斜面橋墩 的英文怎麼說

中文拼音 [xiémiànqiáodūn]
斜面橋墩 英文
batter pier
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1. (土堆) mound 2. (墩子) a block of stone or wood Ⅱ量詞(用於叢生的或幾棵合在一起的植物) cluster
  • 橋墩 : (bridge) pier
  1. In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details

    本文全總結了吉林臨江門施工技術,詳細敘述了主大型沉井施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。拉索施工及施工控制等。
  2. In this paper, the best reinforcement scheme, which was found by nerve network and genetic algorithm from serval reinforcement schemes, was applied to strengthen a prestressed concrete continuous rigid fame bridge with many quanlity faults, such as excess fall deflection of the main span deck > serious web slop crack existing between main pier abutment and one fourth span, and very poor mud jacking quanlity in the prestressing tendon tubs

    本文針對某預應力混凝土連續剛構所存在的實際問題:如主下撓度過大;主和四分之一跨徑處均存在較嚴重的腹板裂縫;預應力管道壓漿質量較差等。提出了幾種加固方案,並用神經網路和遺傳演算法進一步優化出了較佳的加固方案,進行了加固前後效果對比分析。
  3. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔的主體工程,結合已有的梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和;用可考慮幾何非線性的桁元模擬拉索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張拉預應力鋼筋和張拉拉索。
分享友人