斜坑 的英文怎麼說

中文拼音 [xiékēng]
斜坑 英文
hoisting slope
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  1. The characters and reasons of easily destroyed asphaltum road was mainly discussed in this paper. then some prevention and cure measures was proposed to improve the quality of road construction

    摘要瀝青路面易損病害易發生在水泥混凝土加鋪瀝青混凝土、地勢凹多雨水、坡、轉彎及十字路口、公交站等路段。合理設計路面結構、加強瀝青路面防水設計、嚴格控制施工質量是瀝青路面易損病害的主要防治措施。
  2. The sankeng geothermal field is located on the northeastern side of the wuchuan - sihui deep fault and in the sankeng synclinal karstic basin

    摘要廣東三地熱田位於吳川四會深大斷裂帶的東北側,三巖溶盆地內。
  3. The slope sand mine is over the right side of the tunnel

    在隧道口右方就是度極大的沙礦
  4. Open a very inclined and small ditch on the pit side, in front 釘 a wood 橛 son of the ditch

    邊上開有一條的小溝,溝的前頭釘一根木橛子。
  5. The major activities involved during the construction stage of the project are cut and fill earthworks, slope works, earth retaining walls, irrigation buffer lake, detention ponds and tanks, sand bunkers and golf course capping and turfing

    2 . 3 . 1在工程項目的施工期內,主要的工程活動包括挖填土方工程坡工程護土墻灌溉緩沖湖靜水塘缸沙及高爾夫球場的加蓋草皮鋪設。
  6. Accent your living room with a chinese antique. continue along bonham strand west, turn right into possession street, walk up the sloping street and turn left into hollywood road

    沿文咸西街走,右轉入水口街,沿這條路一直往上走,再左轉入荷李活道。
  7. The main causes of breakage were concrete tube pile instability of foundation pit or failure of its bracing, soil squeeze due to pile driving, incorrect excavation and incorrect heap of soil

    摘要造成混凝土管樁傾與斷裂的主要原因為基邊坡失穩或支護結構破壞、沉樁擠土效應以及挖土與堆土不當等。
  8. Discussion on mechanism of surface collapse pit and dimensions of obstructive ridge for steep inclined coal seam mining

    急傾煤層開采地表塌陷形成機理與安全礦柱尺寸研究
  9. Motorists heading to tai hang and causeway road should keep left when leaving the down ramp of the flyover ; and

    前往大及高士威道的駕駛人士當駛離天橋下行路時須靠左行駛及
  10. The work principle of inclined pipe and setting device is analyzed, the feasibility in reforming sludge pit by shallow layer settling technology is approached

    分析了管沉澱裝置的工作原理,探討了應用淺層沉澱技術改造撈的可行性。
  11. Abstract : the work principle of inclined pipe and setting device is analyzed, the feasibility in reforming sludge pit by shallow layer settling technology is approached

    文摘:分析了管沉澱裝置的工作原理,探討了應用淺層沉澱技術改造撈的可行性。
分享友人