放空坑 的英文怎麼說

中文拼音 [fàngkōngkēng]
放空坑 英文
sumpit
  • : releaseset freelet go
  • : 空Ⅰ形容詞(不包含什麼; 裏面沒有東西或沒有內容; 不切實際的) empty; hollow; void Ⅱ名詞1 (天空) s...
  • 放空 : evacuation; unloading; emptying; voidance; sailing in ballast; eightload sailing
  1. The older group engaged in plaster molding, and their finished works in the shape of objects like a pie, a spaceship, a snake pit, and crabs were displayed on paper plates

    年長組做的是石膏模型,塑造出各種形狀的東西好像餡餅太船蛇螃蟹,然後在紙盆上展覽。
  2. Combined witch the technical parameters in construction, this article mainly discusses the excavation method of deep end well of subway station, the " time - space effect " principle and the support system in case of complicated large span foundation

    根據「時效應」原理制定的坡、開挖單元及支撐架設的技術參數,對安全快速地完成大跨度端頭井深基的開挖起到了決定性的作用。
  3. It was natural site, architectural tradition of hakka culture and microclimate which determined the planning idea of hengkeng, and made hengkeng so different from normal traditional villages in pearl river delta, canton based on the fieldwork, through the analysis of the ancestral halls as the key social space in the village, authors discuss the transformation process of the layout of the village from centralized pattern to comb - shaped pattern, and also make some comparisons between 4 ancestral halls in the village

    通過詳細的實地考察和對家譜、村史的閱讀,以及對作為村落關鍵性社會間的祠堂的分析,闡述了在嘉靖十九年開庶民建家廟之後,橫舊村從中心式布局轉向變形的梳式布局的過程,並對村落中四座主要的祠堂建築進行了比較研究。
  4. Shandong longkou double dragon chemical co, . ltd limited is located in the beautiful and richly city - longkou, which is alongside bohai sea and is one of the earliest coastal city openned, laishan airport about 100km to it, there are weiwu highway and delong railway on the east, and longkou international container harbor on the west, on the north side situated thermal power plant which is the biggest in jiaodong peninsula and seashore coal mine which is the biggest in china. in brief, it is convenient of traffic and communication, sufficient of energy resources, beautiful scenery and pleasant climate

    山東口雙化工有限公司位於渤海之濱美麗富饒的國家第一批對外開港口城市-口市。公司東臨威烏公路和德鐵路,距煙臺萊山機場100公里西靠口港國際集裝箱碼頭北有膠東最大的口口發電廠和全國最大的海濱煤礦。這里水陸交通便利,能源供應充足,山川景色秀麗,四季氣候宜人。
  5. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點在大力發展工程樁的實驗室承載力監測方法與設備、如何使土方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與程序,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力理論、基間和時間效應影響理論來分析逆作法施工過程中基邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室土體的挖掘的方式和順序,指出憑主觀臆斷與經驗來施工是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法施工期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下混凝土墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  6. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管道鋪設、機電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝焊接、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的裝卸、電線張緊、道支撐木的拆除、林區木材的集等等,對于局部間受到限制的狹窄工作場所、高作業、野外作業、道、深井作業和無機電供能場所的各種牽引、提升作業、選用本系列產品尤為適宜。
  7. The development of underground space has become a new tendency with the advancing of the reforming and opening in our country. most of the development has relations to open excavation

    隨著我國改革開的進一步發展,城市地下間的開發已成為一個新的熱點,這些地下間開發有很多是與基明挖相聯系的。
  8. Since these substances exist in a form that cannot be released in open air unless being exposed to an environment over 700 degree celsius, the contaminated sediments are dredged and disposed of at east sha chau contaminated mud pit in the usual manner

    由於這些物質以固定形態存在,除非暴露于攝氏700度以上的環境,否則不會被釋氣中,因此我們以慣常方式挖掘受污染的泥沙,並把這些泥沙棄置在東沙洲污泥卸置內。
分享友人