施壓程序 的英文怎麼說

中文拼音 [shīchéng]
施壓程序 英文
pressure schedule
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : 壓構詞成分。
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 施壓 : jemanden unter druck setzen
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐變應力場模擬模型理論,編制了高碾混凝土壩的三維有限元模擬計算,在中考慮了各種溫控措的數值模擬,包括:水管冷卻、冬季保溫、降低混凝土的澆築溫度、夏季混凝土表面噴水霧、工汛期壩頂面過水等。
  2. This thesis built the models computing the working frequency over - voltage " operation over - voltage for 220kv fugai transmission line, calculates and analyzes working frequency over - voltage " operation over - voltage using emtp program and provides reasonable protection measures for the transmission line. furthermore, regulations method, traveling wave method and striking distance method are used to study and compare lightning - enduring capabilities of different types of pole in power transmission lines aiming at the fact that the lightning strike switching rate of 220kv fugai line is higher

    本文分別建立了計算220kv復蓋線路的工頻電升高及操作過電的計算模型,利用emtp對220kv復蓋線路工頻電升高、投切空線過電、投切空變過電、單相故障過電進行計算分析,並提出合理的防護措
  3. The expressions of displacement fields of dorsal and frontal surface for two piles, row piles and group piles are derived. the solution taking into consideration the effect of construction sequence of jacked pile accords with the actual engineering

    該式考慮到了沉樁工順的影響,較各樁的簡單疊加更符合工實際情況,而且能夠簡化為不考慮工順的靜群樁擠土位移場的解答。
  4. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工、模板工、混凝土工、預應力工、移存梁工、孔道漿工、梁體封端工、橋面防水層和保護層工工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的工順和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力工質量的工技術;採用重物移運器有效移梁的工方法;漿、封端、橋面防水層和保護層工的一些規定和注意事項等都是對箱梁製造行之有效的工技術和工方法,並可為以後類似工作借鑒。
  5. In this article, based on theory of the rcm technology and exception - tree, the equipment - management programmer and the faulty category in dlpec ( dalian petro - chemistry corporation ) are discussed in details, and the equipment - management patterns for the enterprise are brought forward. for all kinds of equipments, some measurements on the maintaining and governing are established ; moreover, the system function mode structure is also schemed out, which responses the working situation of equipment in the enterprise in detail and is composed of equipment technology document - management, equipment document - management, equipment integrating - management, equipment maintaining - plan management, equipment stat. analysis management, integrating - query system etc ; at the same time, the whole system codes are devised, which include equipment category code, engineering planning sort code, spare part sort code, testing report catalogue code of pressure vessel pile, equipment stat

    本文以大連石化公司的設備管理和設備種類為研究對象,應用rcm的技術和故障樹原理,提出了具體的適合於該企業的設備管理模式;針對各種不同類型的設備,制訂出相應的維修管理對策;並運用信息系統分析與設計方法,設計出了比較詳細的、能真實反應企業設備工作狀態的系統功能模型結構,包括:設備技術文檔管理、設備檔案管理、設備綜合管理、設備維修計劃管理、設備統計分析管理、綜合查詢系統等;同時,設計出了比較完整的系統代碼,主要包括:設備類別編碼、工計劃分類編碼、備品備件類別編碼、力容器管道檢驗報告目錄編碼、設備統計類別編碼等;另外,對數據庫設計、輸入輸出設計、系統的實與測試等提出了比較具體的方案。
  6. The result of long - term operation shows that the computer control system is practical and effective, it can run in the optimal state within a long duration to fully realize data collection and process, remote data transmission and vfvs constant injection control of pumps. it speeds up the automatic procedures of the seawater treatment process, really realizes the unmanned working, decreases the physical intensity to a large extent, improves the management, enhances the management level, avoids equipment wear down as much as possible, makes the seawater treatment efficient and lessens the cost of production

    長期的運行結果表明,該計算機控制系統的實切實有效,既成功實現了對被檢測參數的數據採集與處理、遠傳以及注水泵機組的變頻調速恆注水控制,又提高了系統的自動化,真正實現了無人值班作業,在很大度上降低了工作人員的勞動強度,極大的改善了現場的管理狀況,提高了生產管理水平,且有效避免了設備損耗,提高了水處理效率,降低了生產成本。
  7. In this article, according to three - dimension finite element theory and heat conduction theory, the computation program of simulating thermal stress field of rcc arch dam during construction and service is researched and developed

    本文採用三維有限元法和熱傳導理論,研究開發了碾混凝土拱壩工期和運行期溫度應力場全過的模擬計算
  8. An interpolation program is used to convert the fluent result data to the ansys load data. it is a new method to analyze turbine tip clearance. in this paper, some research of the numerical computation of the tip clearance of aero - engine is done, the parametric method is used and the research on the flow, heat and structure integration analyses is accomplished

    本文對渦輪機匣氣熱固一體化分析方法做了研究,通過編制了載荷轉換與,從氣熱計算模型中提取溫度場計算結果,並作為載荷加入到熱固耦合計算模型中,實現了高渦輪機匣的一體化計算分析,為實現渦輪葉尖間隙的氣熱固一體化分析打下了基礎。
  9. Practice for qualification of a combination of squeeze tool, pipe and squeeze - off procedures to avoid long - term damage in polyethylene gas pipe

    為避免聚乙烯燃氣管長期受損採用的管擠工具和擠組合的合格鑒定實
  10. The secondly, based upon the laboratory soil tests, definite the parameter of the kondner model and the loess compaction model, using fortran power station to compile the finite element programmed of axial symmetry. through trial calculate with the different squeeze stress and different poisson ratio, got some laws of stress of soil surrounding pile and judged the result of compaction pile. the result of the calculation and analysis and valuable to designer and builder

    同時通過室內試驗確定了特定區域黃土的鄧肯-張模型參數和黃土擠密模型,採用fortranpowerstation ,按軸對稱問題編制了存限元,通過採用不同的擠力和不同的泊松比的試算,得到了一些樁周土體的應力變化規律,並對擠密樁破壞半徑內的土體擠密效果進行了判定,計算與分析結果可供設計工人員參考。
  11. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工樁的實驗室承載力監測方法與設備、如何使土方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導有積極、現實意義;提出了綜合運用朗肯土力理論、基坑空間和時間效應影響理論來分析逆作法工過中基坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基坑邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室土體的挖掘的方式和順,指出憑主觀臆斷與經驗來工是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及工順的不同,提出了節點處理技術;分析了逆作法工期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下混凝土墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  12. Not only t he self - weigh of every beam, the prestressing, the compression on the support of form scaffolding, constriction of concrete, creeping are considered when the inter nal force is calculated, but also the result of displacement and deviation of th esupport and precamber should be taken into consideration

    工階段的內力計算不僅考慮逐段工梁的自重,預加應力,模板支架的支點力,以及混凝土的收縮、徐變;同時還應考慮工中的支座位移、支座偏差和預拱度等的影響。
  13. Thirdly, imposing pressure load on the wetted surface is a hard job because the pressure value is various and there is no regularity to fellow especially when the model is large. so it ' s very important to find a feasible automated loading approach that can be used in the fem analysis of ship structure

    3 、由於向有限元模型力的時候,船體濕表面的力不盡相同,並且沒有規律可循,如果單元很多,那麼手工加載的效率就很低,本文開發了基於pcl的自動加載,提高了工作效率。
  14. In order to calculate the wall ' s lateral displacement, several diagrams have been cited from a f. e. m results. the main factors have been accounted in these diagrams as below : the wall stiffness, the strut stifmess, the width of pit, the elastic modulus of soil, the depth of the underlying hard layer, the strut preloads and the factors of safety against basal heave

    為了計算擋墻的側向變形,本文引用一個有限元計算得出的圖表結果。這些結果考慮到了以下主要因素:擋墻剛度、支撐剛度、基坑的開挖寬度、土體的變形模量、坑底以下硬土層的位置、給支撐加的預力的大小、抗隆起安全系數等。
  15. Using the program two and three - dimensional numerical simulation of wind flow around single or multiple buildings can be achieved and the detailed flow condition including wind velocities, pressures and time - average characteristics of turbulence can be obtained. in order to attain the required accuracy efficiently multi - layer local refinements can be carried out based on the initial division grid

    採用fortran語言編制,可實現二維和三維單體及群體建築的繞流風場的模擬計算,獲得建築繞流風速、表面風及湍流平均特性等數據;可通過對初始網格實多層次的網格局部加密,以使風場解達到最終的精度要求。
  16. This can be of significant benefit to cut down the cost and time limit for a project the program package gone with this paper may realizes the dynamic simulation for all of courses in hoisting, and may synchronously displays the axis force of derrick, the pull - force of the steel wire, obliquity of equipment and overloading instance

    這有利於工實踐中方案變更、工現場條件復雜多變等的方案驗算,節約成本和縮短工期。本論文為桅桿吊裝整個過實現了動態模擬,顯示桅桿軸向力、鋼絲繩拉力、設備傾角和起重超載提示,為安全吊裝設備提供重要的數據,有利於作業過的全監控。
  17. Upon author ' s long distance experience in producing aluminum easy open can, he had studied and researched deeply many kind of easy open cans in the worlds, analyzed the technique of key several production program of can making and solved a series of key technical problems during the process of light - weighting such as, aluminum raw material, can profile design, press technique and mould design etc. after carrying out light - weighting, the used aluminum raw material thickness of easy open can ' s body could be thinned from 0. 325mm to 0. 285mm, the weight of gram per can could be reduced from 13. 625g to 11. 948g, its economic benefit could be more big obviously

    本文在對國內外輕量化技術的應用現狀進行深入分析的基礎上,從技術層面對易拉罐輕量化實中的若干關鍵性問題進行了探討。通過對國內外各種罐型所進行的深入研究,從易拉罐製造過中關鍵工的工藝分析入手,解決了輕量化實中罐用材料、罐型設計、沖工藝、模具設計等一系列關鍵技術難題。輕量化技術成功實后,易拉罐罐體所用鋁材厚度從0 . 325mm減少到0 . 285mm ,單罐克重從13 . 625g降低到11 . 948g ,取得了明顯的經濟效益。
  18. Clarity of this sort bears directly on the security of an application

    正是這種清晰性對應用的安全性加了直接的力。
  19. Recommended practice for test procedures for high voltage direct current thyristor valves

    直流可控硅換流閥試驗的推薦實
  20. Firstly, the current testing localization in the detection of electric bow is analyzed and the new system ' s whole construction developed in this thesis is introduced ; in the 2rd chapter, the embedded 110v dc power supply is analyzed and constructed, and with experiments, some dissonant results such as the fluctuation of output pwm ( pulse width modulation ) pulses, the power noise added to output voltage, and the drop of output voltage have been analyzed and the problems have been broken down one by one ; in chapter 3, stepping motor ' s drive has been systematically dissertated, and combing stepping motor ' s subdivided drive technology, the author develops an intelligent mini - step driving circuit using a main - sub microprocessor structure, which is validated in the hybrid stepper based system ; in the 4th chapter, liquid crystal driving and displaying technology is specified in detail, with one sort of lcd modules ( tlm12864h ), the author develops an feasible circuit for the new testing system, designs a menu mode based program struc ture and brings here some programming codes using franklin c51 programming language ; in chapter 5, the above built system is used in the electric bow ' s practical detection, and the differentiating rate of this system is analyzed

    論文首先分析了目前機車受電弓檢修方式存在的局限並概述了本論文研製的受電弓測試系統的體系架構;第二章對系統內置110v直流控制電源進行了分析和設計,結合試驗對輸出pwm振蕩、輸出電源噪聲大、輸出電下跌等現象進行了分析並提出解決措;第三章論述了步進電機的驅動,結合步進電機微步驅動技術研製了基於上下位單片機組的混合式步進電機智能驅動電路,並在試驗中得以驗證;第四章詳述了液晶驅動及顯示技術,利用一款液晶顯示模塊tlm12864h研製出本系統用液晶顯示電路,設計了菜單式的結構並以franklinc51編方式給出部分子代碼;第五章則將以上構建的整個系統應用在機車受電弓的實測中,並對測試解析度進行了分析。
分享友人