施工地點 的英文怎麼說

中文拼音 [shīgōngdediǎn]
施工地點 英文
job location
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的質災害,它的整治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和質環境干擾小、期短、抗滑能力強的滑坡整治方法.風動潛孔錘鉆進是一種具有許多優的鉆進方法,它的許多特,如成孔質量高、應用范圍廣、無液體循環介質、鉆進規程參數小、可實現大直徑基巖鉆孔等都適合於抗滑樁.文章在介紹風動潛孔錘鉆進特的基礎上,根據抗滑樁要求,分析了風動潛孔錘用於抗滑樁的可行性,並舉出了其應用實例
  2. Upon notification by police about the case, staff of dh s port health office conducted routine disinsection for the patient and at areas and transport facilities used by the man as a preventive measure against infectious disease

    生署港口生處人員收到警方的報告后,為該名病人和他曾到過的及交通設,進行慣常的滅蟲作,以預防傳染病。
  3. The characteristics of high pressure gyratory sprayed pumping discusses is presented, which is applicable in wide range of scope and ground layers, convenient for construction, long durability, wide source of materials. mechanism for subgrade strengthening : complex foundation of cement solid and earth between piles was formed by pulsant load of flowing pressure and spraying flow, water wallop, cavitation phenomenon, water wedge effect, extrusion force and air flow agitation etc so as to enhance foundation bearing force and reduce settlement and deformation

    高壓旋噴注漿技術具有適用范圍、適用層較廣,方便,耐久性好,材料廣闊等特;其加固基機理主要是通過流動壓、噴射流的脈動負荷、水塊的沖擊力、空穴現象、水楔效應、擠壓力、氣流攪動等效應形成水泥固結體與樁間土的復合基,從而提高基承載力,減少沉降變形。
  4. Circuitry construction tools produced by our company are more than eight hundred of kinds in 18 series, which are suitable for foundation construction, tower group sets up the pole 、 a thread constructs 、 cable construction, optical cable construction, such as entangle and rub flexibly 、 insulating aerial cable and cable skinning device 、 aluminiam alloy cherishes the pole 、 and lead 、 card thread device of ground wire 、 high strength shackle 、 ratchet wheel board hands with sharp board hands 、 tight line device of double hook 、 lifting block 、 nylon wheel and aluminium wheel is pat the thread coaster, and etc, with full series and more kinds. as high technology and reliable quality, we have a good reputation among sane fields at home and abroad

    公司生產的線路機具包括用於基礎,桿塔組立、架線、電纜,光纜序的18大類800餘種產品,如機動絞磨、絕緣架空電纜及高壓電纜剝皮器,各類鋁合金抱桿,以及導、線卡線器、高強度卸扣、棘輪扳手與尖扳手、雙鉤緊線器、起重滑車、尼龍輪或鋁輪放線滑車等,系列全、品種多,產品具有藝精湛,質量可靠等特,在國內外同行業中有較高的信譽。
  5. Due to the job location of underground engineering in city are mostly stand in the centre of city, especially these large city in which the landform are complicated, the population are numerous and surrounding buildings are dense, which make the construction more difficult and the earthquake effect by blast may endanger the safety of surrounding environment in projects

    由於城市施工地點多在城市中心帶,特別是一些大城市的中心區,形復雜,人口眾多,周圍建(構)築物密集,在實際的爆破程中,使得難度增大,爆破產生的震效應可能危及周邊環境的安全。
  6. The place for effective action is the job site.

    採取有效措就是作場所。
  7. As the amount of municipal solid waste has been on an increasing trend over the past years, the epd announced that after a comprehensive site selection exercise, tsang tsui in tuen mun and shek kwu chau were identified as potential sites for developing the integrated waste management facilities ( iwmf ) which would adopt state - of - art incineration as the core technology to reduce the volume of municipal solid waste

    環保署經過全面的選址作后,宣布揀選了屯門曾咀及石鼓洲,為可供考慮興建綜合廢物管理設,綜合廢物管理設將以先進焚化為核心技術,大幅減少都市固體廢物的體積。
  8. To upgrade and improve tourist facilities and attractions, the tourism commission has introduced a district enhancement scheme in the central and western district, focusing on areas frequented by tourists like lan kwai fong, the central mid - level escalator and hollywood road

    旅遊事務署已在區內進行區改善計劃,致力提升及改善中環及西區的旅遊設及景施工地點尤其集中於改善遊客眾多的蘭桂坊、半山行人電梯及荷李活道等游覽
  9. Wastewater lifting plants for buildings and sites - principles of construction and testing - lifting plants for faecal - free wastewater

    建築物和施工地點的廢水處境設備.和試驗規則.糞便廢水的處境設備
  10. However, the workers from the china railway 16th group co ltd, entered the work site ahead of schedule at 8 : 40 pm on wednesday

    然而據辦公室消息,中鐵16局的人計劃提前,于周三晚八四十分進入施工地點
  11. Wastewater lifting plants for buildings and sites - principles of construction and testing - lifting plants for wastewater containing faecal matter for limited applications

    建築物和施工地點的廢水處境設備.和試驗規則.限用的含糞便廢物的廢水的處境設備
  12. For the project " reclamation works in north tsing yi ", some of the contaminants found within the site are classified as carcinogenic, eg. some heavy metals, pah and polychlorinated biphenyl ( pcb )

    至於「北青衣區填海程」 ,在施工地點發現的污染物中有一些可被歸類為致癌物質,例如一些重金屬,多環芳香族碳氫化合物及多氯聯苯。
  13. During the construction of concrete cut - off wall of the auxiliary dam in huangbizhuang reservoir, in the section with complex geographical condition, especially the closure section of concrete cut - off wall ( about 120m ), the deterioration of the underground water ' s flow state and the existence of the overseep channel in the stratum result in the several collapses in the dam crest. through the analysis of ever } 1 collapse ' s reason, the proposal of handling measure and its effect, the paper expounds and proves that the cut - off wall can be safely constructed and devoted into normal usage after dealing with collapse. the psper improves the construction technique and method of concrete cut - off wall especially under complex geological condition and in the overseep stratum

    本文通過對歷次塌坑的原因分析及歷次塌坑處理措的提出和對歷次塌坑處理效果的分析,論證了塌坑處理後防滲墻能安全和投入正常運用;完善了在復雜質條件及強滲漏層混凝土防滲墻的藝和方法;提出了對病險水庫加固及在質條件復雜層中修建混凝土防滲墻的;同時提出了在強滲漏層修建防滲墻的關鍵是在防滲墻前通過預注漿封閉強滲漏通道的重要論;對塌坑一些處理措中的不足之處亦進行了分析研究,供國內類似程借鑒。
  14. This paper describes the design and construction of the demolishing scheme of the high - piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast

    介紹高樁梁板碼頭拆除方案的設計及,重分析巖質海岸質條件下預制樁的拆除方案。
  15. In combination with the engineering practice, the construction characteristics, working principle, construction technique and quality control of plastic drain for soft soil subgrade ' s treatment are introduced

    摘要結合程實際,介紹塑料排水板處理軟土、作用原理、藝、質量控制。
  16. The structure, design and construction of underpass bridges are fully discussed in the thesis

    本文較全面討論了道橋結構的構造、設計和
  17. Abstract : main construction points of qingfang hospital station on qingdao subway under the condition of hard surrounding rock are described. blasting control and vibration monitoring are stressedly introduced

    文摘:闡述了青島下鐵道青紡醫院車站在堅硬巖層中的,重介紹了爆破控制、震動監測等內容,對于城市硬質巖石條件下的程具有借鑒意義。
  18. 3 the permit holder shall deposit with the director 3 sets of 1 to 1000 scale layout drawings showing the works boundaries, drainage channel, ancillary road alignments and any other facilities assessed in the eia report ; the locations of environmental mitigation measures recommended in the eia report ; and an explanatory statement

    許可證持有人須向署長存放下列文件,計有: 3套1 : 1000比例的設計規劃圖則,顯示程界線、排水道、附屬道路的路線及環評報告所評估的任何其他設;環評報告所建議的環境緩解措;以及一份解釋說明。
  19. Advantages and construction main points of low temperature and hot water floor radiation heating

    低溫熱水板輻射供暖的優
  20. Abstract : taking the earth retaining engineering in nan guang road, yibin city as an example, the authors discuss the design method and construction essential in the treatment of earth filled slope using pile - archor retaining wall to stablize the slope and make full use of land

    文摘:以宜賓市南廣路擋土墻程為例,介紹了填方邊坡處理時用樁錨擋土墻進行支擋,以便充分利用土的設計思路和
分享友人