施工工作 的英文怎麼說

中文拼音 [shīgōnggōngzuò]
施工工作 英文
construction operation
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其藝,並指出了橋梁控制的重要性之後,簡要的介紹了程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋控制與監測的前期實驗況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. Construction operation specification for bricklaying engineering

    砌築規程
  3. The operation rules for construction of household anerobie digesters

    戶用沼氣池規程
  4. Execution of special geotechnical works - gabion structures - part 1 : structures on land

    特定土的實.石壟結構.第1部分:岸上結構
  5. Regarding person as basis, cctc has kept holding investment in various entertainment facilites for staff memder and gathering them up into touring activities thus substantiating their sparetime and culture and improving their working conditions so as to brihg personnel resource into full play

    公司秉承以人為本之宗旨,不斷斥資興建各種娛樂設和組織員集體旅遊,充實員業余文化生活,改善員環境,務求令巨大之人力資源發揮最優潛能。
  6. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試;試驗數據表明樁側摩阻和支盤端阻起很重要的用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  7. The work of mercy was interrupted by the appearance of u-boat and the british ships were compelled to withdraw.

    由於一艘德國潛艇的出現而告中止,英國艦支不得不離去。
  8. Features of work stresses on female employees and some measures to reduce them

    企業女性員壓力特點及減壓措探討
  9. This paper introduces the basic structure, system composition, applicable condition, main parameters and construction procedure of the first walking underwater bed leveling machine in china, and describes the construction quality and efficiency of bed leveling in yangtze estuary deepwater channel regulation project

    摘要簡要介紹我國第一臺步履式水下基床整平機的基本結構、系統組成、適用條件、主要技術參數和藝,並對其在長江口深水航道治理過程中進行基床整平的實際質量和了說明。
  10. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了效,減少了倉面污染;模板程大量採用定型鋼模板技術,提高了壩體混凝土成型質量和程進度;在二期混凝土區域,為免除人鑿毛勞動強度,採用永久性免拆金屬模板網為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期程持續高強度混凝土系統程的研究,使三峽程成為名符其實的「世界一流程」成為可能;三峽二期程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  11. It is very difficult to construct prestress anchored bar in the area near sea that contains many highly confined aquifers

    介紹了錨桿的構造、用機理、藝以及決定錨桿質量的關鍵技術。
  12. Nowadays, the machining center carries through the precision inspection only following the fixed coordinates " axes, which can not completely reflects the real error of the spacial position of the practical machining outside the axes and leads to having no the directive relation between the inspected precision and the practical machining precision. so, this paper introduces that the error factors of influencing workpiece ' s outline on machining and carries out the solid inspection of every spot ' s error inside the workaround on the horizontal machining center

    本文針對當前加中心僅沿固定的坐標軸線進行精度(含幾何精度和定位精度)檢驗,並不完全反映軸線外實際加的空間位置真實誤差,導致檢出精度與機床實際加精度無直接對應關系的現狀,論述了加時影響件型面輪廓精度之加中心的誤差因素,對加中心實區內各點誤差的立體檢測。
  13. Based on the description on the construction technology of the continuous flight auger ( cfa ) pile, the quality advantage, material requirement, construction condition of the pile is introduced, and then the causation of the quality defect and its control measure are presented herein ; from which the processes of both the construction and the quality control are analyzed as well

    摘要基於對長螺旋鉆孔混凝土壓注樁藝的論述,介紹了該類型樁的質量優點、材料要求、業條件以及常見質量缺陷的原因及控制措,對其及質量控制過程進行了分析。
  14. And the author also put forward several proposals about top down construction in the paper, as well as summarized and advanced the developing trend of top down construction and the problems which should be made gret efflorts to solve

    文章最後結合具體程實踐,對逆藝的具體應用進行了介紹,詳細說明了逆法的效果。文章還總結並提出了逆法在我國的發展趨勢及應努力解決的問題。
  15. Participate in the mechanical equipments ' small modification and execute related works

    參與廠小型的技改項目機械設備部分的施工工作
  16. The actual list will depend on the statutory regulations where the work is being carried out

    實際人員名單將根據施工工作現場的法規而定。
  17. Performs construction works relating to all plant system, instrumentation control and apparatus

    完成和整個廠的儀表控制和儀器有關的施工工作
  18. 427 to maintain the best quality of the construction work is the important responsibility of the field controllers

    保持施工工作的優良質量是現場管理人員的重要職責。
  19. Since 1998 he took over the job of an erection engineer and manages service works at sites in germany, europe and overseas

    自1998年以來,他以安裝技師的身份照管著國內外多處的安裝施工工作。 。
  20. The writer has been engaged in bridge design and construction for some years and doing attempting studies in mechanical characters of long span curved box - girder bridges in construction phase

    本人從事橋梁施工工作多年,在實際中逐漸摸索,對大跨度曲線箱梁橋階段的力學特徵進行了一些嘗試性的研究並得出了一些用以指導程實踐的結論。
分享友人