收縮期末長度 的英文怎麼說
中文拼音 [shōusuōqīmòzhǎngdù]
收縮期末長度
英文
end-systoliclength- 收 : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
- 縮 : 縮構詞成分。
- 期 : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
- 末 : Ⅰ名詞1 (東西的梢;盡頭) tip; terminal; end 2 (非根本、非重要的事物) nonessentials; minor detai...
- 長 : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
- 度 : 度動詞[書面語] (推測; 估計) surmise; estimate
- 收縮 : 1 (由大變小; 由長變短) contract; shrink 2 (緊縮) concentrate one s forces; draw back 3 take u...
- 期末 : end of term; terminal
- 長度 : length; longitude; size; extent; footage
-
( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge. ( 3 ) calculate the altitude of downriver cofferdam, and make it meet the require of energy dissipation and erosion prevention. ( 4 ) calculate some average velocity of flow through some sections, including contracted section in stilling basins behind upriver cofferdam, if the hydraulic jump happen in lower reaches of the river. the program will calculate the average velocity of flow of contracted section and the length of the apron
主要設計內容包括:計算上游圍堰后消力池的尺寸;驗證泄洪初期壩面高程是否能夠滿足消能防沖需要;計算下游圍堰堰頂高程,使其滿足泄洪期圍堰和壩體過流的消能防沖和工程進度的需要;計算部分斷面平均流速,包括:上游圍堰后消力池中收縮斷面的斷面平均流速;壩首和壩末的斷面平均流速;當下遊河道發生水躍時,計算下遊河道的收縮斷面平均流速及需要鋪設護坦的長度。End systolic tension - length relation
收縮末期張力-長度關系The curvilinearity of the end systolic tension - length relation of isolated rat papillary muscles
大鼠離體乳頭肌收縮末期張力-長度關系的曲線性
分享友人