斜坡響應時間 的英文怎麼說

中文拼音 [xiéxiǎngyīngshíjiān]
斜坡響應時間 英文
ramp response time
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 斜坡 : slope; inclination; incline; hill; clivus; batter; decline; dip; pitch; lean; backfall; pali; [地...
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊角、高、土體力學參數的關系、土釘總力與庫侖土壓力的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊、二階邊進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊形態對土釘的軸力的影、上下階邊在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體適用於特定的開挖方式、原始開挖出的邊形態對一些類型體的邊土釘支護有較大的影而對另外一些影不大、二階邊臺階寬度的合理確定、二階開挖及支護比一階具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、面傾及墻背有摩擦面豎向力分佈、面板背土壓力的分佈形態作了研究,得出了邊支擋土壓力受體內部穩定與面局部穩定兩個方面的影、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  2. Ramp response time

    斜坡響應時間
分享友人