斜堤 的英文怎麼說

中文拼音 [xié]
斜堤 英文
glacis
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
  1. Longer term post - construction monitoring of sloping seawall for hard coral establishment, and in case of non - establishment of corals undertake additional mitigations and or translocation of coral polyps

    延長坡海築成后的監察期,確保硬體珊瑚健康成長若未能達致預期效果,則採取其他緩解措施及或移殖珊瑚蟲
  2. Preliminary conclusions are got through the analysis of the experimental data such as effect of the ice velocity on the ice force, ratio of components of forces when ice sheet acting on the vertical bank - head, ice force ratio of vertical to 45 incline as well as ratio of level ice force to the vertical ice force when acting on 45 incline

    對試驗數據諸如冰速對冰力的影響、冰排作用於垂直面頭時各向分力的關系比、垂直面與45面冰力關系比以及作用於45面時其水平與垂直冰力的關系比等進行了分析,並得到初步結論。
  3. The plans will be carried out in different stages, which involves 11 key projects, including : taipu river, wangyu river, dyke around the taihu lake, south - drainage in hangjiahu plain, water drainage and diversion in huxi, hongqitong, flood control in east - west tiaoxi, water drainage and diversion in wuchengxi, enlarging lanlugang, dredging liuhe and xietang, north drainage in hangjiahu, and flood prevention in the upper stream of huangpu river

    該方案以流域防洪除澇為主,統籌兼顧供水,航運和環境保護等方面的利益,計劃分期實施包括太浦河、望虞河、環太湖大、杭嘉湖南排、湖西引排、紅旗塘、東西苕溪防洪、武澄錫引排、擴大攔路港疏浚泖河及塘、杭嘉湖北排通道及黃浦江上游防洪工程等十一項骨幹工程。
  4. Rock - fill sloping seawall

    石砌面海
  5. Associated works on seawall construction, slope stabilisation, landscaping, street lighting and drainage

    進行相關的工程,包括築建海坡鞏固美化環境裝設街道照明設施和敷設排水渠。
  6. Engineering structures falling in this category are gravity dams with foundations, slopes and embankments, etc.

    屬于這種范疇的工程結構為帶有基礎的重力壩,坡和路等。
  7. Ancillary works including earthworks, construction of embankments, footpaths, drainage and river training works, slope works, landscaping works, construction of retaining walls, and the erection of noise barriers

    進行附屬工程包括土方工程行人路建築路渠務及改善河道工程坡工程環境美化工程建築護土墻,以及設置隔音屏障。
  8. Experimental investigation of oblique random wave load on vertical breakwaters

    向隨機波對直立作用的試驗研究
  9. Engineering measures for pre - consolidation and treatment of cut soft foundation with high pressure jet grouting pile or anti - slide pile are presented, together with engineering measures for consolidation of inclined soft embankment foundation with gravel pile and lateral restrained pile, and the methods of design, construction are also introduced in detail. 6

    提出了高壓旋噴樁或抗滑樁預加固整治塹軟基的工程措施;提出了採用碎石樁和側向約束樁加固傾基底路軟基的工程措施,並對設計、施工、檢測進行了詳細介紹; 6
  10. But as the conviction gained ground among them that the man in the white hat was doing no harm, and either sat quietly on the slope of the earthwork, or, making way with a shy and courteous smile for the soldiers to pass, walked about the battery under fire as calmly as though he were strolling on a boulevard, their feeling of suspicious ill - will began to give way to a playful and kindly cordiality akin to the feeling soldiers always have for the dogs, cocks, goats, and other animals who share the fortunes of the regiment

    但是當大家都相信這個戴白帽子的人不僅不會做什麼壞事,而且他或者會安安靜靜地坐在土坡上,或者會帶著怯生生的微笑彬彬有禮地給士兵們讓路,在炮壘里像在林蔭道上似的安閑地在彈雨中散步,這時,對他的敵意的懷疑漸漸變為親熱和調笑的同情,正像士兵們對他們的小狗公雞山羊,總之,是對生活在軍隊里的動物的同情一樣。
  11. Wave screens are often constructed on the top of sloping wave protection constructions such as seawall, revetments, etc. to meet the requirements of overtopping and stability and cut down engineering cost

    摘要在海、護岸等坡式防浪建築物中,為滿足越浪與穩定要求,減少工程投資,通常在頂設置防浪墻。
  12. ( 3 ) the upper result of settlement field, stress field and crack deepness offers a theoretics gist for reinforcing bank. the paper concludes several methods of reinforcement. through choosing project, made certain adopting geomebrance to reinforce the bank

    本文又對防加固的各種措施方法進行了歸納整理,通過方案比選,選擇用迎水面鋪土工膜的方法進行防滲加固,並對土工膜的材料選擇進行了計算。
  13. Reconstruction of existing castle peak road from tai lam kok to siu lam ; associated works on seawall construction, slope stabilisation, landscaping, street lighting and drainage

    進行相關的工程,包括建築海坡鞏固美化環境裝設街道照明設施和敷設排水渠。
  14. According to our national norm, the weight of the core of rubble mound breakwater should be 10kg ~ 100kg

    根據我國規范規定,坡式防波心石應採用10 100kg塊石。
  15. Pitched slope seawall

    向海建的海
  16. ( 4 ) a veries of depositional system of early cretaceous have been identified firstly : basin floor fan, slope fan, leveed channel, subparallel facies, slump facies, lowstand wedge, tst, hst. combining with seismic reflection and log response, this paper discusses distribution of above facies, microfacies and reservoir characteristics

    ( 4 )首次確定了下白堊統的各種沉積體系:盆底扇、坡扇、有水道、亞平行相、滑塌相、低位楔、 tst 、 hst ,結合地震反射和測井響應,討論了它們的分佈,微相和儲層特徵,對今後勘探開發上作無疑有重要價值。
  17. According to the test results, the deformation characteristics of level soft - soil foundation and slope soft - soil foundation under the load of embankment are analyzed. the effects of driven piles and stabilizing piles reinforcements are compared. the respective influence of the two reinforcement means upon foundation deformation is discussed and useful suggestions on how to use the two means are finally put forward

    根據試驗結果,分析了水平軟弱土地基與坡軟弱土地基在路荷載作用下的變形特性;比較了打入樁加固與抗滑樁加固的效果;探討了兩種加固方案的對地基變形的影響,並對兩種加固措施的使用提出了建議。
  18. Associated drainage, lighting, retaining walls, reinforced fill embankment, slope works and landscaping works

    進行相關的渠務照明護土墻加筋填土坡及環境美化工程。
  19. After the systemic comparison of the two methods, the detail applicable conditions have been suggested. by the physical model tests and various methods, the frequent spectrum and the directional spectrum of incident waves and reflected waves of slope breakwater have been investigated systemically, and the bulk reflection coefficients, the directional spreading of reflection coefficients and the frequent spect

    通過物理模型試驗,系統地研究了前入、反射波方向譜的分離計算,採用mtpm分析得到了單向(包括向)不規則波的總體反射系數和反射系數頻率譜(隨坡變化)以及由iribarren數表示的包含坡影響的反射系數頻率譜。
  20. 9. ancillary works including drainage, slope, landscaping and electrical and mechanical works, construction of embankments, retaining walls and cycle parks

    9 .進行相關的輔助工程,包括渠道,坡,環境美化,機電等工程,以及興建路,護土墻和單車停放處
分享友人