施工時間標準 的英文怎麼說

中文拼音 [shīgōngshíjiānbiāozhǔn]
施工時間標準 英文
engineered performance standard
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  • 標準 : (衡量事物的準則; 榜樣; 規范) standard; criterion; benchmark; pip; rule; ètalon (衡器); merits
  1. By means of laboratory and field experimentation of typical semi - rigid base materials, the relationships among laboratory experimental values, field maintain values, field core values and construction criteria are put forward. and the relationships between different test methods are established. using time - temperature conversion principle, it processes the intensity assessment of field cores, then offers the method of determining the test deflection of pavement surface

    通過典型半剛性基層材料的室內外試驗,研究主要設計參數的室內試驗值、野外養生值、現場取芯值及的關系,建立了不同試驗方法的相關關系,運用溫換演算法則,對現場芯樣進行強度評定,並提出了路表彎沉檢測的確定方法。
  2. And these measure are : first stringing then management of work - effect, reducing the rate of fixed salary, combining prize distribution with the work - effect ; second system of standard work - hour that carried out on workers who work in product ion, technical staff setting up technical key task subject, enlarging risk mortgage on managers, year salary for managers ; third floating salary for worker, establishing special training prize fund, flexible management of work - hour, establishing such encouraging system as worker ' s holiday with salary

    在分配機制上降低固定資的比重,獎金分配與效益直接掛鉤;第二,在考核制度上,在加大對各部門總體經濟指的考核力度的同,對職個人的績效考核力度也逐步加大;第三,在激勵手段上,一線職實行考核制度,技術人員設立技術攻關課題,加大管理人員風險抵押,經營者試行年薪制,職崗位資浮動管理,設立專項培訓獎勵基金,作息彈性管理,建立職帶薪休假制度等具體激勵措
  3. By studying on different operation mode and different interval flood of longyangxia reservoir, as well as the flood propagation time, pre - alarm scheme is established, which can alarm in order to lower construction losses when flood is in excess of standard

    通過研究龍羊峽水庫的不同運行方式和不同頻率的區洪水,以及水量傳播的研究,得出預警方案,當發生超洪水,提前報警使損失降低到最小。
  4. Shkp was the first with a special team to thoroughly check the quality of units before buyers take possession. it also gives buyers ten full days to inspect their new units and report any defects. the developer follows up on reported defects as soon as possible, and this has earned many letters of praise from owners

    新地首創跨部門交樓小組,由專人為單位內所有設備及質素厘訂嚴謹的交樓,又提供業內特長的10天驗樓期,讓業主有充裕驗查單位及提交執漏要求,並以最快完成程,因而經常接獲大量業主的贊揚信。
  5. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在洪水設計選擇,應處理好安全、經濟和風險相互之的關系,以達到三者有機的統一;在梯級開發河流上應實洪水控制到洪水管理的觀念轉移;高壩大庫程的初期、中期、後期三個段的洪水設計應根據庫容等指逐步抬高。
  6. Through measuring slope forms on the spot, serried sampling, physical and chemical analyzing, and measuring soil erosion from natural and artificial rainfalls, the project researched in the approaches and behaviors of soil erosion affecting contents of soil carbon and nutrient, and the law of soil carbon and nutrient distributing in micro - topographty under influences of soil erosion. in the same time, supported by geographic information system, models of soil carbon and nutrient changing with soil erosion have been built, and spatial processes of soil erosion affecting soil carbon and nutrient have been simulated, and annual and long - term changing of soil carbon and nutrient under impact of soil erosion have been estimated and forecasted, and synchronously, a elementary assessment for different soil erosion management has b een performed by using the models built in the study

    本研究以三峽庫區秭歸縣水田壩鄉王家橋小流域四個徑流試驗區二十個小區為研究對象,通過坡形實地測量、坡面密集采樣的顆粒分析和養分含量分析以及人模擬降雨實驗,研究了土壤侵蝕對土壤碳和養分的影響途徑和表現,侵蝕作用影響下土壤碳和養分在微地形空的分佈規律;同,在地理信息系統的支持下,建立了侵蝕條件下的土壤碳和養分變化模型,模擬了侵蝕對土壤碳和養分影響的空過程,預測了侵蝕影響下土壤碳和養分的年變化及多年變化,並通過研究建立的模型對不同侵蝕控制措進行了初步的效益評價。
  7. Based on setting up the fire safety goals, performance criterion, fire scenario and uncertainty factor, this article simulated the occupants ’ evacuation time, smoke spread, radiation flow etc and determined fire detector and automatic extinguishing device by using the developed engineering method. and so these buildings ’ fire safety goals, which have the equivalent safety level with the existing national standard, can be achieved and those problems, which caused by some incompliment requirements or the existing codes not adapting to the practical need, can be solved

    針對這類建築存在的典型問題,通過設定消防安全目、確定性能判據、建立火災場景,考慮不確定因素,運用已開發的程學方法對人員安全疏散、煙氣蔓延、輻射熱通量等進行模擬計算,對火災探測和自動滅火設進行分析選擇,認為大型書城建築採用至少與現行國家的規定等效的方法來實現建築物的消防安全目,能夠解決現行與實際需要不相適應或某些不完善的規定所帶來的問題。
  8. Owing to reinforcing steel bar is expressed to adopt indirect method in " plane method " construction drawing, whole information of reinforcing steel bar can be confirmed according to the label information and combining criterion construction drawing while statistics engineering quantity

    由於在「平法」圖中採用接的方法表達鋼筋,因此統計鋼筋程量必須根據平面中的注信息並結合構造詳圖才能確定鋼筋的完整信息。
  9. Owing to reinforcing steel bar is expressed by adopting indirect method in " plane method " construction drawing, whole information of reinforcing steel bar can be confirmed according to the label information and combining criterion construction drawing while statistics engineering quantity

    由於在「平法「圖中採用接的方法表示鋼筋,因此統計鋼筋程量必須根據平面圖中的注信息並結合構造詳圖才能確定鋼筋的完整信息。
  10. Abstract : based on the results of hydraulic model test and remote - control ship model, the unsteady flow characteristics in the downstream approach channel and the reaches from three gorges project to gezhouba project and navigation conditions in these reaches during the tgp flood - discharge are analyzed. the measures of raising navigation discharge level and improving navigation conditions are given

    文摘:根據水模型試驗成果,分析了三峽程泄洪壩下游引航道和兩壩河段(三峽至葛洲壩)的非恆定波流運動特性,結合遙控自航船模試驗對兩壩的通航水流條件進行了分析評價,並提出了提高通航流量、改善通航條件的相應措
  11. Through the use of off - site fabricated steel members and slip - form construction for concrete core walls, the construction time was considerably shortened, the standard of workmanship controlled and the use of timber formwork eliminated

    使用預制鋼鐵組件及可移動板模興建混凝土主墻,可顯著縮短,加強控制及減少使用木材板模。
  12. ( 4 ) the thesis converts unrest model ( arima model ) of time series to the rest model ( arma model ) of time series. it sets up models acrossing some procedures, such as model identify, factor estimation, model check, ect, then predict the development short - term warp of road foundation. it predicts the time of the filling soil of the next grade utilizing the growth theory of the strength of the road foundation, assures that the working organization and design go smoothly during the filling work of road foundation and saves time and money

    ( 4 )從路基實測變形數據出發,將序列非平穩性模型( arima模型)轉化成序列平穩模型( arma模型) ,通過模型識別、參數估計、模型驗證等步驟來建立模型,從而進行路基動態變形預測,利用路基變形的控制對路基下一級填土的進行預測,優化了組織設計,節省了和資金。
  13. Based on this, how to develop geospatial metadata standard with object - oriented method is presented the approaches are designed in detail, and the method to develop metadata standard for geospatial information of water resources is applied

    並以此為指導,實了《水利地理空信息元數據》的研製,有效解決了研製地理空信息元數據在分合作、進度控制和所開發在兼容性、重用性等方面存在的問題。
  14. The rational depth of single layer, method of compaction, standard of compaction is provided. construction mechanic is summed up to keep the quality of sub - grade

    針對高填方回填土的沉降量與的關系,找出合理單層厚度、壓實方法、壓實,總結藝,保證路基質量。
  15. As water and electricity engineering reconnaissance has the characters of long period of prophase work, many reconnaissance data, heavy information, complex technology. in addition, its criterion and standard is still being improved and perfected. implementing engineering construction infomationization is the base of scientizing and modernizing the engineering construction

    由於水電程勘測作具有前期長、勘測資料多、信息量大、技術問題復雜等特殊性,另外,水電程勘測的規程規范和尚在不斷的改進和完善,因此實現信息化是實現科學化和現代化的基礎。
分享友人