敷管機 的英文怎麼說

中文拼音 [guǎn]
敷管機 英文
pipe layer
  • : Ⅰ動詞1. (搽上; 塗上) apply 2. (鋪開; 擺開) spread; lay out 3. (夠; 足) be sufficient for Ⅱ名詞(姓氏) a surname
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : machineengine
  1. Nothing is said about the employer who grows old before his time in a vain attempt to get frowsy never - do - wells to do intelligent work ; and his long, patient string after “ help ” that does nothing but loaf when his back is turned

    但從沒有人提到,那些老闆直到年老,都無法使那些不求上進的懶蟲勤奮起來,也沒有人提到,那些老闆長久而耐心地努力感動那些他一轉身就投取巧、衍了事的員工,盡結果常常是徒勞的。
  2. These products are wide used for electronic computer - room, telecommunication room, tv transmitting sration, military commanding station, all kinds of laboratory, office and the places where the pipe and wire are centered and the requirement of antistatic is needed

    該產品廣泛應用於電子計算房,通訊房,電視發射臺,軍事指揮站,各類實驗室,辦公室,及一些設比較集中與防靜電要求場所
  3. The first part of this thesis talks about the history of the development of policy of vocational and technical education in macao and the situation of vocational and technical education before and after the introduction of the related regulations. the second part is a research on the implementation of policy development of the vocational and technical education. this part is an analysis and a study on the following areas : 1 ) organization : it states the specifically appointed management bodies and persons in charge of the vocational and technical education ; organizational hierarchy of the vocational and technical educational institutes ; and also introduces the general situation of the public and private vocational and technical educational institutes ; 2 ) management : this part talks about the policy of administrative management, regulations, compliments and penalties ; 3 ) and 4 ) students and teachers : these two parts constitute a comparison of the vocational and technical education and the current regular education by means of comparing the data of the teachers, students and the learning situations of the students ; 5 ) curriculum : this part is a research of the situation of the vocational and technical education curriculum after the introduction of having vocational and technical subjects in regular education

    第二部分是探討澳門職業技術教育發展政策的實施,並按以下各范疇作出分析與研究(一)組織方面,展述職業技術教育由哪些專門構與專人負責;職業技術教育構的組織架構,也分別介紹公立及私立職業技術教育構的具體情況; (二)理方面,涉及各職業技術教育構的具體行政理措施、規章、婆勵、撒穎等; (三)輿(四)肇生輿教鉚方面,就瞞案技衍教育在教頗、警生及其肇曾的情況,通遇嫁反映其現今瞰巢技衍教育輿正規教育的比較; (五)裸程方面,探豺自暇巢技附教育法令遁布俊,澳的膝棠技頒教育毅橫髓毅駿等裸程的情況,輿及在一般普通教育殿橫髓殷一些瞞案技衍教育科目的情沉。
  4. Testing earth - moving machinery - method for the evaluation of lift capacity of pipelayers and wheel tractors or loaders equipped with side boom

    運土械試驗.第6部分:側面帶起重吊桿的和輪式拖拉或裝載的升降能力評定方法
  5. The company has been undertaking projects such as power delivery and distribution system for alternating currents of 110 kv and below, smart architecture system, channel and optical cable laying project for communication system, computer network system, and cable television network,

    公司一直從事110kv及以下送變電和配電系統工程、建築智能化系統工程及通訊系統的道和光纜設工程、計算網路系統工程、有線電視網路、電安裝與城市道路照明等工程。
  6. Earth - moving machinery - safety - requirements for pipelayers

    土方械.安全性.設設備的要求
  7. The stem is generally cylindrical and consists of regularly arranged conducting ( vascular ), strengthening, and packing cells, the whole being surrounded by a protective epidermis

    莖通常為圓柱形,由規則排列的輸導系統(維) 、械支持系統、和基本組織細胞組成,外方以保護性的表皮。
  8. Code of practice for safe use of cranes - side boom pipelayers

    起重安全操作實施規程.起重側臂
  9. At the environmental temperature of - 30 ~ + 60, both the mechanical and electrical properties of the cable remain unchanged

    主要用於設,也可用於架空,在- 30 + 60的環境溫度條件下,電纜的械和電氣性能均保持不變。
  10. For laying indoors 、 in tunnels or cable trench, unable to bear external mechanical forces. singlecore cable in magnetic duct is not permissible

    室內、隧道及電纜溝等場所,不能承受械外力。單芯電纜不允許設在磁性道中。
  11. For laying indoors 、 in tunnel or cable trench, unable to bear external mechanical forces. single - core cable in magnetic duct is not permissible

    室內、隧道及電纜溝等場所,不能承受械外力。單芯電纜不允許設在磁性道中。
  12. For laying in 、 in tunnels and in cable trench, unable to bear external mechanical forces. single core cable in magnetic duct is not permissible

    室內、隧道及電纜溝等不能承受械外力的場所。單芯電纜不允許設在磁性道中。
  13. Process of cement mortar lining with coating machine on the inside surface of steel pipes

    鋼質道水泥砂漿村裡塗工藝
  14. For laying indoors, in trenchesin ducts and in ground, able tobear heavier pulling force, andfor fixed installation

    設在室內、電纜溝、道、直埋等能承受較大械外力等固定場合。
  15. For laying indoors, in trenchesin ducts and in ground, able tobear heavier pulling force, and for fixed installation

    設在室內、電纜溝、道、直埋等能承受較大械外力等固定場合。
  16. For laying indoors, in trenches, in ducts and down well, able tobear heavier pulling force, andfor fixed installation

    設在室內、電纜溝、道、豎井等能承受較大械拉力等固定場合。
分享友人