擬議線路 的英文怎麼說

中文拼音 [xiàn]
擬議線路 英文
tentative route
  • : 動詞1. (設計; 起草) draw up; draft 2. (打算; 想要) intend; plan 3. (模仿) imitate
  • : Ⅰ名詞(意見; 言論) opinion; view Ⅱ動詞(商議) discuss; exchange views on; talk over
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 擬議 : 1. (事先的考慮) proposal; recommendation2. (草擬) draw up; draft
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. The goal of the wae micro browser is to converge the http with wsp protocol stack, and supports many kinds of uri schemes, and adopts xml parser to parse the pages written in xhtml basic, wml, chtml, etc. the browser implements an efficient dom api. and it provides security support to protect the privacy of the end users and the information transmitted through the network. by the way, it adopts css, script and vm to enhance the presentation of the markup languages

    0瀏覽器的實現是以原有無通信協集成http協,支持多種url解析;使用xml語言技術解析如: xhtmlbasic 、 wml 、 chtml等多種標記語言編寫的頁面;設計實現高效的dom介面;並且集成網安全技術,使得個人信息可以安全的在網上安全的傳送;電子科技大學研究生學位論文採用css 、腳本語言和虛機技術增強標記語言的表現力。
  2. This paper studies the design documents of the avionic system detailedly, including the interface control document and detailed design requirements, and summarizes the data structures and the communication formats of the system, and designs the simulation database. this paper also studies some protocols such as gjb289a, arinc429 and udp etc, and then determines the methods of data processing. according to the theory of the software engneering, this paper completes the requirements analysis, the globle

    本文根據設備的具體設計要求,完成了模設備的硬體設計;詳細研究了航電系統的系統設計文件? ?介面控制文件和詳細設計要求,總結出了航電系統的數據結構和消息通訊格式,並在此基礎上設計了用來表達模對象的關系型模數據庫;研究了gjb289a 、 arinc429等總以及udp網,明確了各類數據的處理方法;按照軟體工程的開發理論,完成了模軟體的需求分析、概要設計和詳細設計,進而通過編程在labwindows / cvi環境下實現了一個界面友好、靈活通用的模平臺。
  3. This thesis elucidates and analyses the key techniques and rules of aolr in detail, and introduces its simulation modeling of the integrated system infrastructure and each function modules. through systematic simulation of aolr in the performance of packet delivery rate, average end - to - end delay, average route set - up delay, routing overhead, and etc, the key techniques and algorithms are testified and can provide reference for practical system design and application

    通過對基於蟻群優化的負載均衡由協系統的模,從數據分組成功遞交率、平均端到端時延、平均由建立時延、由開銷等性能的模數據和曲上,分別驗證了該系統中的幾項關鍵技術和演算法。
  4. Because of the unique issues in the networks, including mobility - induced disconnection, network partition, high out - of - order delivery ratios and channel errors, the congestion control and the error recovery in the network is challenging. in this environment, the interaction between tcp and mac layer protocols, the affection of route protocols on the performance of tcp and the particular congestion control and error recovery mechanism are first discussed. then a particular transport layer protocol scheme based on the non - feedback mechanism is presented, with emphasis on the analysis and simulation of the key parameter

    文中主要討論了兩種不同網結構中的無tcp協改進方案,其一在最後一跳為無的網環境中,針對基本tcp擁塞控制機制存在的缺陷,文中在現有解決方案的基礎上提出一綜合性的方案,其中包括無的高誤碼率和連接斷開問題的解決,並重點對方案中出現的交叉層問題進行分析和模;其二,考慮的是分散式網( adhoc ) ,在文中較為詳細的分析了tcp和mac層機制間的相互作用、由協中造成tcp性能降低的因素、 adhoc網中應採取的特殊擁塞控制和差錯恢復機制,在此基礎上提出了一種採用非反饋機制的解決方案,重點對方案中的關鍵參數進行分析和模,分析和模結果表明此機制可在很大程度上提高adhoc網中tcp的性能。
  5. According to the proposed plan, by 2010, the railway network will have a total length of 160 km comprising 4 district lines and 1 sub - region line

    根據該計劃,到了2010年,深圳將形成總長約160公里的軌道網,包括4條市區主幹和1條局域
  6. Other factors to be considered include population in proposed catchment areas which would normally not be less than 30 000 persons ; the nature of the terrain over which customers must travel ; physical features such as busy main roads and railway lines etc. ; the existence of any special social or postal need, and where the location is being considered as a focal point at which most of the day - to - day needs of the community will be provided

    其他需要考慮的因素包括服務范圍的人口應通常不少於30000人;使用郵政局人士所途經的地方的地形;周圍環境例如繁忙的主要道及鐵等;是否有特別的社會或郵務需要;及所在地點是否區內居民日常所需大部分設施的匯聚點。
  7. It ' s well known that the project documentations " storage and management have an very important effect on the development of all kinds of project, and as the information age is coming, network technology has been applied to this procedure gradually. this article mainly introduces the study and realization of a internet - based project documentation storage and management system which application programming frame is built with delphi6. 0 and sql server2000. based on the tcp / ip protocol, the system try to establish a c / s model with connection - oriented, dependable stream sockets and multithread technology to complete some especial data communications by networks, such as the files of project, directory of user, all self - defined commands or messages and their parameters, and so on

    本文所研究的《基於internet的項目文檔存儲管理系統》通過delphi6 . 0和visualc + + 6 . 0相結合的開發平臺,結合sqlserver2000 ,將client server模式的數據庫技術和windowssocket網通信技術進行集成,遵循tcp ip協,同樣採用c s結構運行於internet ,通過服務器將處于各個不同物理位置的客戶機連接起來,形成一個交流平臺;其中,引入了目前國際上流行的先進的安全管理控制方法? ?角色控制理論對用戶進行權限分配,使擁有相應角色的人具有相應權限;然後系統自動根據組織部門或用戶的設立在服務器端生成相應的網「虛文件櫃」 ,使擁有相應權限的人可以對相應文件櫃中的文檔進行整理;再通過多程技術和windows套接字通信機制在tcp ip協上實現了單個文件及目錄的傳輸。
  8. This thesis focuses on the ingress process module of ctu, which translates c - 5 dcp format to rainier 4gs3. the specification analysis, architecture and logic design, functional simulation testbench design, synthesis report and testing result are discussed in this thesis. the research work mainly includes : the specification analysis and design requirements of ctu logic ; the architecture and logical design of ingress process module, which includes receive control fsm, send control fsm and cell position adjustment logic ; the performance improvement of ingress process module to receive and transmit data cell at the full line speed

    本論文的主要研究工作包括:通信協轉換邏輯的功能分析和設計需求;通信協轉換邏輯上行方向的系統分析及體系結構設計,包括上行接收狀態機、發送狀態機、信元內位元組位置調整機制等的設計;通信協轉換邏輯上行方向的速設計,主要是上行接收的速設計,要使用流水設計技術;提出了高速實現roundrobin調度策略的實現方法,並設計實現了桶式移位器和優先級編碼電;應用bfm模模型設計了上行處理各模塊的模testbench ,完成了各級模塊的模塊模和系統集成模
  9. The model can simulate the transmission and receive of protocols data over the wireless broadcast of hf links, and verify the functions of some part protocols

    通過網模型可以模多個節點在短波開放的無廣播通道下協數據的發送和接收處理,對網功能進行驗證。
  10. Between mathematics inferential result and programmer simulation result, we can see that they are consistent. thus proof our network - level routing protocol is feasible and has the merit of consuming energy equably while saving energy when the wireless sensor network is working

    在理論推導結論和程序模結果中,我們可以看出,二者結論相符,從而驗證本文所改進的無傳感器網由協的可行性,驗證了在無傳感器網工作過程中,節點能夠在節省能量的同時相對均勻地消耗能量的優點。
  11. This dissertation aims on the simulation analysis of some typical wireless mobile ad hoc routing protocols, proposes and achieves a routing protocol which is suitable for the vehicle - carried broadcasting station

    本文旨在對部分典型無移動adhoc網由協進行模分析,並提出和實現了適合於車載電臺的由協? ? sdsr 。
  12. This paper introduces the routing scheme of the wireless router : include centralized mobile routing technology and dynamic network routing protocol. the simulation model of the network routing protocol is also described, and the model ' s validation is verified. this paper will give a good reference to the routing implementation of the wireless mobile self - organizing network system, and the building of the simulation model lays the foundation for the evaluating of the network performance

    根據上述思想,本文介紹了無移動自組織網中「無由器」的由設計方案,包括採用集中方式進行用戶尋徑的移動由技術和用於維護網拓撲的網由協的設計,對網由演算法進行了模模型的建立,並驗證其有效性。
  13. Traffic from the ldyb would use a new route, based on the previously proposed tuen mun port expressway and tuen mun southern bypass, running south around the tuen mun coast to so kwun wat east of tuen mun. traffic from the swc would use a new link running inland from the coast to north of tuen mun and then east of tuen mun also to so kwun wat

    經由伶仃洋大橋來港的車輛,可取道新的,沿過往的屯門港口快速公和屯門南繞道,向南經屯門海岸往屯門以東的掃管笏。至於經由深港西部通道來港的車輛,可使用新的道,由后海灣(深圳灣)海岸通往屯門的北部和東部而達掃管笏。
  14. According to the mtrcl s mr r j black, " if the proposed nil is to remain an achievable element of hong kong s future railway network, the physical alignment requires planning route protection from the encroachment of other infrastructure "

    -地鐵公司柏立恆先生表示: "的北港島如要配合本港未來的鐵發展,其定必須作周詳的規劃,避免進入其他基建設施的范圍。
  15. For the sake of the convenient network simulation, i select a same framework in my mac and routine protocols " simulation, that is ieee802. 11 standard built in soft tool opnet, by designing my network node model and directional antenna model, and the improvement of the current protocols, i realizes the evaluation of my special networks

    為了方便網性能模,使移動自組網的接入協由協能夠在同一個模板上實現,本文在模平臺opnet設計了ieee802 . 11框架下的移動自組網節點模型和定向天模型等,並通過對現有協的改進,實現了特定網性能的計算機模
  16. A linearization method is suggested for optimizing vehicle suspension parameters under the same track condition, which is obtained by huge of online testing and simulation for main line vehicles in this paper

    探討利用性化技術對地鐵車輛懸掛參數進行快速優化的方法,並在大量干機車車輛試驗與模基礎上,建以一種不平順條件作為這種方法的評價基礎。
  17. The government has earlier requested the two corporations to cover in their merger discussions how the hong kong section of the express rail link can be accommodated on the overall railway network in hong kong and to assess the impact on the business opportunities of the possible merged company

    政府較早前要求兩鐵在商討合併時,須包括區域快本港段如何配合香港整體鐵及對合併公司將來業務的影響。就此,兩鐵要求延長遞交合併研究報告期限。
  18. According to a proposed shenzhen railway network plan, shenzhen will be covered by 15 railway lines, comprising 3 region lines

    根據深圳計劃,深圳將由15條鐵覆蓋,包括3條區域、 8條局域及4條市區干
  19. The panel discussed paper on the proposed way forward for the route 7 project

    事務委員會討論有關七號干工程計劃的未來向的文件。
  20. Franchised bus operators are required to submit annually a route development programme ( " rdp " ) which sets out proposed changes to their bus network for the next few years

    專利巴士公司每年須提交發展計劃,列出在未來數年其巴士網改動。
分享友人