斜交面 的英文怎麼說

中文拼音 [xiéjiāomiàn]
斜交面 英文
skew facets
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ動詞1 (把事物轉移給有關方面) hand over; give up; deliver 2 (到某一時辰或季節) reach (a cert...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. Perfect pre - processing and post - processing function is one of the main factors to evaluate the vitality and market value of the finite element analysis system surveying today development of finite element analysis technology, most of which concentrate on establishing fine user interface, also has some limitation on application, and especially, the research on the visualization of arbitrary cut - plane is always in ascendants to realize the visual processing on cut - plane needs reprocessing the results of finite element analysis which have get, so the algorithm is two parts : seeking the physical value of cut - plane and drawing 2d contours, the former, based on the theory of stress on " arbitrary inclined plane " in physical mechanics, use the method of linear interpolation method to get the coordination and physical value of intersection between cut - plane and element arris ; the latter, based on the tables on elements, nodes, stress and strain, summarize a rapid algorithm of generating 2d contours based on the grid. this thesis synthesizes there two parts and get a visual processing program under fortran

    縱觀有限元分析技術的發展,目前大多集中在建立良好的用戶界上的研究仍存在許多應用上的局限性,其中對任意剖上可視化的研究仍處于方興未艾的階段。要實現任意剖上可視化處理,必須先將得到的有限元計算結果進行再處理,因此在演算法上分為兩部分:求任意剖上物理量值的演算法及二維等值線演算法。前一部分以彈性力學中「任意的應力」為理論基礎,利用線性插值方法得到截與單元棱邊的點坐標及點物理量值;在此基礎上;根據已得到的單元及節點序號表、應力應變物理量表,總結出一種基於有限元剖分網格的快速生成二維等值線的演算法。
  2. The characters and reasons of easily destroyed asphaltum road was mainly discussed in this paper. then some prevention and cure measures was proposed to improve the quality of road construction

    摘要瀝青路易損病害易發生在水泥混凝土加鋪瀝青混凝土、地勢坑凹多雨水、坡、轉彎及十字路口、公站等路段。合理設計路結構、加強瀝青路防水設計、嚴格控制施工質量是瀝青路易損病害的主要防治措施。
  3. From the analysis, some suggestion about joint rigidity design is put forward : 1. joint initial rigidity can be enhanced within the limited range when to increase end - plate thickness ; 2. the rigidity and ultimate moment can be enhanced obviously when to adopt the beam with inclined section or to add axilla at the connections between beam and column ; 3. withm the permissive construction condition, exteriorly extended end - plate inclinedly placed is suggested to be applied firstly ; 4. when the rate of joint rigidity to beam rigidity, that is called, is less than 0. 1, the joints can be regarded as zero - rigidity joints ; on the other hand, if is more than 26, it is rigid connection joints

    採用梁並在樑柱接處局部加腋能明顯提高節點剛度和梁的抗彎能力; 3在允許的施工條件下,應優先採用外伸式端板放節點,有利於提高節點剛度,進而提高節點的抗彎能力; 4節點剛度與其連接構件的剛度比值0 . 1時,可按鉸接節點設計; 26時,可按剛接節點設計。
  4. The author suggests that the three lithosphere - scale faults, lancangjiang fault, jinshanjiang - ailaoshan fault and axis fault in the middle of the basin, are the main geological structures that control the formation of basin, magmatism and metallogenic congregate district. the anticline structure with an axis of triassic strata and the related fault system within the basin, and gonglang arch - shaped folding structure in the south of the basin are the geological structure controlling the formation of ore fields. junctions of two or more faults with different orientation, interlayer cataclastic structural zone and oxidation - reduction ( redox ) boundary were the favorable position for the formation of ore bodies

    認為瀾滄江斷裂、金沙江-哀牢山斷裂及盆地中軸斷裂這三條巖石圈斷裂是主要的控盆-控巖(巖漿巖)構造及礦集區尺度的控礦構造;盆地中以三疊系為軸的背構造及相關的斷裂系統、盆地西南緣公郎弧形構造等是礦田尺度的控礦構造;多組斷裂的叉、層間破碎帶及地層柱中的氧化還原界是形成礦體的有利部位。
  5. Due to slope cable bears barely alternative load longtime in nature environment, it is easy to corrosion and wreck. seriously, the bridge is possibility to collapse in strictness air empoison, water pollution, seashore and ocean surroundings. therefore, to study cable ’ s corrosion widely and to inhibit corrosion process are very important for increase endurance and safety of bridge construction

    由於拉索長期承受變載荷並暴露于自然環境中,特別是大氣污染嚴重地區、水污染嚴重地區、海濱及海洋環境,極易發生腐蝕破壞,嚴重者還會因坍塌而造成生命及財產的巨大損失,因此,全研究橋梁拉索的腐蝕,阻斷腐蝕的成因,對提高橋梁結構的耐久性與安全性具有重要意義。
  6. The direct periosteal branch of femoral artery stemmed from the femoral artery about 1 / 3 connection of the middle and distal femur, slanted toward inferiolateral distributing to anterior side of the distal femur

    股動脈直接骨膜支約在股骨中下1 / 3界處,發自股動脈,向外下行分佈於股骨下段前
  7. Strike is the trace of the intersection of an obliquely inclined plane with a horizontal reference plane.

    走向是傾與水平參考成線的跡線。
  8. The directrixes of the in former two transmissions are the loxodrome and the geodesic on the pitch cones, that of the latter is an equal - pitch line along the direction of straight generatrixes in the hyperboloid surface, also is the vertical trajectory of the straight generatrixes

    前兩種傳動形式的準線分別為節錐上的航線與測地線,後者的準線為單葉雙曲上沿直母線方向的等螺距曲線,且為直母線族的正軌線。
  9. Calculation and research of normal section strength of prestressed concrete skew hollow slab

    預應力混凝土空心板正截強度計算研究
  10. Slightly opposite to shishi clothing center, chaobo model & clothes rack co., ltd. is specifically intended for manufacturing middle - high grade model and rack

    超博模特兒衣架公司,座落於石獅市南洋路服裝城通便利,是專業生產中高檔模特兒衣架陳列道具的企業。
  11. All of the hydraulic structures are arranged in the right bank and four underground seepage tunnels are arranged parallel in horizon, and the axle wires intersect with syncline axis almost perpendicularity, and with rock formation obtusely. complex underground tunnels are formed under such formidable conditions, and each of seepage tunnels crosses nuclear of syncline and comes up against interlaminar sharing disturbed belt at different footage

    四條引水發電隧洞在平上平行布置,軸線方向與本區構造線方向近於垂直,與巖層走向大角度相,構成一復雜地下洞室群,並在不同洞段通過沙金壩向核部,且遭遇多條層間剪切錯動帶。
  12. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗井採用小斷導硐后刷大、高負壓多排鉆強抽,密集叉鉆孔邊掘邊抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。
  13. The gullies are formed by the processes of infiltration - interflow - collapses. ( 2 ) in the slope with sand - loess, the major factors of water erosion are the rainfall intensity and rainfall amount of annual first rainfall. ( 3 ) in the region, the evolution processes of slope gully system results from alternative actions of sand deposition and water erosion

    ( 1 )有片沙覆蓋的坡小區,徑流量少,但徑流含沙率大,坡溝的形成過程是:垂直滲流坡地潛流崩塌; ( 2 )在沙黃土坡小區,每年春末夏初降雨的強度及降雨量是決定坡產沙量的關鍵因素; ( 3 )該區坡溝系統的形成發育是風沙沉積、風蝕與水蝕替作用的結果。
  14. For floors where abrasion and impact resistance as well as dust - proof are required such as for shed, loading area at port, machinery industry, aitcraft parking apron, garage, parking area, oil storage piant, pathway floor, mine chute, bridge surface, reservior overflow relief channel, energu consumption. loading slope, military industry, weaving mills, cold storage plant, automobile industry, electronic industry express highway, etc

    倉庫、碼頭裝卸區、機械工廠、飛機停機坪、車庫、停車場、油料庫、通道地、工礦溜槽、橋、水庫溢洪道、通池、裝卸坡、軍工企業、紡織業、冷凍庫房、汽車工業、電子工業、高速公路等適合金屬骨料要求的混凝土地
  15. The experimental and numerical studies on the two enhanced tubes are performed. the strong multi - longitudinal vortex flow in the aea - tube is induced by alternating change of the elliptical cross - section, and for the ddir - tube, the strong multi - longitudinal vortex flow is

    叉縮放橢圓管是通過橢圓截叉變化誘導產生強烈的二次流和多縱向渦流,而不連續雙向內肋管則是通過不連續的雙向內肋對的作用形成強烈的多縱向渦。
  16. Comparisons are made between present method and published results for a wall and non - wall sided circular cylinder in heave and sway. theoretical and numerical results for two - dimensional wave generated by rocker flap wavemaker are also given. in all cases the comparisons are excellent

    作為算例,文中分別計算了圓柱與水時的水動力系數以及搖板造波問題的速度勢,計算結果與文獻值和理論值符合的較好。
  17. The main crack of tiaohu formation are straight oblique - cracks and level crack, there are many scores in the crack. the length of cracks is long, and they cut across several layers. the average surface density of the cracks is 0. 101 slips / m. the cracks in lucaogou formation is mostly net cracks, and there are solution on crack surface

    條湖組的裂縫多為平直的縫和水平縫,縫多見擦痕,延伸長度大,切穿多套地層,裂縫密度平均為0 . 101條米;蘆草溝組裂縫多為網狀裂縫,縫有溶蝕現象,多存在於碳酸鹽巖內,裂縫密度平均為0 . 143條米。
  18. Located on zhongxing road, danzhou city, shunlong hotel, which having an obligue position on the other side of the municipal government, is only 1 km away from the danzhou bus company

    順龍大酒店位於海南省儋州市中興大道,市政府,距海汽儋州公司1公里,通十分便利。
  19. The thesis classifies the underpass bridges according to their behavior characteristics, and static and dynamic behaviors of two main structures are analyzed, compared and concluded. based on the behavior characteristics of underpass bridges with different skew angles some useful suggestions are then given for their design. also, the construction methods of underpass bridges are summed up and each methods " process is described in detail

    本文按照地道橋的受力特點對其進行了分類,對其中兩種主要結構的靜力、動力特點進行了分析、比較和歸納;基於框架地道橋在不同角度下的受力特徵,對其結構設計提出了有用的建議;總結了地道橋的兩類施工方法,並較詳細地闡述了它們各自的主要過程;結合某地道橋設計計算實例,介紹了在結構設計方的實用理論和方法。
  20. For above ground installation, the receiver & launcher shall be horizontal, which center is about 1m high from ground, and shall be connected to underground pipe by nozzle stub and bend but not skewed crossing connection

    時,收發球筒為臥式,中心距地高度一般為1米左右,通過短管及彎管與地下管線連接,不宜採取叉連接。
分享友人