施工步驟 的英文怎麼說

中文拼音 [shīgōngzhòu]
施工步驟 英文
construction procedure; construction steps
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (步度; 腳步) pace; step 2 (階段) stage; step 3 (地步; 境地) condition; situation; st...
  • : Ⅰ動詞(快走) (of a horse) trot Ⅱ形容詞(急速) rapid; swift Ⅲ副詞(突然; 忽然) suddenly; abruptly
  • 施工 : be in the process of construction; be under construction; build; construction
  • 步驟 : step; move; procedure; measure
  1. By way of implementing division system of appraising and employing for job title, it mobilized enthusiasm of personnel, promoted talents showing themselves, established primarily an income distribution system suitable for characteristics of different - type enterprises and broke the equalitarian distribution mode

    提出加強組織領導,營造改革良好環境和氛圍;確立以崗位管理為核心的聘用制改革新機制;分按階段穩和做好與聘用制相關的綜合配套改革作。
  2. Using the least squares method to modulate the inclined cable forces both in forward analysis stage and backward analysis stage, the tensile inclined cable forces during construction will be get finally

    最後採用最小二乘法對正裝和倒拆兩個中得到的索力進行修正,得到中的斜拉索的張拉索力。
  3. On the view of customization theory, the method of information processing for customization is summarized : quality function development and product function architecture, then the need function development ( nfd ) as the design way of implementing sub - system of customization information dealing is proposed based on them. the configuration include three parts : transmission function, need function and developing function. the adapting four steps for implementing are proposed : the collection and classification stage of customization information, the analysis stage of customization information, matching stage and evaluating stage for producing

    尤其是從mc個性化理論出發,總結前人個性化信息處理方法:質量功能配置法和產品族構建法的基礎上,提出基於樹形的兩極需求功能配置法的框架:傳導函數、需求函西安理大學碩士學位論文數、配置函數,作為個性化信息處理子系統的設計思路,並詳細闡明了該方法的四個實:個性化信息收集和分類階段、個性化需求分析階段、個性化需求信息配置階段、可製造性評價階段,指明了各個階段的方法在個性化信息處理子系統中的應用,為個性化信息處理于系統的實現奠定了基礎。
  4. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿肋梁支護結構」的發展、應用和優缺點;第二章分析其支護機理、結構特點,並與土釘墻和無嵌入排樁多錨支護進行了結構受力對比分析;第三章介紹該支護結構的設計計算方法,詳細介紹了支護結構各部分的設計方法;第四章介紹預應力錨桿肋梁支護系統最重要的兩個部分:帷幕和錨桿的技術;第五章介紹了不同土層不同深度的有代表性的三個基坑程實例。
  5. The d - s rule of the information fusion of rockmass mechanical parameters is presented. meanwhile, the basic probability assignments, belief functions, plausibility functions, and similar probability functions are given. this method is applied to an example of analysis and selection for rockmass mechanical parameters of the rock engineering, and the satisfactory results are obtained

    構造了巖體力學參數的識別框架,建立了巖體力學參數的基本可信度分配的應用模型,定義了巖體力學參數的信度函數、似真度函數、以及類概率函數,提出了巖體力學參數的d - s信息融合法則,明確了巖體力學參數d - s信息融合方武漢理大學博士學位論文法的實
  6. In this model, the peak of flood, flood total outflow and flood process are to be considered. a calculation program with monte - carlo method and a simplified method for calculating diversion risk are suggested

    在該模型中,可考慮水文中的洪峰流量、洪水總量和洪水過程的不確定性及水力的不確定性,提出了用monte - carlo方法計算導流風險的和用近似法計算導流風險的方法。
  7. During the construction of the water pile, every key step needs floating crane. compared with cable crane, the floating crane has the characteristics of low cost, large lifting capacity, easy assembling and operating. it is a good method and can be spread and used in the deep - water construction

    在水中橋墩的過程中,每個關鍵都需要浮吊作業,有了浮吊,無需纜索吊,就完成了,而且浮吊造價低、操作靈活、拼裝簡易、起重量大,在深水作業中,是一種值得推廣和使用的好方法。
  8. The computing model is optimized according to the model board trolley installation form and the concrete pouring process

    根據現場測量時模板臺車的結構安裝形式和混凝土澆注的施工步驟,反復修整完善計算模型。
  9. Furthermore it expounded the key products to be developed in priority and the key work to do - the structure adjustment centering on the adjustment of organization structure, technology structure, and product structure. then the paper put forward some countermeasures, methods and operation steps to realize these goals and plans

    論述了發展遼寧裝備製造業的重點作:即以產品結構、組織結構、技術結構的調整為主要內容的結構調整,同時,確定了應該優先發展的重點產品,提出了要實現這些目標、規劃所必需的對策、措以及實
  10. Because the design of unit structure follows the construction and control process, the operation sequence of iabs 2000 is consistent with the construction steps

    系統流程結構的規劃設計由於是面向鋼管混凝土拱橋的過程以及控制過程,保持了與實際控制的一致。
  11. Abstract : it deals with the operation, calculation principle and steps in the application of transit polar setting - out in highway constructions

    文摘:介紹經緯儀極坐標放樣法在公路應用中的操作方法,計算原理及等。
  12. Emerson will work with bp to set the standards, processes and implementation procedures for the upgrade projects

    愛默生將同bp公司協作,共同制定標準、以及程序。
  13. The main procedure and steps are following as : according the random characteristic of the time spent by each work procedure, computer simulation is applied to produce the most possible scheduling network. and by corresponding optimization and adjustment on the network, the cost and scheduling construction network can be obtained ; during the practical construction according to the network, the warp between the actual cost and expected scheduling is tracked dynamically. then the computer simulation system is used to predict the future cost and progress operation, and take corresponding precautionary measures to control beforehand

    其主要思想與為:首先運用計算機模擬技術來模擬序作業時間的隨機特性,產生概率最大的網路計劃,並對其進行優化和調整,以獲得滿足期、質量要求的成本及網路計劃;在過程中動態跟蹤實際成本與進度與目標計劃所發生的偏差以及質量問題,然後根據已出現的偏差,利用計算機模擬技術對項目未實部分進行進度、成本的預測和分析,根據現有信息對網路計劃未完成部分進行調整和優化,以盡可能把各項費用控制在預定計劃成本之內或使程的綜合指標最優。
  14. Taking the sucessful control experiences in previous cable - stayed bridge construction into consideration, the control principles and methods for gonghe bridge, that is controling the stress of both the top and bottom sides of main beam, regarding the second stretching as the hauling cable force method, are offered, and related construction procedures for all construction stages are designed

    在總結前人對斜拉橋控制經驗的基礎上,針對公和斜拉橋控制提出了相應的控制原則和方法,即以「控制主樑上下緣應力」為主梁內力控制原則,以「二次張拉」為斜拉索索力控制的方法,並根據各階段的具體需要設計相應的施工步驟
  15. This paper analyzes the principles, advantages, characteristics and construction procedures of impact compaction technique

    摘要分析了沖擊壓實技術原理、優勢以及沖擊壓實技術特點和施工步驟
  16. The development general situation of external thermal insulation technology for external wall, its typical construction procedure and the thermal insulation performance are introduced

    摘要介紹了外墻外保溫技術的發展概況,外墻外保溫系統典型的施工步驟及保溫性能。
  17. This paper introduces a new construction method of lowering ground water level suitable for sandy soil area regarding preparation of construction equipment and materials, construction procedure, attentive matters for construction and so on

    文章從設備及材料的準備、施工步驟注意事項等方面介紹了一種適用於砂土地區降水的新方法。
  18. Abstract : taking a trial lot as example, this paper expounds the application of heavy tamping in the construction of subgrade focusing on its procedure, detection, quality control and result

    文摘:以一程試驗段為例,說明了強夯法在路基中的應用,主要介紹了試驗手段強夯施工步驟、注意事項、檢測手段及方法、質量保證措及試驗段結果。
  19. Based on the engineering practice of the waihuan station in shanghai urban mass transit line 9, this paper analyses the structure form of the deep foundation pit and the key - nodes design by using the top - down invert method, so as to optimize the engineering

    摘要以上海軌道交通9號線外環路站為實例,介紹了部分逆築法的地鐵車站深墓坑圍護結構形式,及其結構設計;著重介紹了基坑圍護結構的計算模型設定、基坑穩定性計算,及圍護結構的基礎施工步驟
  20. During construction procedure, the stressing of diaphragm beams " tendons and the tensioning of cables interact, the contacting nonlinear issues between girder and form plate etc, which require detailed analysis, arrange the orders and quantities of the stressing of the cables and tendons properly, and guide the construction. the paper, by making plane model and spacial model of yongan bridge, calculated the pre - closure cable forces ( aim forces ) with plane element program, with the help of applied structure analysis program - ansys, acquired the reasonable construction steps of tensioning of tendons and cables

    本論文採用自編平面桿系裝配計算程序和大型結構分析程序- ansys ,通過分別建立該橋的平面和空間模型(含模板的作用模擬) ,由平面桿系程序倒拆出斜拉索合攏前的索力(目標索力) ,利用ansys結構分析程序,經過多次的過程模擬計算之後得出達到目標索力的合理的施工步驟
分享友人