控制孔斜 的英文怎麼說

中文拼音 [kòngzhìkǒngxié]
控制孔斜 英文
control deviation
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. Drilling track is key factor which decide trenchless success or failure, but controlling drilling track stay around rectifyed phase at the present. guided the theory of force is the key affectting the drilling track, the paper discuss primary factors on contralling drilling track, and advance the formulary ahout reckoning deviation force and azimuth force, expect to achieve the aim that drilling track were controled real time and be anticipated, and have the initiative on drilling track contaolling

    巖層鉆進軌跡是決定非開挖成敗的關鍵因素,目前對鉆軌跡的僅僅停留在被打糾偏層面上,本文在力是影響鉆進軌跡本質因素理論指導下,對影響巖層鉆進軌跡的因素進行了理論探討,並針對造力和變方位力提出了計算模式,希望最終能實現鉆軌跡的實時監與調整,變被打糾偏為主動鉆進。
  3. Since 1972, j series hammers and various rock drll bits have been developed, among them two products have won the prices of the national science conferences and fourteen products obtained scientific and technical achievement prices from the metaillurgy, ministry. all the products have been widely used in metal, coal, and industrial mineral mines, hydroelectrie construction sites and sold to the foreign markets as well. cimr machinery plant is a department responsible for trial - producing, manufacturing and marketing the research achievements of cimr, it has started manufacturing hammers and rock drill bits since 1958

    在與tanhoanganh公司主要代理建築和工程機械總經理nguyen huy huyen的交流過程中,當我們談到cs165智能整體型一體化液壓潛鉆機可鉆鑿100m深的,能把偏在1 %以內,整個鑿巖過程在定位完成後自動完成,並配備了雙動力驅動系統時,他舉起大拇指,大呼「 powerful
  4. Controlling blasthole deflection through directional measurements

    的定向測量
分享友人