施工用地 的英文怎麼說

中文拼音 [shīgōngyòngde]
施工用地 英文
works area
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 用地 : area
  1. It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months

    樂灘電站從2001年10月底開始準備到2004年12月20日首臺機組投產發電,僅38個月的時間,比合理期提前了7個月,並在此期間,搶回因廠壩部份基巖溶質問題延誤的5個月期。
  2. The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed

    閉水試驗方法因其應時間較長,目前已積累了較豐富的經驗,但在閉水試驗時,管道兩端砌築磚堵、抹防水層、養護、灌水浸泡,以及試驗后的放水、磚堵拆除等繁雜序,不僅費、費時,而且消耗原材料,尤其是在缺水的區以及頂管的無壓管道,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。
  3. The function design of system includes writing down amendment and pretreatment about spatial database and attribute database. this system provides common and basic functions of gis. besides, we can make out the topographical maps, planimetric maps and skiagraph, structure objects of highway construction of design and can inquire two - way between spatial information and attribute information

    系統功能設計包括空間數據庫和屬性數據庫的錄入、修改以及預處理;系統還提供了一般gis系統應具備的基本功能,並在此基礎上進行涵蓋公路設計形圖、平縱縮圖、構造物等圖形信息與屬性信息的雙向查詢,並運掙值法等對相關屬性進行分類統計以供有關公路程項目的各方使
  4. Article 57 in the case of temporary using state - owned land or land owned by peasant collectives by construction projects or geological survey teams, approval should be obtained from the land administrative departments of local people ' s governments at and above the county level

    第五十七條建設項目質勘查需要臨時使國有土或者農民集體所有的土的,由縣級以上人民政府土行政主管部門批準。
  5. Especially the mobility is very good, so it can extend with the raw material or the construction place, and it can also make multiple matching, meet different product requirements

    尤其是機動性好,能隨原料一起延伸,並可進行多種組合,滿足不同料需要。
  6. It is proposed that the 3d - coordinate method should be used as the solution to the problems caused by narrower construction sites where the traditional methods are not applicable

    摘要針對狹窄,無法運傳統方法進行變形觀測的情況下,對深基坑的變形觀測提出了三維坐標法。
  7. A preliminary criterion on soil displacement was suggested, which is of use value for reference to eliminate harmful impacts of earth - extrusion effects on the surrounding engineering events at a geologically similar fields

    對防範類似周圍建(構)築物遭受沈樁的有害影響具有實參考價值。
  8. For the use of warning on highway, parking lot, airport, charge station residential quarter and construction site. it is convenient to take easy to install economize energy with little maintenance

    於公路、停車場、機場、收費站小區及的警示作,具有攜帶方便、安裝簡單、節約能源、較少維護等優點。
  9. Abstract : the stimulation treatment of & quot; loosening rock by the dilatancy of explosive waves & quot; is tested in the casing well 4242 for studying its result and its influence on casing. the result of the field test shows that this test is successful in technology, the oil production of the well is 4 times as much as that of it before the test ; the deformation of casing is local, and the result of the strength calculation shows that the deformation will not destroy casing

    文摘:為了研究「壓脹松動」增產技術的增產效果和對套管的影響,在延長石油管理局子長油礦對4242井進行了現場實驗.該技術採強動載波在層深處疊加的方法,造成壓脹條件,松動巖石,增大近井帶滲透率,提高油井產量.后,該井產量增加為原來的4倍多.本次實驗藝上是成功的,首先是按設計要求引爆了炸藥,其二是由於採取了保護措,使套管變形局限在段處,不影響下泵,不影響油井生產;套管強度校核分析也證明了套管不會破壞.質效果明顯
  10. To discuss the feasibility of applying this technique into the practice of engineering, this paper references the real project of the running tunnel from great showplace to scientific house in shenzhen metro, uses the geotechnical centrifuge of southwest jiaotong university, then researches the settlement of the ground and the influence on the pipeline underground in stratum with abundant water by the technique of undraining spin - spay pile, at last draws a conclusion about the principle of the ground settlement with the construction method of excavating soil rich in water without dewatering at shenzhen metro

    為了探討離心模型試驗技術這一研究手段在程中應的可行性,結合質、水文、結構較為復雜的深圳鐵大科區間暗挖sk3 + 355斷面的具體實例,應我校新近建成的100gt土離心試驗機,採離心模型試驗技術對在富水層應水平旋噴樁藝進行控制降水表沉降變形及下管線的影響進行了研究。
  11. In view of the general prevalence of the obscure financial orientation, backward management mode and ambiguous property right and disorderly capital management of the conglomerates, this article, for the purpose of effectively ironing out the series of existing problems, puts forward the augment that corporate groups ’ financial management mode must be persistently based on capital operation as its core, thus demonstrating the principle of the organic combination of the centralized power and decentralized power, establishing a financial management mode characterized by the integration of centralized power and decentralized power, which will be conducive to bringing into full play the financial control function of the parent company and the subsidiaries, stimulating the initiative and creativity of the subsidiaries and effectively controlling the risks of the operators and the subsidiaries

    以建築、房產開發為主營業務的大型集團型國有企業為例,他們在財務管理方面普遍存在著分權過度的問題,對子公司的財務行為難以統一協調,無法合理配置有效資源,致使企業集團的凝聚力、控制力難以實現。因此,構建有效的財務管理體制,強化企業集團的財務管理職能,灌輸財務管理的戰略思想已迫在眉梢。因此,本人希望充分利本人在吉林大學的三年碩士班學習掌握的財務管理知識,結合導師指導和自身作體會來了解分析當前企業集團存在制約企業集團良性發展的普遍問題入手,基於集團的組織模式、制度建設,預算管理等方面進行深刻剖析,結合現實案例系統並有針對性的提出了一套具體的集團企業財務管理戰略模式,以期能對企業集團的生存與發展具有較好的現實意義。
  12. Wdtf is the manufacturing base for geotechnical drilling tools of cge. its main products are drilling tools for geological and engineering drilling, including wireline drilling tools, pneumatic downhole hammers, downhole drilling motors, synthetic diamond and its products, tungsten carbide and its products, various drilling pipes and tools. all products are reliable in quality, stable in performance and reasonable in price

    無錫鉆探具廠為中裝集團勘探和鉆具的生產基,主要生產各種質勘探鉆進鉆具和鉆具,包括以繩索取芯具系列風動潛孔沖擊器系列螺桿鉆具系列為代表的鉆探具人造金剛石及其製品各種牌號的型號的硬質合金及其製品各種釬桿釬具等。
  13. Compared with ymh - 1000, the biggest feature of ymh - 2000 is that it can be assembled into double - storey house, with external wall panels dismantled

    建築房。程項目經理監理人員的辦公住宿房等野外作業房。
  14. Power supply in engineering construction

  15. It is agreed and understood that the insurers shall only indemnify the insured for loss, damage or liability directly or indirectly caused to construction plant, equipment and machinery by flood and inundation if after the execution of works or in case of any interruption, such construction plant, equipment and machinery are kept in an area not endangered by 20 - year floods

    茲經雙方同意,只有在被保險人將結束后,或任何中斷時的機器放置在最近20年未遭受洪水或水災侵害的方的情況下,本公司對被保險人因洪水或水災直接或間接造成機器的損失及由此產生的責任負責賠償。
  16. The main work done in this paper is as follows : ( 1 ) simulate the temperature field of basement wall by ansys software, sum up the characteristics of the temperature field of basement wall, and analyze the influence of the types of the molding board, environmental change and cement content ; ( 2 ) the whole simulation analysis process of early - age concrete stress field is realized by sub - development of ansys, and cts - ansys software is developed with fortran ; ( 3 ) based on the cause of cracking, the influence of the thickness of the wall, length, bar arrangement, mix proportion, expanding agent, etc, on the wall stress due to concrete creep and temperature change is analyzed

    本文主要進行了以下幾個方面的研究: ( 1 )利ansys軟體,模擬了下室側墻溫度場,總結了下室側墻溫度場分佈的特點,分析了模板類型、環境變化和水泥量等對墻體溫度場的影響; ( 2 )以大型通有限元軟體ansys為平臺進行二次開發,運visualfortran語言編寫了cts - ansys程序,實現了期混凝土徐變溫度應力的模擬計算; ( 3 )從裂縫形成的原因出發,分析了下室側墻厚度、長度、配筋率、配合比、膨脹劑等因素對墻體徐變溫度應力的影響。
  17. The article calculates the settlement curve of the ground depending on the experimental model settlement, and argues that the settlement control value shall be proposed for this design

    同時根據試驗模型的面沈降,假設面沈降曲線,提出採該方案時,面的沈降控制基?值。
  18. Taking the shield structure tunnel for project r413 of shanghai metro line 9 goes down through shanghai - hangzhou railway as a background, this paper compares and analyses the influence of ground settlement coursed by shield structure construction through fem, holds that this method shall be applied for other engineering projects to ensure the safety of the railway

    摘要以上海軌道交通9號線r413項目盾構隧道下穿滬杭鐵路線方案為背景,運有限元數值模擬,就注漿和不注漿加固兩種方案,分析了盾構法表變形造成的影響,提出合理的方案。
  19. Standard guide to site characterization for engineering, design, and construction purposes

    程設計和表徵的標準指南
  20. Construction of all temporary handrails and fencing must comply with the relevant statutory regulations, and if required must be installed progressively with the building, floor, etc, to provide safe access to an area as early as possible

    臨時搭建的扶欄和圍欄必須符合有關法規,並且必須隨著建築物、板等的進度逐漸安裝,盡可能早為各區域提供安全通道。
分享友人