方順橋 的英文怎麼說

中文拼音 [fāngshùnqiáo]
方順橋 英文
fangshunqiao
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. Abstract : based on thestatic wind force factors of a tower and on the root - mean - square of the buffetingdisplacement responses of the tower top, which are measured by wind tunnel tests inlaminar and turbulent field respectively, the static and buffeting internal forces of thetower bottom control sections under its design wind speed are obtained by linearsuperposition method and fem

    文摘:基於均勻流和紊流風場中的塔模型風洞試驗所測得的塔空氣力靜力系數及塔頂抖振響應的位移均根,採用線性疊加法及有限元法反演,給出設計風速下塔底控制截面的風向靜風及抖振內力。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工法;壓漿、封端、面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工法,並可為以後類似施工作借鑒。
  3. This paper theoretically inquires into the general principles and the transporting requirements for large item transport. by expounding and proving all kinds of transport plans, the paper gets an effective whole reading transport plan, including the choice of the transport route, the analysis of the bridge and road, the founding of a special transport organization. for transporting the container successfully, the paper carefully analyzes the route and conditions of transporting it, and gives several possible programs. by the way, this paper states every detail of whole reading transport and tries to give each solution of every problems

    本文對大件運輸的一般規律和運輸要求進行了理論探討,根據核反應堆壓力容器的結構特點和運輸要求,經過各種運輸案的論證,確定出一種行之有效的全公路運輸案,選定運輸線路,分析道路梁狀況,建立運輸組織機構,使該大件利運達目的地。本文詳細說明了核反應堆壓力容器運輸線路條件和幾種可能的案,闡述了全公路運輸案的各個細節及所解決的各種運輸技術難題。
  4. There are many materials and members to be hoisted during construction of the suspension bridge, unfortunately, the out - spread overhead curved cable makes it impossible for hoisting the stiffening girder with normal cable - supported lift. in order to ensure the construction proceeded smoothly, a multifunctional overhead cableway system is developed, thus accommodating all the hoisting tasks for the superstructure ( stiffening girder )

    懸索施工中需要吊裝的材料和構件很多,豐都長江大懸索主纜採用空間外張式,使加勁梁的吊裝不能採用一般的纜載吊機形式,為使施工的利進行,本施工中開發了多功能高架索道施工案,以一副索道完成了多種工作,全面解決了上部結構(包括加勁梁)的多項吊裝作業。
  5. Some experts once suspected that the reserve pre - stresses in the lateral beams are not enough. in order to settle this problem, three construction schemes are analyzed comparatively. the results indicate that the pre - stresses in the lateral beam are acceptable and tensioning the reinforcements by two steps is the appropriate method both for the girder and the lateral beam

    針對這一問題,本文採用三種施工案進行對比計算分析,結果表明橫隔梁中的預應力儲備是滿足要求的,而且金馬大採用的這種橫隔梁力筋分批張拉的施工序使該邊主梁及橫隔梁的受力都較為合理。
  6. Customers from huizhou, shenzhen and dongguan should pass humen bridge and the nansha dadao of panyu district to shiqiao, then drive on the guangzhou ? zhuhai line of 105 national road until you reach the traffic post of midea group in beijiao ( the crossing of sanhong bridge ), then turn right to sanle lu and drive along to lecong crossroads, turn left and drive along for 200m and you will reach sunlink north section furniture city of lecong ; or you can drive in the direction to foshan through guangzhou - shenzhen highway until you reach shunde lunjiao crossroads ( longzhou lu ) where you can drive to foshan and longjiang

    惠州、深圳、東莞向客人,經虎門大番禺南沙大道到市走105國道廣珠線到北?美的集團交通崗(即三洪路口)右轉?三樂路直行到樂從立交左轉200米即到樂從聯北區家私城,或走廣深高速往佛山向,在德倫教立交(龍洲路) ,可往佛山、龍江向。
  7. There are two equally important contents - structure line shape and structure stress in construction monitoring and controlling. they must be controlled all - round in order to making trouble - free construction and reaching the design point

    梁的施工監控包括結構線形和結構應力兩面的內容,具有同等的重要性,必須全面控制才能使施工利進行,才能達到設計狀態。
  8. Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated

    本文以蓮沱特大工程實踐為背景,以主拱施工研究為主線,對鋼管混凝土拱重難點施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計施工中存在的不足和今後需改進的向;通過對鋼管混凝土拱施工過程中內力的計算,確定了拱肋施工最不利荷載工況下加載重量、壓重序和張拉臨時預應力束等一系列施工措施,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。
  9. Drive from guangzhou and go through zhujiang tunnel and hedong bridge to foshan, then go across lanshi bridge and drive in the direction to zhanjiang for 500m and you will get to sunlink north section furniture city of lecong

    廣州城區亦可經珠江隧道、鶴洞大到佛山,過瀾石大往湛江向直行500米即到樂從聯北區家私城。
  10. The pc rigid frame bridge can meet with the carrying capacity of long span bridge. this kind of structure is fit for the comfortable steer with no other expansion joints except for those at the two ends. it characterized the wholeness of structure, good astigmatic ability and load - bearing ability, construction rapidness, bright and pithiness bridge style, easy to maintain and convenient for segmental construction using the cantilever technique, so rigid frame bridge have taken an increasingly great proportion in bridges constructed and those under construction at city and county

    剛構能滿足特大跨徑梁的受力要求,除兩端以外無其他伸縮縫,有利於行車平舒適,具有結構整體性能好、抗震能力強、承載能力強、施工快捷、體簡潔明快、維護便和便於懸臂施工等結構特點,因而在城鄉已建和在建的梁中占據了越來越大的比重。
  11. Based on tianmu bridge - no. 3 landscaping pedestrian bridge on jian river in shunyi district of beijing, this paper expounds the design considerations, type alternatives and layout of the structural system

    摘要針對北京市義區減河3號景觀步行天目,詳細闡述了該案比選和結構布置。
  12. Consequently time and cost can be saved greatly. ( 3 ) design method for controlling cracks in the negative moment zone of the continuous composite girder the crack mechanism of the concrete deck in the negative moment zone of the coniinuous composite girder, the relationship between the crack and the int

    分析認為,採用中間支點升降法與調整混凝土板施工序相結合的施工法,不僅可以避免負彎矩區混凝土裂紋,還可以合理調整鋼梁和混凝土板的內力,並使端支點與中間支點反力更均勻,使組合梁的結構更加經濟合理。
  13. At the first meeting of the hong kong - zhuhai - macau bridge advance work co - ordination group ( co - ordination group ) held in guangzhou today ( august 29 ), members exchanged their views and conducted constructive discussions about various aspects on the advance work of the bridge. members remarked that the meeting was smoothly held and concluded with satisfactory outcome

    港珠澳大前期工作協調小組(協調小組)的首次工作會議於今天(八月二十九日)在廣州舉行。會上協調小組的成員就港珠澳大前期工作的多面事宜交流意見,並進行了具建設性的討論。會后協調小組成員均表示會議非常利,成果令人滿意。
  14. The best way to visit the bridges is travelling by our cityflyer or northern lantau routes to across the bridge. you can experience the grand scenic views on the way, and then the beautiful scenery on lantau island and also the great facilities at the airport

    最直接參觀大法,莫過于乘搭城巴來往市區與機場及北大嶼山的路線,親身體驗個中感受和迷人的海景,更可以道欣賞北大嶼山的景色和新機場的英姿。
  15. Dismantle schemes to inner - install tower crane group of shunqiao square in ho chi minh city

    胡志明市廣場內置塔機群拆卸
分享友人