他配套工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷; (二)一條長5 , 500碼,可塘隧亞賓尼濾池及配庫,該引用石及磚砌成,每天可輸700萬加侖; (三)位於亞賓尼渠東部六個過濾池,該濾系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖,原過濾后,經一條直徑18寸鐵管,流入花園與寶雲交界庫。
  12. District heating pipes - preinsulated bonded pipe systems for directly buried hot water networks - pipe assembly of steel service pipe, polyurethane thermal insulation and outer casing of polyethylene

    區域供暖管.直埋式熱供暖網預絕熱系統.聚氨酯絕熱層和聚乙烯外覆層鋼管組件
  13. The main shuchural features of the new electric single - girder overhead travelling crane presented in this paper is as follows : using a special gisder section to provide simple production technology and light weight ; dopting hinged connection at one end between main glrders and end carrages instead of the rigid connection at both ends, eliminating the three - point supporting problem with the crane and thus improving the travelling perfomance ; extending crane wheels life contributed to the combination of no - flange crane wheels and horizontal rollers

    提供種生產工藝簡單、自重輕主梁截面,並將單梁起重機主、端梁剛性改為端用鉸,解決了在製造和軌安裝時因誤差而造成大車運行三條腿現象,提高了運行性能;用可調大車運行平輪中心距設計,代替帶輪緣大車輪,提高大車輪使用壽命。
  14. It is bounded by the lion rock mountain ( sze chi shan ) and tate s cairn ( tai lo shan ) to the north ; the kowloon peak ( fei ngor shan ) to the east ; new clear water bay road and prince edward road east to the south ; and junction road and lion rock tunnel to the west

    北面以獅子山及大老山為界,東臨飛鵝山,南新清及太子東,西聯合及獅子山隧。本區現有三條跨區公路、多條區內各處區域干線和兩條行車隧(指其南面出入口而言) 。
  15. Plastics piping systems for the transport of water intended for human consumption - migration assessment - determination of migration values of plastics pipes and fittings and their joints

    用於輸送供人消耗用塑料管系統.析出物滲移量車測定.塑料管管件和析出物滲移量測定
  16. The nil alignment is dictated by the airport railway extended overrun tunnel to the west, the water channel of the hong kong convention and exhibition centre hkcec the foundations of which were specifically designed for this purpose and the existing fortress hill station to the east

    地鐵北港島線定線受到多項限制,包括西部必須機場鐵路掉頭隧伸延段,香港會議展覽中心會展其地基是特別為此而設計,而東部則必須現有炮臺山站。
  17. Plastics piping systems - thermoplastics piping systems for soil and waste discharge - test method for airtightness of joints

    塑料管系統.建築物內糞和污排放下用熱塑管系統.氣密性試驗方法
  18. Oligochitosan is not only water - soluble, non - toxic, biocompatible but also possesses versatile functional properties of chitin and its derivatives, such as polyelectrolite properties, the presence of reactive functional groups, gel - forming ability, high adsorption capacity, bacteriostatic, fungistatic and antitumour influence, and thus it has attracted more and more attention in the field of biology. previous investigations have shown that chitin and its derivatives have immunoenhancement activities

    殼寡糖是由3 10個n -乙酰氨基葡萄糖殘基或氨基葡萄糖殘基通過- 1 , 4 -糖苷鍵而成寡糖,它具有良好溶性、組織兼容性,在生物體內易降解,同時也具有抑菌、抗腫瘤、調血脂、調節免疫及活化腸雙歧桿菌等多種生理功能,因此已成為眾多領域研究熱點。
  19. By analyzing and processing the underwater sound signals received on the array, we can get the parameters of ocean environment. compared with traditional methods of direct point measurement, ocean acoustic tomography has obvious advantages : much simpler and more effective, and it can continuously monitor ocean environment in a large area for a long time

    海洋聲層析技術通過分析處理收基陣收到海洋通聲信號來反演海洋環境參數,這種方法方便、高效並且可以進行長時間大范圍續監測,與傳統測量方法相比有明顯優勢。
  20. The hydraulics of a new suction culvert from the harbour to the proposed lagoons reservoirs and passing around the cwb must be reviewed critically

    -必須嚴格檢討維港與擬建瀉湖蓄庫及經過中環灣仔繞周圍新吸暗渠壓。
分享友人