明挖隧道 的英文怎麼說
中文拼音 [míngwāsuìdào]
明挖隧道
英文
open cut tunnel- 明 : Ⅰ形容詞1 (明亮) bright; brilliant; light 2 (明白;清楚) clear; distinct 3 (公開;顯露在外;不隱...
- 挖 : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 明挖 : open cut; open cutting明挖隧道 open trench tunnel
- 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
-
( 6 ) the principal stress direction arised deflexion obviously after excavation, the maximum principal stress paralled to opening, minimum principal stress vertical to sidewall or vault
( 6 )數值模擬研究表明,隧道開挖后,主應力方向發生明顯偏轉,最大主應力與開挖臨空面平行,最小主應力近於垂直。Study on prefab concrete lining technology for open trench subway tunnels
地下鐵道明挖區間隧道結構預制技術的研究The cut - and - cover tunnels are approximately 500m long extending from the existing mtr hong kong station
擬建造的明挖回填隧道,約長500米,隧道連接現有地鐵香港站。Cityu has confirmed that the cut - and - cover method would be the most appropriate method for constructing the tunnels along salisbury road
城市大學已確定明挖回填方式是建造沿梳士巴利道的一段隧道的最適當方法。The government spokesman said, " in fact, the cut - and - cover method would be more costly, lengthy and difficult for the kcrc contractor, as compared with bored tunnelling
政府發言人說:事實上,對九鐵公司的承建商來說,明挖回填方式比鉆挖隧道方式更為昂貴,所需時間更長,而且難度更高。As regards the section of tunnels along salisbury road, it is necessary to construct it by the cut - and - cover method to avoid possible hazards to the adjacent buildings, the existing utilities and the very important mtr tsuen wan line tunnel along nathan road
至於沿梳士巴利道的一段隧道,則有需要以明挖回填方式建造,以避免對毗鄰的建築物、現有的公用設施和沿彌敦道的一段極重要的地鐵荃灣線構成任何潛在的危險。This is why a special tunnelling machine capable of excavating through both soft ground as well as hard rock was used. without this machine, the tunnelling would have to be done by cut - and - cover method, causing major traffic and environmental disruption. with this tbm, all these impacts can be avoided
故此選用這臺既可在軟土又可在硬石層運作的隧道鉆挖機,避免以明挖隨填的方法開鑿隧道,免卻對交通及環境造成嚴重影響。Cut and cover method
明挖覆蓋法隧道Calculation of the structure clearance for rectangular tunnel in urban rail transit
軌道交通明挖矩形隧道曲線地段建築限界的計算Members noted that kcrc proposed to use bored tunnel instead of the cut and cover method for the construction of the ksl along canton road
交諮會成員得悉九鐵建議以隧道鉆挖的方式,取代明挖隨填的方法興建途徑廣東道的九龍南線。It was shown that the maximum displacement occurred on the tunnel axis when one tunnel was excavated, while the maximum value happened near the shallow tunnel and between the area of two tunnels when two adjacent tunnels were excavated at the same time
分析結果表明:單條隧道開挖引起的地表最大沉降值出現在隧道軸線的正上方,而兩左右或上下相鄰隧道開挖的地表及土層內部的最大沉降值則出現在兩隧道的縱軸線之間,且偏向上方埋深較淺的隧道。This suggests that state acquirers tend to have a stronger tunneling incentive
這表明國有收購方有更強的激勵趨向于操作隧道挖掘。Our study shows that the market can also be distorted by agency problems of controlling shareholders, in which state acquirers tend to tunnel and invest in projects with low returns
我們的研究表明公司控制權市場還可能被控股股東代理問題扭曲,即國有收購方趨向于隧道挖掘以及在低回報的項目上投資。Optimum design for construction management by limiting the period of survey, drilling, loading and exploding, ventilating and transporting is intensively studied and the applicability of boosting the speed of construction by well organization of space, manpower and machine is fully illustrated
論文重點闡述了通過縮短測量劃線、鉆眼、裝藥爆破、通風排煙、裝碴運輸作業時間,達到快速施工組織設計優化的目的,說明了採用鉆爆法施工充分利用隧道空間,合理配備人力、機械,隧道開挖施工進度得到提高的可行性。Andy was right. i finally got the joke. it would take a man about six hundred years to tunnel under the wall with one of these
「安迪是對的,我終于明白他為什麼發笑了。如果用這種石錘挖在墻下挖隧道,會讓一個人挖上六百年! 」The results indicate that the smaller the cash - flow eight caned by controlling minority shareholder or the lower the roa of the under layer firm or the worse the protection of investors, the more severely the tunneling to outside shareholder
結果表明:在保證控制權的情況下,控制性少數股東所持有的現金流權越小,其隧道挖掘越嚴重;處于金字塔底層的公司資產利潤率越低,控制性少數股東越傾向于對其進行隧道挖掘;投資者保護越差,越有利於控制性少數股東的隧道挖掘。Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice
軟弱大跨超淺埋扁平隧道必須按「管超前,嚴注漿,多分部、短開挖、強支護、快封閉,勤量測」的施工原則進行施工,採用「眼鏡超前,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短進尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。Combining gray theory and catastrophe theory, the gray energy catastrophe model is brought out according to the critical value of energy. the real example shows that the critical value is unique. the analytical process of rock mass fail shows that the process of fail of the rock mass is the process that dissipation structure is formed, and that self - organization of surrounding rock is built during the process
在臨界狀態時,只要系統稍有擾動,則系統就會失穩;強擾動可以使失穩提前發生;將灰色理論和突變理論相結合,以能量突變為材料的破壞特徵,提出隧道巖體開挖的灰色能量突變模型,通過實例分析表明,該失穩判據具有唯一性;對巖體失穩的過程分析表明,巖體的失穩過程實際上是耗散結構的形成過程、是巖體的自組織過程,圍巖系統在演化過程中出現分叉和混沌現象。分享友人