斜坡響應 的英文怎麼說

中文拼音 [xiéxiǎngyīng]
斜坡響應 英文
ramp response
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • 斜坡 : slope; inclination; incline; hill; clivus; batter; decline; dip; pitch; lean; backfall; pali; [地...
  1. Through tracing the change of the stress on the horizontal and slantwise paths, the influence and scopes of the excavation effect on the inside stress field of the slope are put forward

    通過對水平和傾路徑的力追蹤,提出了開挖效對邊內部力場的影程度和范圍。
  2. The result indicates that, after the bridge built, the stress change around major bridge pier is the greatest, and the effect to the stability of slope is also the greatest

    研究表明:橋荷載施加后,主橋墩處的力改變最顯著,對穩定性影較大。
  3. In this paper, a numerical simulation is conducted, which is based on the test data of the model experiment of sloping ground with the help of the marc program. when the bearing capacity characters of level ground and the foundations adjacent to or above slopes are analyzed, the effect is considered, which includes deformation moduli, density, poisson ratio, angle of internal friction, stress - strain relationship, slope angle, relative distance from the edge of slopes and relative depth of footings

    本文利用地基模型試驗的試驗數據,用marc軟體進行了地基模型試驗的數值模擬,分析了平地地基、臨地基和地基的承載力特性,研究了變形模量、容重、泊松比、內摩擦角、變特性、度、基礎的相對頂距及其相對埋深等因素對地基承載力性能的影
  4. Analysis and tests show that by using slope compensation, the open - loop instability, sub - harmonic oscillation, non - ideal closed - loop response and noise etc. when duly cycle above 50 %, can be reduced or eliminated

    理論分析與試驗表明,通過引入補償可以抑制或消除占空比超過5 %時的開環不穩定性、次諧波振蕩傾向、不理想的閉環、噪聲等。
  5. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體力和變位的影進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  6. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊角、高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊、二階邊進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊形態對土釘的軸力的影、上下階邊在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體適用於特定的開挖方式、原始開挖出的邊形態對一些類型體的邊土釘支護有較大的影而對另外一些影不大、二階邊臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、面傾及墻背有摩擦時的面豎向力分佈、面板背土壓力的分佈形態作了研究,得出了邊支擋土壓力受體內部穩定與面局部穩定兩個方面的影、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  7. ( 4 ) a veries of depositional system of early cretaceous have been identified firstly : basin floor fan, slope fan, leveed channel, subparallel facies, slump facies, lowstand wedge, tst, hst. combining with seismic reflection and log response, this paper discusses distribution of above facies, microfacies and reservoir characteristics

    ( 4 )首次確定了下白堊統的各種沉積體系:盆底扇、扇、有堤水道、亞平行相、滑塌相、低位楔、 tst 、 hst ,結合地震反射和測井,討論了它們的分佈,微相和儲層特徵,對今後勘探開發上作無疑有重要價值。
  8. Ramp response time

    斜坡響應時間
  9. Slope excavation will influence the original stress field inside the natural slope

    摘要邊開挖會影自然內部力場的原始狀態。
分享友人