斜場管 的英文怎麼說

中文拼音 [xiéchǎngguǎn]
斜場管 英文
inclined-field tube
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  1. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市;海南環島線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  2. As one kind of key equipment in piping work of large - scale turbo - generator set in power plant, the machine is especially applicable to various welding bevels, flat end and angle of outer & inner diameter of ascending pipe, elbow pipe, bend, flange and etc., which greatly meets demands in pipe processing of construction site and manufacturers

    本機床是電站大型汽輪發電機組的道施工的關鍵設備,對直、彎、彎頭、法蘭等體的各種型式焊接坡口,端平面,內外徑過緩度及直口,能滿足施工現和製造廠家對各種件的加工要求。
  3. By considering deflection of freezing pipes and using the fem method, the three - dimensional temperature field of the connecting passage of shanghai east fuxing road tunnel is simulated

    考慮了凍結布置的情況,利用有限元方法對上海市復興東路隧道聯絡通道進行了三維溫度模擬。
  4. Based on several actual cases, the temperature control measures for roller compacted concrete ( rcc ) gravity dam and arch dam such as structural jointing for construction ; lowering of concrete placing temperature ; water pipe cooling ; surface insulation ; inclined - layer placing etc., the measures to improve the material properties i. e. the application of micro - expanding concrete ; enhancement of material crack - resistance property and the requirement for the simulative analysis on both the temperature field and stress field as well as some problems concerned are summarized herein on the basis of the analysis on the material properties ; construction characteristics and the changing characteristics of the thermal stress of roller compacted concrete

    摘要從碾壓混凝土的材料特性、施工特點、溫度溫度應力的變化特點入手,結合幾個工程總結了碾壓混凝土重力壩、拱壩的分縫方式,降低澆築溫度、水冷卻、表面保溫、施層碾壓等溫控措施,採用微膨脹混凝土、提高材料抗裂性能等改善材料性能措施及碾壓混凝土溫度、應力模擬分析的要求和應注意的問題。
  5. Therefore, it is necessary to take suitable measures to alleviate the influence of flow deflection on the heat - transfer performance of the condenser

    束布置時,應當採取相應措施減小流對凝汽器傳熱特性的影響。
  6. When the acoustic impedance contrast between the thin dipping interface and its adjacent formations exits, their interfaces can be observed from the snapshots, but the acoustic field is rather complex

    4 、當傾薄夾層的聲阻抗與其鄰層的聲阻抗相差較大時,盡從波圖中可以大致看出兩個地層界面的存在,但此時聲分佈非常復雜。
  7. The bigger the diameter, the high the heat efficiency, but the weak the temperature increasing ability, length has less effect on the heat efficiency, tilt angle has less effect on the flow field and temperature field while it is larger than 30 degree, vacuum degree and emissivity have great effect on the flow field and temperature field while there is a great temperature difference between the liquid in the tube and the surroundings, the furring has less effect on the heat transfer but should be cleaned up in 3 - 5 years because of poor water quality, the higher the solar flux or the more the temperature difference between the liquid and the surrounding, the more the heat loss and the lower the heat efficiency

    分析了各種因素對太陽能真空集熱和溫度的影響。直徑越大,熱效率越高,但升溫能力弱;長度對熱效率影響不大;傾角度大於30后,自然對流已經能夠充分進行,考慮以能夠吸收到最大太陽輻射為主;真空度和發射率對熱效率和溫度影響很大,尤其是在介質溫度與環境溫度差異比較大時;水垢對傳熱影響較小但由於水質的問題應該被3 5年清洗一次;太陽輻射強度越大,介質溫度與環境溫度差異越大,熱損失越大,效率越低; 4
  8. This thesis gives the example of donghai county, jiangsu, analyses the present situation of teacher movement according to crosswise movement and up and down movement, analyses deeply its reasons from economy, management and psychology etc, try putting forward how to realize its rational movement, which includes : improving the teachers " treatment, inclining to the teachers of this area, establishing teacher market, perfecting teacher employment, carrying out kinds of flexible engagement mechanism, putting teacher movement on terms into practice

    本文以江蘇東海地區為個案,按照水平流動和垂直流動的分類對其鄉鎮中學教師的流動進行分析,從經濟、理、心理等幾個方面深入地挖掘其原因,並借鑒國內外教育和一些企業的先進經驗,嘗試著提出如何實現經濟欠發達地區鄉鎮中學教師合理流動的對策。其中包括:切實提高教師待遇、政策向農村教師傾、構建教師人才市、完善教師聘任制度、建立靈活多樣的用人機制、實行教師定期流動等。
  9. Cloning is just like a double - sided sword - it may bring great benefit for the humans and grave disaster as well. to avoid the abuse of cloning and stop the related experiment, the following countermeasures must be immediately taken : ( 1 ) strengthen the moral discipline on science and technology, ( 2 ) strengthen the regulation and control taken by various governments and organizations, ( 3 ) strengthen the supervision of public opinion, ( 4 ) popularize the inculcation of bioethics. it can be concluded that only the means of administration, law, morality, public opinion and inculcation be taken, can the dissimilation of the technology of cloning be avoided and the healthy development of cloning toward the direction of benefiting humans be ensured

    在社會主義市經濟條件下,實現教育公平的基本措施主要有:大力發展生產力,為實現教育公平的奠定堅實物質基礎;加強政策引導,通過實施義務教育均衡發展的政策,改革高考招生錄取政策,調整教育評價政策,促進教育公平;完善社會主義教育法,給教育公平提供法律保障,即通過加強教育立法工作、調整與教育公平發展不相適應的法律法規,嚴格按法律保障教育公平:深化體制改革,通過改革辦學模式、改革教育投資體制、改革教育理體制來推動教育公平的發展;通過利益補償以縮小教育的不平等,要對貧困落後地區教育發展實行扶助和傾政策,推進薄弱學校改造工程和加大扶貧幫困力度,以促進教育公平的實現。
  10. On the basis of a case study regarding freezing engineering project from a coal mine, huainan, the frozen wall thickness, average temperature, freezing time of an oblique frozen tube axe simulated using large - scale non - linear finite element computational procedure adina numerical simulator, resulting in the data coincided with site measured

    以淮南某煤礦凍結工程為研究背景,應用大型非線性有限元計算程序adina模擬凍結條件下的凍結壁厚度、平均溫度與凍結時間等,結果和現實測十分接近。
  11. This paper has studied and set up a supervision and control system based on the backing item of jinzhou yangtze river bridge with main span of 500m, by analyzing the development of construction control of cable - stayed bridges in china and abroad, foreword calculation of 250 work cases of plane bar fem, adoption of advanced equipment and devices, quick analysis of gathered data research of karemen filtering method, least square and gray model gm ( 1, 1 ) into the identification of the real state and precuts and effective manage mechanism

    本文以荊州長江公路大橋主跨500米的混凝土拉橋施工為應用背景,通過分析目前國內外大跨度混凝土拉橋施工控制現狀,結合該橋施工實踐,運用平面桿系有限元計算理論對大橋250個工藝進行正裝計算,採用先進測試設備和儀器,利用計算機快速分析處理技術對現監測系統收集的數據進行誤差分析,系用卡爾曼濾波法、最小二乘法和灰色理論gm ( 1 , 1 )進行結構真實狀態的識別和後期預測,通過科學高效的監控理機制的運行和監控實踐,探索並建立了一套適合於大跨度混凝土拉橋的施工監測監控體系。
分享友人