施工用電 的英文怎麼說

中文拼音 [shīgōngyòngdiàn]
施工用電 英文
electricity on construction site
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 用電 : electricity utilization
  1. It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months

    樂灘站從2001年10月底開始準備到2004年12月20日首臺機組投產發,僅38個月的時間,比合理期提前了7個月,並在此期間,搶回因廠壩部份地基巖溶地質問題延誤的5個月期。
  2. Dosimetry in electron and bremsstrahlung irradiation facilities for food processing, practice for

    食品加子和韌致輻射輻照裝置中劑量測定的實規程
  3. Practice for dosimetry in electron and bremsstrahlung irradiation facilities for food processing

    食品加子輻射和韌性輻射設備的輻射劑量測定的實規程
  4. Application of numerical calculation into draft tube construction

    數值計算在三峽廠尾水管中的應
  5. During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer

    近三年來主要從事機械行業程設計,先後參與二十五個項目的可行性研究報告編制,初步設計和圖設計.涉及機床廠,齒輪廠,拖拉機廠,汽車製造廠,泵廠,機廠,纜廠的新建或技術改造,其中單項投資額最高的為1 . 6億元,總計完成投資額為8 . 5億元(未重復計算)的設計作量.由於對機械行業發展狀況和省內狀況較為熟悉,具有一定的專業水平,這些設計項目均經有關領導部門,專家審定列入國家計劃,得以實,為廠的技術進步,產品更新換代,生產發展創造較好的經濟效益和社會效益.在這些設計,咨詢中,本人均任項目負責人,全面組織,實設計作,得到主管部門和戶較高評價
  6. High water - cement ratio during construction and low water - cement ratio during solidification are realized by using electroosmosis technology to change the process of concrete construction

    滲濾水技術,滿足了混凝土大水灰比、小水灰比固化的要求。
  7. Electroosmosis technology can solve the problem of high water cement ratio during construction and low water cement ratio during solidification effectively so that have expansive application prospect

    結論滲濾水混凝土技術能有效地解決混凝土的大水灰質量比、小水灰質量比固化的矛盾,有重要學術價值和廣闊的應前景。
  8. Due to complex and varied geological conditions for 4 headrace tunnels at zipingpu project, real time monitoring technique was used during informatization construction according to new austrian tunneling method, system observation for typical sections was conducted by following in - situ construction, based on which inverse analysis for rock mechanics parameters was conducted

    針對紫坪鋪程4條引水發隧洞復雜多變的地質條件,採新奧法隧洞信息化中倡導的實時動態監測技術,跟蹤現場進行了典型斷面的系統觀測,在此基礎上進行了圍巖宏觀力學參數的反分析研究。
  9. The contents of guidebook include : the terms and definitions of night piece illuminating ; basic principle and request ; programming and design ; the night pieces of various illuminating of city facilities and views, such as the building, construction, square, road, the marking of advertisement, park, leisure facilities, dissolve hole and view of water ; the devices of night piece illuminating, equipments with high newly technical application ; power supply and control ; construction and check before acceptance ; the test and the evaluation of the result ; maintenance and management ; environmental protection and the economy energy, etc.,

    指南的內容包括:夜景照明術語與定義基本原則與要求規劃與設計各種城市設與景觀的夜景照明,如建築構築物廣場道路廣告標志園林與休閑設溶洞及水景等夜景照明器材設備與高新技術的應與控制與驗收效果的測試與評價維護與管理環保與節能等等,並提出了需要注意的問題與解決的辦法。
  10. Circuitry construction tools produced by our company are more than eight hundred of kinds in 18 series, which are suitable for foundation construction, tower group sets up the pole 、 a thread constructs 、 cable construction, optical cable construction, such as entangle and rub flexibly 、 insulating aerial cable and cable skinning device 、 aluminiam alloy cherishes the pole 、 and lead 、 card thread device of ground wire 、 high strength shackle 、 ratchet wheel board hands with sharp board hands 、 tight line device of double hook 、 lifting block 、 nylon wheel and aluminium wheel is pat the thread coaster, and etc, with full series and more kinds. as high technology and reliable quality, we have a good reputation among sane fields at home and abroad

    公司生產的線路機具包括於基礎,桿塔組立、架線,光纜序的18大類800餘種產品,如機動絞磨、絕緣架空纜及高壓纜剝皮器,各類鋁合金抱桿,以及導、地線卡線器、高強度卸扣、棘輪扳手與尖扳手、雙鉤緊線器、起重滑車、尼龍輪或鋁輪放線滑車等,系列全、品種多,產品具有藝精湛,質量可靠等特點,在國內外同行業中有較高的信譽。
  11. This thesis built the models computing the working frequency over - voltage " operation over - voltage for 220kv fugai transmission line, calculates and analyzes working frequency over - voltage " operation over - voltage using emtp program and provides reasonable protection measures for the transmission line. furthermore, regulations method, traveling wave method and striking distance method are used to study and compare lightning - enduring capabilities of different types of pole in power transmission lines aiming at the fact that the lightning strike switching rate of 220kv fugai line is higher

    本文分別建立了計算220kv復蓋線路的壓升高及操作過壓的計算模型,利emtp程序對220kv復蓋線路壓升高、投切空線過壓、投切空變過壓、單相故障過壓進行計算分析,並提出合理的防護措
  12. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根據程實踐,提出了全站儀直接測量平距、高差來代替測斜距、天頂距作四等及四等以下控制網測量的理論依據和方法,並以張河灣抽水蓄能控制網為例進行了比較計算。
  13. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採高壓水流沖毛技術,大大提高了效,減少了倉面污染;模板程大量採定型鋼模板技術,提高了壩體混凝土成型質量和程進度;在二期混凝土區域,為免除人鑿毛勞動強度,採永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的焊連接方式,採大量採鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期程持續高強度混凝土系統程的研究,使三峽程成為名符其實的「世界一流程」成為可能;三峽二期程混凝土溫控綜合技術的應,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應,提高了建築物的整體性和耐久性。
  14. The author uses the technique of generalized network plan and the key line methods to divide the boiler installation item and build configuration model, adopts the p3 in the building pingliang power plant project to realize the dynamic management of this installation plan, and give news of the project schedule, plan and material to the power plant by the computer network to help the manager

    本文作者應廣義網路計劃技術和關鍵線路法對鍋爐安裝項目進行作業劃分和建立結構模型,並通過p3軟體在平涼廠在建程中的應,實現了安裝程計劃的動態管理,並通過計算機網路向廠發布程的進度、計劃、材料等方面的信息,為管理層提供了詳實的管理數據。
  15. Brief talk on zipinpu water conservancy project construction power management

    淺談紫坪鋪水利樞紐施工用電的管理
  16. Hand - held portable power tools - measurement of vibrations at the handle - pavement breakers and hammers for construction work

    手持便攜具.手柄振動測量.路面碎石機和汽錘
  17. Apply to the temporary construction houses of such field work as the road, railway, building, etc. ; urban municipal administration, commerce and other provisional houses, for instance : temporary office, meeting room, command post, dormitory, temporary shop, temporary school, temporary hospital, temporary parking area, temporary exhibition hall, temporary maintenance, temporary distribution room, temporary service station, etc.

    廣泛應於道路鐵路建築等野外作業的臨時房城市市政商業及其他臨時性房,如:臨時辦公室會議室指揮部宿舍及臨時商店臨時學校臨時醫院臨時停車場臨時展覽館臨時維修部臨時配房臨時加油站等。
  18. Management and safety of power supply in construction

    施工用電的安全及管理
  19. Power supply in engineering construction

    施工用電
  20. Measuring instruments for building construction - methods for determining accuracy in use of electronic distance - measuring instruments up to 150 m

    建築測量儀器.第8部分:最遠可達150m的子式測距儀器使精度的測定方法
分享友人