施工工地 的英文怎麼說

中文拼音 [shīgōnggōngde]
施工工地 英文
construction site
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Construction site. no admittance.

    ,閑人免進。
  2. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;下水對樁承載力的影響程度;各種外部因素影響下,樁的藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  3. The application technologies of gcrap are studied systemically. it includes characteristics of gcr, gradation design, compacted technology and anti - ice or - snow performance

    本項目針對橡膠顆粒路面的應用技術開展了系統研究。提出了橡膠顆粒技術標準、橡膠顆粒瀝青混合料組成設計方法、成型藝、藝及其除冰雪性能。
  4. Manufactures rubber - lined fire hose and fire extinguisher. includes product specifications and pictures

    -從事煤炭開采電力機械製造產化建材和商貿等產業。
  5. In this paper, research is emphasized on the situation of slope protection in shaanxi areas, analyses the engineering and economic effect of all kinds of slope protection, compare the traditional protection with the new, puts forward the protection principle that should be followed in shaanxi areas, study the destruction mechanism and stability analysis of high slope in ocher area, and puts forward effected and economic new protection methods

    本文對陜西區的邊坡防護狀況進行了研究,分析各種防護型式的防護效果及其經濟效益,並結合國內外的防護新技術,對傳統防護型式和新型防護型式進行了對比分析,提出陜西區在以後的防護程中應該遵循的原則,並研究了黃土高邊坡的破壞機理和穩定性判斷的方法,提出巖土邊坡有效、經濟的新型防護措及其藝。
  6. Responsible for finding out errors or criminal facts and giving punishment accordingly as for public water supply facility and the user of city water supply devices, peccancy water consumption by the construction site and water waste

    五負責對城市規劃區內使用的公共供水設和城市自備水供水設的用水單位,施工工地的違章用水浪費用水及相關用水手續進行現場查處。
  7. The function design of system includes writing down amendment and pretreatment about spatial database and attribute database. this system provides common and basic functions of gis. besides, we can make out the topographical maps, planimetric maps and skiagraph, structure objects of highway construction of design and can inquire two - way between spatial information and attribute information

    系統功能設計包括空間數據庫和屬性數據庫的錄入、修改以及預處理;系統還提供了一般gis系統應具備的基本功能,並在此基礎上進行涵蓋公路設計形圖、平縱縮圖、構造物等圖形信息與屬性信息的雙向查詢,並運用掙值法等對相關屬性進行分類統計以供有關公路程項目的各方使用。
  8. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  9. Among them, working procedure optimization of construction of passing water gap in flood season in the same construction can be spread ; utilization of experience that lime dusts are mixed with macadam to satisfy winner construction, difficult problem of short construction stage in the cold area can be solved, this experience has the popular adaptability

    其中度汛期過水缺口部位序的優化在同類程中具有推廣價值;利用碎石摻加石粉料滿足冬季的經驗解決了寒冷期短的難題,該經驗具有普遍的適應性。
  10. Construction techniques and quality control in consolidation of soft foundation using concrete mortar sprayed piles

    水泥粉噴樁加固軟土基的藝與質量控制
  11. This includes the consolidation principle, the scope of application, design method, construction technique, quality control and so on. secondly, how to select and estimate a scheme of foundation consolidation are also discussed. the technique characteristic of dynamic consolidation method and deep mixing method are analyzed in the paper

    本文首先對強夯法和深層攪拌法的技術特點和加固機理進行論述,充分闡述兩種加固方法的加固機理、使用范圍、設計方法、藝和質量控制等;接著論述基加固方案的選擇和評價方法,並分析強夯法和深層攪拌加固技術的技術特點,為程選用合適的基加固方案奠定基礎。
  12. The primary purpose of this paper is that gives a particular explanation of the work principle and construction technique for the dynamic consolidation method and ddm. it also provides the evaluating schemes for foundation consolidation. so we can get some useful methods for foundation consolidation in civil engineering

    文章的最終研究目標是詳細說明強夯法和深層攪拌樁加固技術的作機理及藝方法,並提出相應的基加固評價選用方法,從而為程建設中進行基處理提供方法和依據。
  13. Article 57 in the case of temporary using state - owned land or land owned by peasant collectives by construction projects or geological survey teams, approval should be obtained from the land administrative departments of local people ' s governments at and above the county level

    第五十七條建設項目質勘查需要臨時使用國有土或者農民集體所有的土的,由縣級以上人民政府土行政主管部門批準。
  14. In accordance with the construction of xi ' ning - huangyuan first class highway and machangyuan - ping ' an high - speed highway, based on a good deal of investigation, this paper studies the geologic character and the main physical mechanics of the collapsibility loess in qinghai. this paper also studies the foundation treatment effect with dynamic consolidation, impact rolling, lime pile and lime - soil cushion. to dynamic consolidation, much attention is given to the relationship between the ramming energy and the effective depth

    本文結合西湟一級公路、馬平高速公路建設,對青海區濕陷性黃土進行了大量勘探調查,總結研究了青海區濕陷性黃土的質結構特點、主要的物理力學性質及其規律;並通過現場試驗,系統研究了強夯、沖擊碾壓、灰土擠密樁和灰土換填等基處理方法的藝及處理效果。
  15. The causes and countermeasures to damage of under - ground pipeline in the engineering construction

    下管線的損壞原因及控制措
  16. Code of practice for distribution of electricity on construction and building sites

    建築與施工工地配電實用規程
  17. Safety of power transformers, power supply units and similar devices - part 2 - 23 : particular requirements for transformers for construction sites

    功率變壓器電源設備及類似裝置的安全性.第2 - 23部分;施工工地用變壓器的特殊要求
  18. The supervisor should spend half a day visiting several construction sites within the contract accompanied by the contractor ' s environmental auditor

    監督者應該在承包商環境審計師的陪同下用半天時間視察其合同段的部分施工工地
  19. Through flat experiment and circle experiment, we research the causes of cracks before hardening of concrete and after. through ingredient experiment, we research the influence of shrinkage from some ingredient ( coal ash, crushed stones and fiber ). in addition, we test some methods of construction to strengthen the anti - crack capacity of r. c. slab in building sites

    通過平板試驗和圓環試驗,研究了混凝土在終凝前和終凝后裂縫的各種影響因素;通過摻合料試驗,研究混凝土的一些摻合料(粉煤灰、碎石和纖維)對其收縮變形的影響;另外,還在施工工地進行一些增強樓板抗裂能力的構造措試驗。
  20. Responsible for jinan two water supply management and provide to public water supply facility and city that urban planning use in the district for oneself water supply water of the water unit of the facility of city, violating the regulations water, waste water and relevant to carry on with sailor scene investigate and prosecute continuously of construction site

    負責濟南市的二次供水管理作以及對城市規劃區內使用的公共供水設和城市自備水供水設的用水單位,施工工地的違章用水浪費用水及相關用水手續進行現場查處。
分享友人