支架安設裝置 的英文怎麼說

中文拼音 [zhījiàānshèzhuāngzhì]
支架安設裝置 英文
support setting unit
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 支架 : support; stand; trestle; holder; rack; tressel; spur; sting; husk (hoose); buck; undercarriage
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. The design of hoisting cableway in wudang mountain xuan regnal palace according to the characteristic and requirements of cableway design in the view and in line with the principle of advanced technology, reasonable economy, safety and appliance, includes the general arrangement of cableways, calculation of skyline and wookline, checking computation of the support and the anchorage, productivity calculation

    摘要根據景區空索道計的特點及要求,本著技術先進、經濟合理、全適用的原則,對武當山南巖宮玄帝殿吊索道進行計,包括索道總體布、承載索與工作索計、與錨碇的驗算,並進行生產率的計算。
  2. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索點的滑移剛度;介紹了懸索橋成橋計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股線形計算、索夾計算和加勁梁吊線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  3. Check pipe - hangers, supports, guides, expansion joints, and other pipe specialties for the removal of all shipping and erection stops and for the correctness of cold settings for the design service

    檢查管道吊、導向、膨脹節及其它管道特殊件,以除去所有的運輸與附件,確保計服務冷的正確性。
  4. The budget should include artist s fee, material costs, support, fabrication, production and installation, insurance, transportation, provision of documentation, operation and maintenance manual of the sculpture, clean up, light fittings, connection to signal cable outlet, a training session provided for the organiser on the maintenance procedures of the sculpture within 2 months after the installation, maintenance of sculpture for 12 months after the installation and any other expenses incidental to the implementation of the proposed sculpture

    此費用須包括創作及計費物料費製作保險運輸提供有關的記錄文件和雕塑的操作及維修手冊清潔照明系統訊號線路連接雕塑后十二個月內的維修在雕塑后兩個月內為主辦單位提供一次有關雕塑維修程序的講解等,及所有可能涉及雕塑的費用。
  5. The budget for the commission must include all costs including artist s fee, material costs, support and fabrication, production and installation, stand finish, lighting system, insurance, transportation, provision of documentation, operation and maintenance manual of the sculpture, clean up, light fittings, connection to signal cable outlet, a training session provided for the organiser on the maintenance procedures of the sculpture within 2 months after the installation, maintenance of the sculpture for 12 months after the installation and any other expenses related with the sculpture

    委約費用預算包括計費、物料成本、、製作及修飾、燈光系統、保險、運送、記錄文件、雕塑的操作及維修手冊、清潔、照明系統、訊號線路連接、在雕塑后兩個月內為主辦單位提供一次有關雕塑維修程序的講解、雕塑后十二個月內的維修及所有其他與雕塑品有關的出。
  6. Energy - dissipation technology is a much more rational, effective, safe, economic earthquake resistant method, which develops quickly in recent years, and it is more suitable for high rise steel structure. a energy - dissipation braced frame is designed with viscous damper as energy - dissipation device. test on the frame under cyclic reversed lateral load of various frequency and displacement is carried out to check its energy - dissipation capacity and structural measures

    消能減震技術是近年來迅速發展起來的一種更加合理、有效、全、經濟的結構抗震方法,中高層鋼結構建築是採用消能減震技術理想的結構體系;為此,本文計了一榀耗能撐框,採用粘滯阻尼器作為消能,通過不同頻率、不同位移下的水平低周反復荷載試驗,驗證了消能撐框優異的耗能能力,證明相關構造措施是行之有效的。
分享友人