攔水工程 的英文怎麼說

中文拼音 [lánshuǐgōngchéng]
攔水工程 英文
retaining works
  • : 動詞(不讓通過; 阻擋) bar; block; hinder; obstruct; hold back
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. Through the analyses of characteristics of gully thalweg and soil erosion in upland and gully land, sediment sources in small watershed, sediment yield relationship between upland and gully and ecological functions of vegetation corridor, it is considered that vegetation corridor combined with land preparation measures may block runoff and sediment from upland and reduce the amount of soil erosion in a watershed by 54. 5 % ~ 77. 0 %

    摘要在分析黃土高原地區的溝沿線、溝沿線上下溝間地和溝谷地土壤侵蝕特徵、小流域泥沙來源、坡溝侵蝕產沙關系的基礎上,結合廊道的生態功能和以往的研究結果,認為在溝沿線的上部建立草灌與整地措施相結合的植物廊道,來蓄阻截溝間地的來來沙,可使流域的土壤侵蝕量減少54 . 5 % ~ 77 . 0 % 。
  2. The dam of mania hydroelectric project is a soil - rock dam with spreading gradation soil of core wall. the height of the dam apices is 4261. 3m and the maximal height is 76

    滿拉利樞紐河壩為寬級配礫質土心墻土石壩,壩頂高4261 . 3m ,最大壩高76 . 3m 。
  3. In recent years, many barrages have been founded in dagu river, which greatly change the conditions of the exploitation and supply of groundwater. on the basis of calibration of mathematical model of hydrogeology, the effect of diversified factors on the variation of groundwater is analyzed using visual modflow software, the recharge capacity of rubber dam to the groundwater storage is studied and the allowable withdrawl of groundwater with the influence of manpower is calculated again

    近年來大沽河幹流及支流已增加多處河壩致使地下采補條件發生了較大變化,本文利用visualmodflow軟體分析了各種影響因素對地下動態的影響,研究了橡膠壩對地下庫的補給能力並重新核算了人影響條件下大沽河地下庫的允許開采量。
  4. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座河閘壩和八級抽站。
  5. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子電站河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大壩體的靜動力安全穩定性及溫控方案提供依據。
  6. Proceeding with the analysis of water resource peculiarity of jilin province, the authors bring forward that effective gathering and using of rainwater can supplement the gross amount of rainwater in valley, probe into rainwater resources use in jilin province : first is to make rainwater resources use plan in valley program, secondly is to construct gully dam system according to water and soil conservation project, to strengthen sloping field collection rain ' s project and forest - grass construction, to increase storage space, thirdly is to fully utilize field project and water conservancy project to gather rain water, intercept rainfall on the spot so as to restore water environment

    摘要從吉林省資源特點分析入手,提出了雨資源的有效集蓄利用是補充流域資源總量不足的重要因素,探討了在吉林省雨資源主要利用途徑是首先在小流域規劃中作好雨資源利用規劃;其次是建設以土保持治溝骨幹為主的溝道壩系,強化坡面集雨和林草植被建設,增大貯空間;第三是充分利用田間集雨蓄,使降雨就地就近被蓄,最終使環境得以修復。
  7. This paper summarize the estuary sediment management methods also, analyze and the following aspects and give evaluations : estuary dredging and lead the flow, lead water to scour the river channel, build the xihekou reservoir, estuary gate deposition management, dike reinforced etc

    本文還對河口泥沙的處理途徑和措施進行了概括總結,對河口疏浚與導流、引海沖刷河道、建設西河口利樞紐、門沙治理、人有計劃改道和出漢、加高堤防和加固防護和挖河固堤等進行了分析評價。
  8. The plans will be carried out in different stages, which involves 11 key projects, including : taipu river, wangyu river, dyke around the taihu lake, south - drainage in hangjiahu plain, water drainage and diversion in huxi, hongqitong, flood control in east - west tiaoxi, water drainage and diversion in wuchengxi, enlarging lanlugang, dredging liuhe and xietang, north drainage in hangjiahu, and flood prevention in the upper stream of huangpu river

    該方案以流域防洪除澇為主,統籌兼顧供,航運和環境保護等方面的利益,計劃分期實施包括太浦河、望虞河、環太湖大堤、杭嘉湖南排、湖西引排、紅旗塘、東西苕溪防洪、武澄錫引排、擴大路港疏浚泖河及斜塘、杭嘉湖北排通道及黃浦江上游防洪等十一項骨幹
  9. The computed results show that the flow field in the estuary changes significantly due to the project

    數值模擬結果表明長江口門沙深航道對長江口域的流場有明顯的影響。
  10. After the coke being puted into the coke - quenching device, the lid of the device should be shut at once. while the suction pump, refrigeration compressor, high pressured water circuling pump are started, the subpressure will be produced by the burning coke. then, in the vacuum, the coke will be extinguished in a flash. the burning of the coke instantly, still, produces a large quantity of heat which can be taken away by circulating water in refriger and the interlayer, after that, the temperature will fall to 60oc, even lower. in this condition, the coke will be pushed out to be stored, thus, the coke won ' t rekindle

    當焦炭推上焦車進入熄焦器后,立即關閉罐蓋,同時啟動真空泵、冷凍機、高壓循環泵,這時,燃燒著的焦炭就會因真空泵把熄焦器內抽成負壓,由於缺氧,使焦炭熄滅,雖然煤炭在瞬間被熄滅,但由於焦炭生成過中所產生的大量的熱量還存在,這時,冷凍機和夾層中的循環作就會把焦炭中的熱量帶走,使之在短時間內將溫度降到60以下,在這種狀態下把焦炭從熄焦器內推出入庫,焦炭就不會復燃。
  11. Based on the depth - integrated 2 - dimensional mathematical model, the numerical simulation of the effect of a deep - water navigation channel project on the hydrodynamic flows is presented in this paper

    本文基於沿深積分的平面二維非定常流動數學模型對長江口門沙航道對長江口域流場的影響作了細致的數值模擬。
  12. According to the test results from the yellow river water - sediment regulation, especially the first test, e paper analyzes the results of the scouring or deposition in the lower river and the area of the river - mouth bar, the adjustment of the channel morphology, the effect of channel regulation and the changes of flowing capacity of the lower reaches

    根據這兩次黃河調調沙試驗成果,特別是首次調調沙試驗成果,對下遊河道沖淤效果、河口門沙區泥沙沖淤量及其分佈、河勢調整、整治作用及河道過流能力變化進行了分析。
  13. Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river

    在現場查勘的基礎上,通過對丹江口庫和小浪底沙初期下遊河道演變、排洪能力變化特點的對比,分析了黃河下游防洪面臨的新形勢:小浪底沙初期,下遊河道發生沖刷,但艾山以下窄河段沖淤變化不大,近年來形成的淤積萎縮的狀況難以很快改觀,游蕩性河段調整劇烈,出險機遇增大,河道位流量關系中流量以下部分同流量位明顯降低,中流量以上部分位降低幅度可能會明顯偏小,防洪形勢仍不容樂觀。
  14. When xiaolangdi project completed and put into orperation, the inflow of water and sediment condition will be changed because of the regulation of the reservoir. especially the initial 14 years, the reservoir will hold up sediment and release clear water, which may affect the river sections in henan province, especially the wandering sections. it will result in changes of flow state and endangering the water works, because the longitudinal addend by scouring and lateral slope failure

    小浪底庫建成運用后,通過庫的調調沙,改變了黃河下游的來來沙條件,尤其是運用的前14年處于沙期,下泄清,對河南河道的影響最為劇烈,對游蕩性河段的河勢變化將產生很大影響,河道縱向沖刷下切,橫向灘岸坍塌,出險將大量增加。
分享友人