換算線路長度 的英文怎麼說

中文拼音 [huànsuànxiànzhǎng]
換算線路長度 英文
equivalent track kilometerage
  • : 動詞1. (給人東西同時從他那裡取得別的東西) exchange; barter; trade 2. (變換; 更換) change 3. (兌換) exchange; cash
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 換算 : [數學] matrixing; scaler; conversion; convert; translation換算表 conversion table; equivalent tab...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  • 長度 : length; longitude; size; extent; footage
  1. Then, taking into account the effect of the compression of the approach roadway and the differential slope of the bridge slab, the author analyzes the dynamic response of man - vehicle - road system when the vehicle approaches and leaves the bridge by means of laplace transform, the curve of man ' s acceleration versus time, the vertical force between the vehicle and road versus time, the man ' s maximum transient vibration value and the maximum force between the vehicle and road are got, and the program about the calculating progress above are edited. based on the analysis above, the influence on the maximum transient vibration value of some parameters about the vehicle and road such as the movement direction and speed and weight of the vehicle, the differential slope of the bridge slab and the length of the approach slab, are studied, and some conclusion are given

    分上橋和下橋兩種情況,考慮車耦合和橋面沉降坡差的影響,對車輛通過設和不設搭板的橋過渡段時「人?車?」系統的相互作用用拉普拉斯變法進行了動力響應分析,得到了人的加速面對車的垂直作用力隨時間的變化曲、人的加速最大瞬態振動值和面對車的最大作用力,分析了車輛的行進方向、速和載重,橋面沉降坡差和搭板等車和各參數對計結果的影響,並編制了相應的計程序。
分享友人