文件管理常式 的英文怎麼說

中文拼音 [wénjiànguǎnchángshì]
文件管理常式 英文
file management routine
  • : Ⅰ名詞1 (字) character; script; writing 2 (文字) language 3 (文章) literary composition; wri...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • 文件 : 1 (公文、信件等) document; file; papers; instrument 2 [自動化] file; 文件保護 file protection; ...
  • 管理 : manage; run; administer; supervise; rule; administration; management; regulation
  1. Second, the starting and stopping behaviors under disturbed condition are analyzed and calculated by using the dynamic concentrative parameter model, which gives some advice to better prescribe refrigeration system and set theoretic foundation for carrying out automatic control of refrigeration system. third, the normal running process is analyzed and calculated by means of rational matching theory, which gives some advice on how to better understand the parameter change under steady state and the affection of inlet - parameter on evaporator. fourth, the simulation software with dynamic characteristic is designed, which can be applied to calculate thernio - parameter of cryogen, air humidity and frost thickness under different initial and boundary conditions, and to carry out dynamic simulation under conditions of dryness, wetness and frostiness, at the same time, to achieve detection and simulation at any stage from starting to stopping

    的主要內容如下: 1 )對翅片蒸發器結構特點進行分析,選取適當的微元控制體,就干、濕和霜工況下對每個微元分別進行傳熱傳質分析,基於經驗關系確定霜的有關參數,對于霜工況下的霜生長建立模型,經適當假設,運用質量守恆、能量守恆和動量守恆方程建立適合動態模擬的蒸發器數學模型,為系統模擬奠定基礎; 2 )對蒸發在大擾動下的開、停機過程,運用動態集中參數模型進行分析和計算,為更好地描述製冷系統運行的全過程奠定基礎,同時也為製冷系統實現自動控制提供一定的論基礎; 3 )對蒸發器正運行過程,運用動態分佈參數和參數間定量耦合的觀點來分析和計算,為更好地了解穩態工況下各點參數的變化情況及各入口參數對蒸發器動態特性的影響即蒸發器性能對各參數變化的敏感性; 4 )編寫翅片蒸發器動態特性模擬計算程序,可以計算不同邊界條和初始條下的製冷劑熱力參數、空氣溫濕度和霜厚度分佈場,實現對翅片蒸發器在干、濕和霜工況下的動態模擬。
  2. There are three stepwise stages of the procedure of the dispute solution, which includes the decision of engineers, the dab and the arbitration. chinese contractors shall take actions to protect their benefits. these actions includes the careful analysis on the claims and the strict managements of contracts, the well understanding of the contracts, especially the terms that exculpatory clause of the employers, then following of the procedure and catching the very chance to bring about claims

    章指出索賠是國際工程合同中的一種具有補償性的、非講究時效和書面證據的歸責方,承包商可分別基於工程變更、僱主違約、風險因素或合同瑕疵等原因對發包商提出索賠請求,工程師決定、 dab爭端裁決和仲裁是解決索賠爭端的三種遞進的基本程序,中國承包商應從採取充分論證索賠權,準確識別索賠機會,熟悉合同、嚴格合同,充分認知僱主的免責條款、切實遵守索賠程序等多個方面維護自身的利益。
  3. This article discusses the standard of geographical information system and the model of geo - data. after analyzing the present system of geo - data share, presents a new method of spatial database. it designs and impalements a data share and exchange system, which enable storage geo - data attribute data and meta data to realize the integrative management of data

    系統分析了地信息系統標準和空間數據模型,並對見的空間進行分析;總結以前的空間數據共享體系結構;提出了新的空間數據庫平臺共享方案;在研究了oraclespatial對空間數據解決方案后,設計並實現以oralcespatial為存儲gis系統的空間數據、屬性數據,和元數據,實現數據一體化;並實現esri公司的
  4. Epc ( engineering, procurement and construction ) tender is normally taken as the way of international power project bid, the management of bid of the turnkey contract ranged from project information collection, agent and sub - contractor selection, pre - qualification confirmation, site investigation, equipment and material price requisition, bid document and offer preparation. especially, the management methods for choice of project, agent and sub - contractor selection, the organization setting and skill of bid offer are difference from domestic project. the ability to manage the international epc bid activity is the key factor to win the project, and is very important to the operation of the wined contract

    涉外電力工程通採用總承包方招標,投標涉及項目的前期跟蹤、代人及分包商的選擇、資格預審、現場踏勘及收集資料、設備詢價、編制投標及投標報價等投標全過程的各個方面,特別是項目的選擇、代人和分包商的選擇、組織機構的設置、報價技巧等方面的方法與國內總承包工程投標有較大的差別,針對涉外電力項目工程的特點,如何運用方法和技巧進行,將直接關繫到項目投標的成敗,同時對中標后進行項目的實際操作也具有舉足輕重的意義。
  5. Firstly, the process on setting up cost plan is discussed in details after comparing the main existed cost code system, the paper then presents project disjoint and code system, which is needed for the programmer. secondly, based on the theory of dynamic control theory, the meaning of five steps for cost control is analyzed as well as the points to pay attention to in respective steps. thirdly, the author researches the fidic < construction constract condiction > ( 1st edition, 1999 ), and then conclude all kinds of usual styles about payment and clearing on medium and final term

    結合工程實踐詳盡地討論了投資計劃的編制過程,揭示了投資控制五環節的內涵,並依據動態控制論指出在各環節實施中應注意的問題;在深入研究國際咨詢工程師聯合會( fidic )出版的《施工合同條》 ( 99第一版)的基礎上,總結歸納了中期價款結算的各種用方以及竣工結算,並對動態結算方法進行了細致剖析;以上述論探討為基礎,本最後提出了工程項目結算與支付系統軟體的功能設計和具體開發過程。
  6. The function of the software is useful, it has provided many functions such as the calculate of crop water requirement, pipeline layout ( automatic layout and manual operation ) and its optimization, pipe diameter optimization. investment budgetary estimate and economic beneficial result can be result. and can rapid create plan and do plan comparison, the software provides many kinds of result output such as graph. text, table and so on

    該系統可以實行作物需水量計算,系統設計流量推算、道水力計算、工程投資概算,經濟效益分析等功能,建立了用的數據庫(材、、水泵和電機等)並對其進行和維護,可以實現包括道布置、徑優化、材選擇等多種參數選擇在內的多種方案比較、優選。系統能提供圖形、本、表格等多種形的成果輸出,人機交互界面友好,操作方便。
  7. Windows versions used ini files, then moved to a binary and unified registry ; eariler versions of mac os had resource forks in the file system and a desktop file for its finder ; linux and other unix - like systems typically used dotted, hidden files in home directories, with configuration detailed in dozens of incompatible ways between window managers and applications

    Windows版本使用ini,后來改為二進制的(也是統一的)注冊表;早期版本的mac os在系統中有資源叉和供finder使用的桌面; linux和其他類unix系統通使用主目錄中分散的、隱藏的,窗體工具和應用程序之間的詳細配置有多種互不兼容的方
  8. For the problem in editing commonly occurred in the press ' s daily affairs such as the classification of the data format of electronic file, this paper pots forward a solution to the electronic document management with respect to order and standard in the press

    摘要通過對刊社編輯工作中見的電子數據格的整和歸類,結合目前實際工作中遇到的問題,提出相關的解決方案,實現刊社電子的條化、規范化。
  9. If the resident representative office of a foreign enterprise wishes to employ staff members, the case shall be handled in accordance with the provisions in document no. 48, signed and issued jointly, in 1981, by the ministry of public security, the ministry of foreign affairs, the general administration for industry and commerce, the commission for the administration of imports and exports, and the ministry of foreign trade ; and, in principle, no individual of a third country or chinese without regular registered residence in china shall be hired

    十、外國企業駐代表機構聘請工作人員,應按1981年4月6日公安部、外交部、工商行政總局、進出口委員會、外貿部聯合簽發的[ 81 ]公發(政) 48號規定辦,原則上不得僱用第三國人員和在華沒有正戶口的中國人。
  10. As these method calls get marshaled to wire formats and stream across the network, developers and administrators often want to keep track of things by maintaining detailed transaction logs in order to debug service behavior, profile performance, test security controls, and even model traffic shape for service - level improvement

    因為這些方法調用按照通過網路的在線格和流進行編組,開發人員和需要維護詳細的事務日誌跟蹤記錄,以便調試服務行為、配置的性能和、安全控制,甚至建模流量的形態,從而在服務層進行改進。
  11. The serialized objects stored in flat files are generally managed by the underlying os in its own particular way

    序列化對象(存儲在普通中的)通是以自己的特殊方通過底層os來的。
  12. I suggest modifying the format of a log file to include a column on recording significant interruption thresholds automatically calculated every time packet losses occur and another column to alert the administrators of impending problems of impacting uptime availability guarantees in a sla

    我建議修改日誌的格,用一列來自動記錄每次包丟失時自動計算得到的明顯的中斷閥值,另一列記錄一些影響到sla的正運行時間可用性保證的緊急問題,以此提醒員。
分享友人