支渠過水能力 的英文怎麼說

中文拼音 [zhīguòshuǐnéng]
支渠過水能力 英文
lateral capacity
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 能名詞(姓氏) a surname
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 過水 : excess of water
  • 能力 : ability; capacity; capability
  1. Through analysis and study, it is believed important and feasible that the implemented projects, the importing feng jia - shan reservoir into yang mao - wan reservoir and the water supply from shi tou river to xi ' an city ; form the synthetic analysis of the main factors - quantity, time, apace and user " character, it can be conferred that it is not necessary for the four projects in the western areas to join together at present ; adding gate at the 2 head of lin jiacun trench can only help to relax the problem of lack of water in bao jixia irrigation area, to solve the problem of short of water in the irrigation area needs to take project measures at the trunk and branches of wei he river from lin jia village to the upper stream ; the mode of supplying water of the four projects in the western areas are all by gravity, they can only be supplied one way and ca n ' t be supplied each other

    分析研究認為:已實施的引馮濟羊工程和石頭河西安供工程,是十分必要的和可行的;從資源配置的主要要素? ?數量、時間、空間和用戶性質的綜合分析研究來看,西部四大工程目前尚無整體聯網的必要;林家村首加閘對解決寶雞峽塬上灌區缺起到緩解作用,從根本上解決塬上灌區的缺問題,還必須從林家村以上渭河干流上採取進一步的工程措施;西部四大工程均為重,只單補,而不互補。
分享友人