最低水位 的英文怎麼說
中文拼音 [zuìdīshuǐwèi]
最低水位
英文
droughty water discharge-
The contents of three valepotriates in v. officinalis also varied significantly different areas, samples from nanchuan of chongqing showing the highest. it is also showed that the contents of three valepotriates in underground part of valerians plants are higher than that in aerial part and the contents of three valepotriates in valeriana jatamansi herb and v. officinal is herb collected in september is highest. valepotriates of valeriana jatamansi were obtained using petroleum ether, with content of valtrate, didrovaltrate and acetovaltrate between 70 % and 80 %
我們以採用rp - hplc法測定不同產地、部位和採收期的纈草屬植物中纈草素、二氫纈草素和乙酰纈草素的含量,結果發現纈草類生藥蜘蛛香、纈草、寬葉纈草和黑水纈草之間纈草素類成分含量差異顯著,其中以蜘蛛香含量最高,纈草次之,寬葉纈草再次,黑水纈草含量最低。Edema tends to appear first where tissue turgor is normally lowest.
水腫首先表現在正常時充盈度最低的部位。At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel
首先,系統分析了影響黃河水位的水沙因素,及僅用水沙因素有效研究水位的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應水位過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中高及中低含沙類洪水相應水位過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應洪水位過程的擬合誤差都較小;最後,明確黃河下游含沙量對水位的主要影響方式,即含沙量主要是與其它因素聯合對水位作用;另外分析了要實現變動河床洪水位過程準確預報的困難所在及改進方向。The results show that the genetic diversity of filial generations is higher than self - bred progeny ’ s , the hybrid vigor has manifested at metabolization level 。 the proportion of polymorphic loci ( p. 99 ) in f1 generations was 30. 77 - 36. 36 % , the mean observed heterozygosity ( ho ) of jmcf ( japanese male chinese female ) was the highest with 0. 1727, the rest populations were : jfcm ( japanese female chinese male ) 0. 1536 、 cp 0. 1273 and jp 0. 1055 , the mean effective number of allels per locus in f1 generations : cp ’ s was the highest with 1. 7318 , jp ’ s was the lowest with 1. 6718 , the filial generations ’ values were in the midle of the cp ’ s and jp ’ s and between them there was no brightly difference, with 1. 6955 ( jfp ) and 1. 6927 ( jmp )
各組的平均雜合度預期值也表現出該趨勢,即:日自交組最低,為0 . 1786 ,日雄中雌雜交組的平均雜合度最高,為0 . 1964 ,日雌中雄雜交組和中自交組分別是0 . 1891和0 . 1865 。 hardy - weinberg平衡下遺傳偏離指數也是雜交組的小於自交組的,平均每個位點的等位基因有效數目中自交組最高為1 . 7318 ,日自交組最低為1 . 6718 ,兩雜交組群體的這一指數相差不多,分別是1 . 6955和1 . 6927 ,位於兩親本的中間水平。In this experiment, adjusting the throttle to the specific position, and letting engine rotary speed change from the lowest to the highest, at the same time, the data of the water temperature, the fuel temperature, the air press and the rotary speed can be noted. moreover, we can measure the fuel quantity and the ignition angle
實驗中,調節節氣門在特定位置,並讓發動機的速度依次從最低變化到最高,同時記錄水溫、油溫、進氣壓力和轉速等數據,還可以測出相應的噴油量、點火提前角。In regulation works of mountainous channel, determination of designed lowest navigable water level of reach with fluctuating backwater area is a common problem
摘要變動回水區河段設計最低通航水位確定是目前山區航道整治工程中經常遇到的問題。Taking the reach with fluctuating backwater area in jiaokou hydroplant in xiujiang river, guanxi zhuang autonomous region for instance, this paper analyzes the water - sediment characteristics of the fluctuating backwater area, calculates the design level of this reach with samples of level and discharge, etc., and propounds the determination method for the designed lowest navigable level of reach with fluctuating backwater area
以廣西繡江交口電站的變動回水區河段為例,分析了變動回水區的水沙特性,分別利用水位、流量樣本及不同方法計算與分析本河段的設計水位,提出了變動回水區河段設計最低通航水位的確定方法。Based on the classification of images, this paper gives out four digital image steganography techniques which have good conceal effect, including low - three - bits hiding strategy, odd - even of hypo - low bit hiding strategy, deviation of adjacent - field hiding strategy and self - adaptive deviation of adjacent - field hiding strategy. on digital watermarking aspect, this paper gives two blind watermarking strategies which have good conceal effect and high robustness, they are single - watermarking strategy based on minimal - value exchanging and multi - watermarking strategy which hides the same watermark copy on the different parts of an image
在對圖像進行了分類的基礎上,本文給出了四個具有較好掩密效果的數字圖像隱寫策略,包括低三位隱藏策略、次低位奇偶策略、鄰域方差策略和自適應鄰域方差策略;在數字水印方面,提出兩個掩密效果好且魯棒性較高的數字圖像盲水印策略,分別為基於最小值交換法的單一水印策略和嵌入同一水印多個副本的多水印策略。The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation
福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。The underground water flows a few meters and enters a water - dropping hole of the underground river. when the water level rises one to two meters high, it promptly drops down, producing thunder - like drainage sound
原來,虹吸泉所在地是奇風洞地區的最低點,二者相通,地下河水流淌數米后,進入暗河的一個落水洞,當水位升高一至二米后會猛然跌落。A rather large spring tide occurred on july 4, 2004. on that occasion, the lowest sea level recorded in victoria harbour was 0. 07 metre below chart datum and a few ferries experienced difficulty while berthing
二四年七月四日亦出現了一次較大的大潮,當日維多利亞港錄得的最低水位為海圖基準面以下0At the same time, a lot of electrical energy is wasted when the level is high and the working curve is displaced. so urgent affairs are choosing right timing ways to rebuild the pumps. applying frequency conversion timing to wind machines and pumps is an important technology in our country
設計都按照長江、漢水百年一遇最低水位選擇水泵出水揚程,這樣在高水位時往往由於揚程太大而偏離水泵的工作高效區,浪費了大量電能,選擇合適的調速方式對泵船水泵機組進行節能改造,成為當務之急。The worked surface is approximately 2m above the highest water mark, which is a rather low position compared to similar rock carvings
石刻離開最高水位約二米,就同類型石刻的位置而言,這是一個頗低的位置。The conditions have reduced water levels in the yangtze river to historic lows and raised concerns over the massive three gorges dam ' s ability to generate power, state media reported last week
官方媒體上周表示,惡劣的情況使得長江的水位下降到歷史最低點,三峽大壩的發電問題也備受關注。She was doing her midnight meditation when she suddenly awoke and opened her door to find that the rising water was only a few inches from her home. she quickly awakened her family and evacuated them to a higher place, and within minutes, water had submerged their home, which had never been flooded in the thirty odd years they had lived there
在風災平靜后,各地哀嘆聲中,我耳聞靠近最低洼地區的一位師姊如何福至心靈,忽然半夜在打坐時警醒,開門一看水已近家門口,趕緊叫醒一家大小往高處道路逃生,短短數分鐘后,洪水淹沒了住了三十多年從沒淹過水的家。This thesis regard internal property reorganization in the group of pangang as the research object, from chengdu seamless steel pipe limited liability company with chengdu iron and steel works inside exterior environment reorganizing in front and back commences, making use of to exceed the makel - bot with of five factors competition models and the method of factors analysis, after analyzing the reorganization of the business enterprise a profession for facing competes the situation. develop the development the business enterprise with the profession industry from the international local profession rival circumstance after analyzing the reorganization should the market position of the establishment with develop the strategy target. make use of the swot the analysis the method, to after the reorganization the development strategy of the business enterprise, from manage the angle proceeded the fixed position analyzes, for after the reorganization business enterprise development provided four kinds of developments strategy that eligibility choose : the brave development strategy, request the resources advantage, funds advantage, human resource advantage, technique advantage that new company make the most of new business enterprise in empress in reorganization, is an essential condition to increases to manage the level, quickly technique reforms, develop the high and additional worth product with new product production line, as soon as quikly change to strong and large business enterprise, realizes soon steel aircraft carrier dream ; dispersion strategy, the technology market quota with deal with produce high additional worth product, completely promote business enterprise brand image, extend high carry product of the exaltation product, is a necessary means to increases business enterprise performance, realizes business enterprise target ; defense strategy, adjusting the business enterprise organizes construction, reducing the intensive type in labor and the low additional worth product line, lower bad the property saves the deal, alleviating the business enterprise burden, attaining the casual wear go to battle, benefitting to the challenge that make frontal attack the rival ; withdraw strategy, compress the production of the high depletion and high cost product, simplify the production craft, controlling the cost of the end product in the lower level, is a valid path to increases business enterprise competition ability
本論文以攀鋼集團內部的資產重組為研究對象,從成都無縫鋼管有限責任公司與成都鋼鐵廠重組前後的內外部環境入手,運用邁克爾?波特的五力競爭模型及因素分析法,分析了重組后的企業所面臨的行業競爭態勢。從國際國內行業競爭對手情況和本行業發展動態分析了重組后企業應確立的市場地位和發展戰略目標。運用swot分析法,對重組后企業的發展戰略,從管理角度進行了定位分析,為重組后企業發展提供了可選擇的四種發展戰略:即大膽發展戰略,要求新公司充分運用重組后新企業的資源優勢,資金優勢,人力資源優勢,技術優勢,是提高管理水平,加快技術改造,開發高附加值產品和新產品生產線,盡快立於強勢企業之林,早日實現「鋼鐵航母」夢的必要條件;分散性戰略,提高產品的科技含量和生產高附加值的產品,全面提升企業品牌形象,擴大高端產品的市場份額,是提高企業效益,實現企業目標的必要手段;防禦性戰略,調整企業組織結構,削減勞動密集型和低附加值產品生產線,降低不良資產存量,減輕企業包袱,做到輕裝上陣,有利於迎擊競爭對手的挑戰;退出性戰略,壓縮高消耗、高成本產品的生產,降低低端產品的比例,精簡生產工藝,將最終產品的成本控制在較低水平,是提高企業競爭力的有效途徑。For wet - pit installations, it is recommended that the low water level elevation be specified to meet or exceed the minimum submergence to prevent vortexing
對于濕井設備安裝,建議所確定的低水位高度應該達到或超過預防渦流的最小潛水深度。However, the correlated property gradually disappear and seismic activity decrease when water levels come to the highest levels of the fist stage project and correspondingly trigger earthquake with 4. 7 magnitude
但是,研究表明,當水位達到一期工程最高水位,並誘發了4 . 7級地震后,蓄水位和地震的相關性逐漸消失,地震的活動性明顯降低。According to the observatory s tidal predictions, spring tides that may have larger tidal ranges will occur again on july 22 and 23 predicted lowest sea level in victoria harbour being 0. 1 metre and december 3 and 4 predicted highest sea level in victoria harbour being 2. 7 metres this year
根據天文臺的潮汐預測,今年其他較大的大潮會出現在七月二十二至二十三日預測維多利亞港之最低水位為0 . 1米以及十二月三至四日預測維多利亞港之最高水位為2 . 7米。According to the observatory s tidal predictions, spring tides that may have larger tidal ranges will occur again on july 22 and 23 ( predicted lowest sea level in victoria harbour being 0. 1 metre ) and december 3 and 4 ( predicted highest sea level in victoria harbour being 2. 7 metres ) this year
根據天文臺的潮汐預測,今年其他較大的大潮會出現在七月二十二至二十三日(預測維多利亞港之最低水位為0 . 1米)以及十二月三至四日(預測維多利亞港之最高水位為2 . 7米) 。分享友人