最大張應力 的英文怎麼說

中文拼音 [zuìzhāngyīng]
最大張應力 英文
maximum tensional stress
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ動詞1 [書面語] (給弓或樂器上弦) fix (a bowstring); string (a musical instrument) 2 (分開;...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. Leadership clearly incapable of grasping the complexity of the office or in constant need of briefing on the most elementary issues elicits the most self-willed assertions of foreign service parochialism.

    如果領導顯然無付復雜的工作,或是連基本的問題也需要經常聽取匯報,那就會引起外交人員自作主搞本位主義。
  2. Therefore, the prestress of the cable should make sure that the cable is in the tight state in the entire process. the largest wind load which the prestressed cable truss can undertake is studied emphatically in the article

    因此,索中初始預能保證索在工作的全過程中始終處于緊狀態,以此為條件,本文重點研究了預索桁架所能承受的風荷載值。
  3. The jiangkou hydropower station that is now under construction is the largest hydropower project on the main stream of the furong river. it ' s the most important electricity energe source of chongqing in the 21 century and it also be the main project of the big develop of western

    江口水電站是重慶21世紀重要電能源供基地,是西部開發的一項骨幹工程,也是烏江支流之一的芙蓉江幹流上的在建水電工程,目前該工程正在緊的施工之中。
  4. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體量值明顯增高,同時左岸的區的范圍及量值明顯減小,主的方向依然與模型的底邊界垂直;壩建成后逐漸蓄水階段以及同時考慮本區強地震的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區地震的共同作用,壩體將在滑坡體下滑推的作用下產生破壞;建壩后水平推對右岸古滑坡體穩定性的影響分析可以看出,在危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理學參數的降低而有可能導致壩體失穩破壞。
  5. The checking methods of prestressed concrete penstock during construction stage are suggested. the formula is proposed to calculate the maximum distance of two consecutive strands to be result in uniformly distribution of concrete prestressed along the penstock

    提出了相鄰環預筋束的間距計算公式,確定了以混凝土抗裂為目標進行預筋束分步拉施工與荷載控制的方法。
  6. Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated

    本文以蓮沱特橋工程實踐為背景,以主拱施工研究為主線,對鋼管混凝土拱橋重難點施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計施工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋施工過程中內的計算,確定了拱肋施工不利荷載工況下加載重量、壓重順序和拉臨時預束等一系列施工措施,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。
  7. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后隧洞.通過量的調研、試驗、分析論證,在施工前確定該預方案選用無粘結預系統,成為目前世界上規模的無粘結預隧洞襯砌工程,在國內尚屬首例
  8. Firstly, the domestic researches, which have been reported, are introduced. then the characteristic of the system in estimation of prestressing losses is analyzed by theoretical method, and the reasons that the elimination of tendon is large and test results are not consistent are pointed. using fem software ansys, anchorage zone of pylon are analyzed

    論文首先介紹了國內現階段對該問題的一些研究成果,然後從理論上分析了小半徑噸位環向預體系在計算預損失方面的特點和造成拉伸長量偏且實測的數據離散性較的原因,並採用國際權威的有限元分析軟體? ? ansys從理論上進行分析和索塔錨固區不利節段的足尺寸模型試驗進行校驗。
  9. All the results of axial and radial deformation measurement by digital image processing technique and those by traditional method are compared. the differences of the soil parameters on duncan and chang ' s nonlinear model made by these two methods are analyzed. finally, a compress test results and fem results are provided to show the reasonability and veracity of digital image processing technique to study the soil stress - strain characteristic in triaxial test

    ( 2 )三軸試驗土樣局部變形研究:首先定量比較了三軸試樣沿高度方向不同位置的局部變形(局部徑向變形與局部軸向變形)小,分析了三軸試樣局部變形的特點和影響因素;然後把三軸試樣數字圖像測量結果與傳統測量結果進行比較,以鄧肯非線性模型為例進行了模型參數的整理,分析了兩種不問測量方法引起的參數差異:後用原型壓縮試驗對比有限元數值計算結果,驗證了數字圖像測量方法得到的三軸試驗土體變參數的合理性和準確性。
  10. Lastly, according to correlation theoretics of advanced education and application theoretics of computer multimedia technology, the paper researched and empoldered college physical experiments " multimedia textbook. on the base of abundant investigation and practice in practical work, some research and development principles about multimedia textbook were concluded, and the basic frame of college physical experiments " multimedia textbook was constructed. and thereinto, five multimedia experiments such as measuring electrostatic field with simulation method, michelson interferometer, measuring the tensility of liquid surface, air cushion navigation experiment, and drawing lissajous figures were empoldered

    後,論文根據高等教育的相關理論和計算機多媒體技術的用理論,開展了「學物理實驗」多媒體教材的研究與開發工作,並在量調查研究和研發實踐的基礎上,歸納出多媒體教材的研發原則,構建起「學物理實驗」多媒體教材的基本框架,同時研發了「模擬法測靜電場」 、 「邁克爾遜干涉儀」 、 「氣墊導軌」 、 「液體表面的測定」以及「李薩如圖形」等五個實驗內容的多媒體教材。
  11. The machine bas the functions of photoelectrical suitable for printing rolled paper of bopp 、 pet, glass - paper etc. for multiple colors in batch production

    本機裝有光電跟蹤、自動糾偏、自動等自動功能,適用於bopp 、 pet 、玻璃紙等具有良好適性能的捲筒料多色邊續中批量印刷的佳設備。
  12. The vertical loading plays a major role in the state of the flexural stress. beneath the mountain belts, the compression decreases and changes to extension from the top of the elastic plate to the bottom. the change of the flexural stress beneath the basin is vice versa

    從彈性板頂部向下,造山帶下方的擠壓逐漸減小,到中性面以下變為拉,然後逐漸增,在彈性板底部達到;盆地下方的變化則與之相反。
  13. Enhencing and perfecting some rights of the minority shareholders. for instance, the right to know, the right of control, voting power, the appraisal right of dissenters, etc. at last, the paper calls for starting up the judicial practice of shareholder ' s litigation in china

    鑒於我國股權保護法律措施的欠缺,筆者以為弱勢股東權利,以形成一個同規制控制股東行為相得益彰的弱勢股東權利保護機制。首先,確保弱勢股東的知情權,此乃股東基礎的權利。
  14. After 1989, the increase of demand slowed down and facing the complexion of low degree of industrial concentration of product market and financial strain of medi um and small - sized enterprises caused by the circulating trap of " credit squeeze - - - bad loan ", the advantageous enterprises " " wallow in money ", specifically, those listed companies that could finance from the stock market, began to take predatory pricing strategy in succession and tried to enlarge market share and obtain high return by squeezing medium and small - sized enterprises out of the market after 1998, the vicious circle of deflation and " credit grudging " of banks in product and credit markets, overcapacity, the difficulty of retreating of loss - incurring enterprises in some industries from the market for institutional reasons and over - competition in some industries, led to the incessant decrease of enterprises " global income, persistent increase of rate of debts and constant rise of ratio of bad assets of banks, which further intensified the vicious circle of deflation and " credit grudging " of banks

    如在改革開放初期,在產品市場需求旺盛和信貸市場預算軟約束的情況下,各類企業的優決策就是採用高負債、高擴的「負債的有限責任效」策略來搶占市場並獲得高回報; 1989年以後,需求增速開始放緩,面臨產品市場產業集中度較低和信貸市場「信貸緊縮-不良貸款」循環陷阱導致的中小企業資金緊的局面, 「錢袋鼓鼓」的優勢企業(尤其是那些可以通過股票市場融通資金的上市公司)紛紛採用掠奪性定價策略,試圖通過把中小企業擠出市場來擴市場份額並獲得高收益; 1998年以後,產品市場和信貸市場形成了通貨緊縮和銀行「惜貸」惡性循環的狀況。產品市場上部分行業生產能嚴重過剩,且由於體制等原因導致虧損企業無法退出,因此這些行業中出現了過度競爭的現象,企業總體收益的不斷下滑、負債率不斷提高以及銀行不良資產率的持續上升,又進一步加強了通貨緊縮和銀行「惜貸」的惡性循環。
  15. It puts forward that the open degree of coal reservoir increases with the enhancement of major stress difference by means of the linkage of maxim major stress difference and coal bed physical quality. when major stress difference is larger than loompa, permeability of coal reservoir is larger than 1. 0md

    通過差與煤層物性的耦合,認為煤儲層裂隙的開度隨主差的增強而加,主差100mpa時,煤儲層滲透率1 . 0md 。
  16. The shajiao b power station in guangdong, replied sir gordon without hesitation, which was a build - own - transfer ( bot ) project completed in just 22 months, and which helped alleviate guangdong province s need for electricity

    胡爵士毫不猶豫地表示,廣東省的沙角b發電廠正是他的成就。發電廠從興建、擁有至轉售僅僅花了二十二個月,並紓緩了廣東省電的問題。
  17. To check the network crime, the author put forward proposal of lowering age for penalty and increasing unit crime in the light of that which tendency of low age is more apparent and unit crime arise too many, introducing strict liability in view of that which intentional or disintentional network crime is discriminated difficultly. to meet preventive needs, criminal law should alter result crime to dangerous or behaviour crime. because objective essentialia negotii of network crime is distinct from traditional crime, criminal law should replenish two criminal articals : crime of stealing computer network ; crime of providing computer network

    該部分提出了對網路犯罪的一系列刑法對策,針對網路犯罪主體的低齡化趨勢明顯和單位犯罪量出現的問題,提出了就網路犯罪要陽氏相對負刑事責任年齡和增設單位網路犯罪的主;針對網路犯罪罪過的過失與故意的難辯性,提出要引進嚴格責任的歸責原則;對客觀要件上的特殊哇,主前置打擊度,將網路犯罪由結果犯設置為危險犯或者行為犯;後在客體要件上,依據客體侵犯的是復雜j客體,提出要增加竊用計算機網路服務罪和提供計算機網路犯罪等罪名。
  18. The reason that ec can improve the competitive ability of firms lies in the fact that, the cost of firms can relatively contracted, and the firms have the competitive advantages of enlarging without boundary. the relatively contracting of firms cost means, the effect of diminishing of managerial costs can simultaneously occurred in the fields of production costs, marginal costs, and transaction costs, with the results that the barriers of competition was founded because of the higher transaction costs of provision regarding to the businessmen of productions and services, which are caused by the reduction of production costs rendered by higher productivity, and of managerial costs rendered by the effect of substitution of soft manufactory technology. the relative enlarging of the optimal bound of firms means, that the firms can share managerial costs through the effect of scale of management by the employment of ec, that the scale of firms is enlarged while the managerial costs are cut as a result of the distributing of managerial costs to every liners and proceeds of the firms, which means that the same managerial costs can be used by larger - scaled firms

    電子商務之所以能提高企業競爭,是因為企業成本相對收縮和企業的無邊界擴競爭優勢,所謂企業成本相對收縮即邊際成本遞減,這種邊際成本遞減效可以同時出現在生產成本、管理成本和交易成本三個領域中,電子商務通過提高勞動生產率來降低生產成本,柔性製造技術的替代效降低了庫存管理成本,與此同時,電子商務減少企業與消費者之間的環節,縮短路徑距離而降低企業內外的交易成本,提高了企業產品和服務分銷商改變供貨方式的交易成本,使之形成企業競爭的壁壘;所謂企業優邊界的相對擴,是指由於規模管理效即電子商務運用信息技術使企業以低信息成本共享管理成本,使企業總體管理成本分攤到各個管理環節和流程中,企業規模擴而邊際管理成本逐漸下降,相同的管理成本可用於管理更規模的企業,即隨著電子商務在企業中的用,企業的優邊界相對擴了。
  19. In order to fully develop the theory of squeezed branch piles, in particular, the justification of its superior performance in terms of the bearing capacity and sinking displacement, we have derived the analytical formulas of the axial load and the strain at arbitrary depth ; based on existing static loading test results and research on belled pile, together with the analysis of on - site testing data, we have applied the expand theory on sphere holes to the computation of radial stress of squeezed branch piles under hole expansion ; taking the oil pressure of hole expansion in to account, we have find the a branch force under certain hole pressures, hence we can estimate the maximum bearing capacity of single piles ; we have introduced the experiential formulas for the bearing capacity of squeezed branch piles based on its stress characteristic and pile testing data ; we have also done numerical simulations of squeezed branch piles utilizing finite element method software ansys ; we have matched the simulation res ults with those of on - site basic load experiments, regenerating the distributions of stress fields and strain fields of squeezed branch piles, and from those distributions, we can determine the optimal distances between plates and piles

    為了完善支盤樁的設計理論,探求支盤樁高承載和低沉降量的內涵,本文推導出了支盤樁任意深度的截面荷載以及位移隨深度變化的理論公式;基於已有的靜載試驗成果及有關擴底樁的研究成果,從對現場測試數據的分析,將球形孔擴理論引入到支盤樁擴孔時徑向的計算,考慮到擴孔時的油壓數據,求得某一孔壓下的支盤,據此估算單樁極限承載;同時根據對支盤樁的受特點和試樁數據的分析,提出了支盤樁承載計算的經驗公式;用有限元分析的方法,利用型有限元分析軟體ansys對支盤樁進行數值模擬,並將模擬結果同現場的靜載試驗結果進行對比,再現了支盤樁在荷載作用下土中場和位移場的變化,根據場和位移場的變化范圍,指出佳盤間距和樁間距;為支盤樁的設計和施工提供了一個可量化的設計依據。
分享友人