施工 的英文怎麼說

中文拼音 [shīgōng]
施工 英文
be in the process of construction; be under construction; build; construction
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. Facing the new environment of wto, how to participate in the aboil competion market and how to use the scientific theory and technique to bid as a chinese construction enterprise is a very important and exigent research subject

    面對加入wto的新環境,我國施工企業如何積極參與市場競爭、依據科學的理論與方法進行程投標,是一項非常迫切和重要的研究課題。
  2. Abutting technology for horizontal directional well of js6 and js

    5水平定向井連通施工
  3. Directional abutting technique of salt wells

    鹽井定向對接連通施工
  4. Factors influencing early physiological acclimatization of the construction workers re - entering plateau after winter vacation

    再入高原施工人群早期生理習服的影響因素
  5. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測作的前期實驗作和施工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  6. Based on the cause of refracturing failure, operation scale improvement and adjusted treatments are adopted, such as acid washing fracture, multi - fracture fracturing and new fracture fracturing

    根據裂縫失效的原因,確定了增大施工規模、酸洗裂縫以及多裂縫、開新縫壓裂等項改造措
  7. Tbm roadway ripping machine used in adit construction

    巖巷掘進機在平峒施工中的運用
  8. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措等方面進行了探索、研究。
  9. Construction site. no admittance.

    施工重地,閑人免進。
  10. Admixtures should be avoided, particularly those that are added on site.

    應當盡量避免使用摻和料,特別是避免使用須在施工現場摻加的摻合劑。
  11. Wherever possible, admixtures should be avoided, particularly those that are added on site.

    在可能的情況下,應當盡量避免使用摻加料,特別是避免使用須在施工現場摻加的摻合劑。
  12. Pressure - bearing capacity of spread foundation with reinforced aeolian sand

    南京地鐵軟流塑地層淺埋暗挖法施工技術的探討
  13. To reconstruct aerodrome network in datong

    大同機場施工控制網改建
  14. Segmental construction contributes toward aesthetically pleasing structures in many different sites.

    對于許多不同的現場條件,分段施工都能提供美觀,頗有魄力的橋型結構。
  15. Code for construction and acceptance of civil air defence works

    人防施工及驗收規范
  16. Main products : filters and filter elements for air engine oil and fuel filtering. used in automobiles. tractors. powerful diesel engines. construction machines. and oil tankers etc

    主要產品:汽車、拖拉機、大馬力柴油機、施工機械、重油船用柴油機用的空氣、機油、燃油三大系列的濾清器、濾芯。
  17. The local directional drilling is just staring in terrane, the equipments and the technologies ca n ' t satisfy far and far the spot construction needs, according to current circumstance and considing the existed equipments, the author put forward drilling by air hammer in terrane, having designed compounded - drilling tools, and recommended technology parameters. producing experiments have obtained good achievements in economic and in techniques

    國內定向鉆進鋪管技術在巖層只是剛剛起步,設備、藝遠遠不能滿足現場施工需要,本文針對國內、外巖層定向鉆進非開挖設備及藝現狀,結合國內大多施工單位的已有設備,提出巖層空氣潛孔錘導向鉆進法,設計了適合巖層鉆進的實用鉆具,並提出具有針對性的藝參數,生產性試驗取得了良好的經濟技術指標。
  18. The company has the professional qualifications of the construction, rich experience and expertise in project construction team, in shenzhen and neighboring had completed a number of major projects, such as : state - building in shenzhen, the shenzhen productivity technology park building, dongguan step by step, the china everbright bank, shenzhen city communist party, china enrolling, urban forests, turtle mountain lodge, alpine garden, quieting habitat ho side, garden city, wonderlang, the bay holds garden, studded day at ocean shores, etc. glass insulation, energy, explosion - proof security to indulge their works

    本公司具有專業的施工資歷、豐富的程經驗及專業的施工隊伍,在深圳及周邊曾完成多項大型程,如:深圳國通大廈、深圳科技園生產力大廈、東莞步步高、光大銀行大廈、深圳市委黨校、中國移動營業廳、城市山林、龜山別墅、高山花園、豪方悠然居、花園城、四季花城、灣畔花園、漾日灣畔等等玻璃隔熱、節能、安全防爆貼膜程。
  19. On the base of systematic background analysis, this thesis points it out that construction ' s total contract pattern will be amain contract - pattern of domestic building - market as before

    本論文在系統的背景分析基礎上,指出施工總承包模式依然是國內建築市場主要的承發包模式。
  20. It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months

    樂灘電站從2001年10月底開始施工準備到2004年12月20日首臺機組投產發電,僅用38個月的時間,比合理期提前了7個月,並在此期間,搶回因廠壩部份地基巖溶地質問題延誤的5個月期。
分享友人