斜坡安全研究 的英文怎麼說

中文拼音 [xiéānquányánjiū]
斜坡安全研究 英文
slope safety studies
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : Ⅰ形容詞1 (完備; 齊全) complete 2 (整個) whole; entire; full; total Ⅱ副詞(完全; 都) entirely...
  • : 研同 「硯」
  • : Ⅰ動詞(仔細推求; 追查) study carefully; go into; investigate Ⅱ副詞[書面語] (到底; 究竟) actually; really; after all
  • 斜坡 : slope; inclination; incline; hill; clivus; batter; decline; dip; pitch; lean; backfall; pali; [地...
  • 研究 : 1. (探求) study; research 2. (考慮或商討) consider; discuss; deliberate
  1. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和。通過對不同方案的計算分析和,比較面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  2. The overall fill amount of the airport is 1091. 2347 noyriastere and the height of the fill is almost 60m, with pertains to the high fill projects of the airport, whose site to prography and lithology is very varied. the basement of the till area is a slope dip place of slow dip downhill roch. there the research on the stability of the side slope filled is very necessary, this is because not only the design construction operation and investment of project is under influence, but also the feasibility of the projecct is also restricted, which is the key of the successful construction of the airport

    為開發資源,改善投資環境而興建的荔波機場位於貴州省荔波縣東北約12km ,機場總填方量1091 . 2347萬m ~ 3 ,填方高度近60m ,屬高填方機場,其場址地形及巖性復雜,填方區基底為緩傾角順巖層的地區,因此填方邊的穩定問題是十分必要的,因為不僅影響到工程設計、施工、運行和工程投資,甚至制約著工程的可行性,是機場順利建設的關鍵。
  3. Slope safety studies

    斜坡安全研究
  4. This study was to determine the safety, feasibility, practicality and effectiveness of the expanding retrosigmoid suprameatal ( erssma ) approach dealing with the tumor invading the middle and superior clivus by the study of it ' s microsurgical anatomy. the advantage of less damage which the retrosigmoid approach had was reserved in the retrosigmoid suprameatal approach ( rssma )

    本題就是通過對擴大乙狀竇后經內耳孔上入路顯微外科解剖學,來確定用該入路處理向中顱窩、上侵犯型巖區腫瘤的性、可行性、實用性、有效性。
分享友人