整合巖基 的英文怎麼說

中文拼音 [zhěngyán]
整合巖基 英文
concordant batholith
  • : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • 整合 : commensuration
  1. 2. tazhong ancient uplift originated from normal fault in paleozoic, hydrocarbon formed in ordovician period, structure reverse made tazhong uplift form from the middle ordovician period to the late ordovician period, and it provided geologic background for the deposit of silurian - devonian stratum. tazhong uplift formed at the end devonian, ancient reservoir was destroyed and asphaltum sandstone formed, structure deformation more destroyed ancient reservoir in early permian, after then the major of structure deformation is regulation

    塔中隆起源於早古生代拉張背景下的正斷層,寒武-奧陶紀為其烴源形成的重要時期;早奧陶世末-晚奧陶世末的構造反轉是塔中隆起的主要形成期,同時也為志留系形成地層及復圈閉提供了古地理背景;志留?泥盆紀塔里木盆地南北緣均轉為活動大陸邊緣,形成了大量的斷裂和不;泥盆紀末塔中鼻狀隆起本定型,古油藏遭受破壞,形成了瀝青砂;早二疊世晚期的構造變形使古油藏遭受進一步的破壞;二疊紀后構造變動主要以調節為主。
  2. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的地質災害,它的治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和地質環境干擾小、工期短、抗滑能力強的滑坡治方法.風動潛孔錘鉆進是一種具有許多優點的鉆進方法,它的許多特點,如成孔質量高、應用范圍廣、無液體循環介質、鉆進規程參數小、可實現大直徑鉆孔等都適於抗滑樁施工.文章在介紹風動潛孔錘鉆進特點的礎上,根據抗滑樁施工要求,分析了風動潛孔錘用於抗滑樁施工的可行性,並舉出了其應用實例
  3. The ultrabasic bodies are generally concordant intrusions, with related feeder dikes.

    一般為具有補給墻的侵入體。
  4. Many ultrabasic bodies in the orogenic association occur along strike faults, which gives a simulated concordant relationship.

    與造山運動共生的許多超體沿著走向斷層出露,表現出假的關系。
  5. An angular unconformable contact was for the first time found between the middle jurassic bathonian stage and its underlying pre - ordovician metamorphosed basement in the chawola district, in nyainrong county

    摘要在聶榮縣查吾拉區一帶首次發現中侏羅統巴通階與下伏前奧陶系底變質系之間呈角度不接觸。
  6. Guided by the theory of sequence stratigraphy and petroleum system using cores, lithologic log or well - logging, biostratigraphic and seismic data, adopting seismic inversion constrained to well data, digital analysis technology, basin modeling, test method and so on, and adopting an integrated study technology, aiming at lower exploration in chagan depression, this work put forward a new research thoughtfulness, technic flow and method system that is an integrated study by " looked upon sequence stratigraphy as a base, looked upon petroleum system as a integer, combing with each other closely " and tie in qualitative analysis and quantitative analysis and applied synthetically new theory, new technology and new method

    以層序地層理論和含油氣系統思想為指導,利用心、鉆/測井、古生物以及地震資料,採用井約束下的地震資料反演技術、計算機技術、盆地模擬技術和各種分析實驗手段等綜分析方法,針對查干凹陷勘探程度低的特點,提出了斷陷盆地「以層序地層分析為礎、含油氣系統為體(系統)和二者緊密結」以及定性與定量相結,綜應用新理論、新技術和新方法的研究思路、技術路線和方法體系。
  7. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結溪洛渡水電工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量礎地質資料的理與分析礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為本計算工具,從個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍質量、初始地應力場、施工開挖順序對大型地下洞室群圍穩定性的影響。
  8. Finally, niutoushan double - curvature arch dam was modeled and 3 - d fem simulation analysis was performed, so as to find out the integral safety factor and the stress and displacement patterns of dam and its foundation under different load combination

    最後,對牛頭山水電站雙曲拱壩進行了有限元建模和三維非線性有限元模擬分析,計算分析了各種情況下壩體和的應力位移規律,對大壩的體安全度進行了綜評判。
  9. It is directed by the 1atest theory of terrain stickin plate tectonic, and based o n petrographical series and stratum layers. from the aspects of structural analysis, stratigraphy, petrology, sedimentology, structure geology, remote sensing geology, geophysics as well as tectonics, the author put the ordos basin into a bigger and deeper studying field while using the combination of sedimentation and structure analyses, the data of outcrops around the basin and the deep drilling coring data in the middle of this basin, geochemistry analysis, seismic methods and non - seismic methods, etc. this paper discussed the relationship between the crystalline basement and the suprastructure in and surrounding the ordos basin, and also the influences of deep geology on the basin platform cover, and some new point of view and better understanding have been brought forward on the basement growth of ordos basin and it ' s platform cover

    論文以板塊構造研究的最新地體拼貼理論為指導,以系、地層為礎,將沉積與構造分析相結,並以地層學、石學、沉積學、構造地質學、遙感地質學、地球物理學、大地構造學等多學科入手,在充分理現有資料及前人研究的成果礎上,利用盆地周緣野外露頭以及盆地中部分鉆井深部取芯資料、地球化學分析資料、地震、非地震等資料將鄂爾多斯盆地置於一個更大的尺度,更深的范疇,討論了鄂爾多斯盆地及其周緣地區結晶底與淺層構造之間的關系,探討了深部地質對盆地蓋層的影響,以不與前人雷同的視角對鄂爾多斯盆地底發育及其蓋層中存在的問題提出了新的觀點和認識。
  10. The calculation formula of seepage tensor to the model of non - linear seepage with the area of karst conduit in the whole coordinate axis is deduced. on the basis of galerkin finite element method, the equation of finite element with the non - linear seepage of groundwater is educed, on the foundation of this information, the program of karcon. for is compiled

    推導出體坐標系下溶管道區非線性滲流模型滲透張量計算公式,於galerkin有限元法,導出了地下水非線性滲流的有限元方程,在此礎上編制了計算程序karcon . for ,將該程序用於典型模型的計算分析,結果表明該方法是理的。
  11. This thesis is relied on the subject " analysis of prospecting foreground and evaluation of favourable play of oil and gas in santanghu basin " and based on areal geology, gravity, magnetism, electricity, seism, rock - core etc, and it ' s guiding ideology is the plate tectonic theory, the continental dynamics. the new achievements and the new understandings of the international exploitation of oil and gas fields. in light of the elementary analytic principles " integrated, dynamic, comprehensive ", it studies the structural features and the formation and evolution of santanghu basin on the the basis of obtaining abundant first - hand data

    本文以「三塘湖盆地油氣勘探前景分析與有利區帶評價」項目為依託,以板塊構造理論、大陸動力學研究以及國際油氣田開發的新成果和新認識為指導思想,以區域地質、重磁電、地震、芯等等資料為礎,獲取扎實的第一手資料, 「體、動態、綜」地研究三塘湖盆地構造特徵及其形成演化。
  12. In the sog connty - zogang stratigraphic area, including the chawola district, only the bathonian stage in the middle jurassic unconformably overlaps on the " shallow basement " metamorphic series

    在包括查吾拉區在內的索縣左貢地層分區中,中侏羅統僅有巴通階超覆不於「淺底」變質系之上。
  13. The study of collapse of dangerous rock is a focus among researches of various geological hazards. based on current domestic and foreign researches on dangerous rock and applying the hongyadong dangerous rock project in chongqing as the example, the following contents are researched : at beginning, the details of engineering geology on the area are introduced, including the conditions of engineering geology and hydrogeology

    本文以目前國內外對危研究的現狀為礎,以三峽庫區地質災害項目? ?重慶洪崖洞危治工程為依託,進行危邊坡的破壞和加固機理的研究,主要內容如下:論文首先介紹了洪崖洞地區的場地工程地質條件,包括工程地質和水文地質的詳細情況。
  14. The topic of this paper is structure, firstly analyse the earth structure setting of tarim basin and tectonic evolution of tazhong area in silurian - devonian, and give silurian - devonian stratum control and effect, then study the relationship of the development of tazhong uplift, fracture unconformity igneous rock and and oil - gas, at last, on the base of the analyse about history of reservoirs formation, forecast reservoirs pattern, point out favored oil and gas bearing structure and the target. and obtain some important conclusion. 1

    本文以構造研究為主題,詳細的分析了塔里木盆地誌留泥盆系沉積時的大地構造背景和塔中地區的構造發展,以及它們對研究區志留?泥盆系地層的控制和影響,同時在研究了塔中隆起的形成發展演化、斷裂、不以及火成等構造特徵的礎上,分析了它們與油氣的關系,結志留泥盆系突破井的成藏史分析,預測了成藏模式,最後指出有利含油氣構造,並進行了簡單的目標預測。
  15. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從體的應力?變形的特性入手,並結工程區域的地形地貌特徵,對體初始地應力場的形成做出解釋,結錦屏水電站初始地應力的現狀提出了將地應力場進行分帶;然後建立個工程區的實體模型,在地質分析的礎上,以工程區右半部分為代表,參照實測點的初始地應力值,採用了神經網路與有限元相結的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過計算比較分析了初始地應力場對處于不同應力帶內的隧洞圍穩定性的影響,在此礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  16. The standard drawing of composite tunnel lining for single - track railway tunnel is improved, and the concept of full - circular monolithic lining and some kinds of primary scheme have been given. the design schemes are proposed after studying the stability of surrounding rock, comparing technique economy and analyzing all kinds of primary schemes

    本文針對單線電化鐵路隧道復式襯砌標準圖存在的問題進行了結構優化設計研究,提出了全環體模築襯砌的概念和若干種方案,並對其進行圍穩定性分析、技術經濟比較和綜受力分析,在此礎上提出了建議採用的設計方案。
  17. Based on the analysis, we gave an example to study the dynamic contact with friction of the intermittent joint, and got some essential rules : the friction coefficient could n ' t influence the distributing of dynamic stress on the contact surface, and the roading rates affected evidently on the dynamic characteristic on the contact surface. in the last part, this paper made respectively use of the time - history method and the response spectrum method to analyze the dynamic response of the rock slope on baise hydraulic power plant, and got the coincident resultant. simultaneously, the contact theory was applied to study the stability of the intermittent joints

    於上述的接觸理論和接觸分析結果,本文在最後一部分中分別利用動力時程法和反應譜法對百色水電站尾水渠的質邊坡進行動力響應分析,兩者計算方法得出比較一致的結果,同時採用動力摩擦接觸理論重點分析了斷層對于邊坡的穩定影響,認為斷層的存在會使得坡的穩定性降低,在地震等動力荷載的作用下對于斷層將發生張開、閉和錯動現象,尤其是動力荷載和其他荷載如滲流力等的耦作用將會對斷層產生極為不利的後果,進而影響坡的體動力穩定,應該要引起足夠的重視。
  18. The results show that npt ii had already integrated into the genome of sinningia speciosa, and the transformation efficiencies of tmek2 and tmek2mut were 1. 7 % and 0. 7 %, respectively

    用pcr法對轉化再生植株進行了檢測,證實npt已經到大桐的因組dna中。野生型、突變型mapkk因的轉化效率分別為1 . 7和0 . 7 。
  19. Comprehensive analyses lead to the following conclusions : the rock condition is lead for excavating chambers in the right bank underground powerhouses of xiangjiaba hydro - power station ; surrounding rock is generally stable and unitary stability can be guaranteed after anchorage and gunited support

    分析后認為:向家壩水電站右岸地下廠房洞室群的成洞條件較好,圍本是穩定的,經過錨噴支護后體穩定是有保證的。
  20. On the basis of comprehensive analyses on hydrocarbon accumulation conditions in the four representative foreland basins, kuqa basin, southern junggar basin, western sichuan basin and northern margin of qaidam basin, some conclusions are made as follows ; the foreland basins in central and western regions of china are characterized by multi - set source rocks dominated by coal measure ; heterogeneous reservoirs ; multiple and sealing cap nick ; anticline traps ; unblocked transport system composed of fault, unconformity and highly permeable sand body ; anti poor conservative conditions. etc

    在綜分析和對比庫車、準南、柴北緣和川西等具有代表性的前陸盆地的油氣成藏條件的礎上指出,中西部前陸盆地具有以煤系為主的多套源,發育非均質儲集層,多套多封閉性的蓋層,以背料為主要圈閉;斷裂、不和高滲透砂體組成良好輸導體系,保存條件較差等特點。
分享友人