最大水位 的英文怎麼說

中文拼音 [zuìshuǐwèi]
最大水位 英文
maximum level
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 水位 : stage; water level
  1. ( 4 ) the maximum water quantity becomes greater, the better is the filtering bed permeability, the higher the river hydraulic conductance, the higher the river level, the larger the water - collecting area and the bigger the distance between collecting pipes. the water quantity varies directly with drawdown

    ( 4 )濾床的滲透性能越好,河床力傳導系數越高,河越高,取面積越,取管之間的間距越,則量越降深與取量成正比關系。
  2. A rather large spring tide occurred on july 4, 2004. on that occasion, the lowest sea level recorded in victoria harbour was 0. 07 metre below chart datum and a few ferries experienced difficulty while berthing

    二四年七月四日亦出現了一次較潮,當日維多利亞港錄得的為海圖基準面以下0
  3. At the same time, a lot of electrical energy is wasted when the level is high and the working curve is displaced. so urgent affairs are choosing right timing ways to rebuild the pumps. applying frequency conversion timing to wind machines and pumps is an important technology in our country

    設計都按照長江、漢百年一遇選擇泵出揚程,這樣在高時往往由於揚程太而偏離泵的工作高效區,浪費了量電能,選擇合適的調速方式對泵船泵機組進行節能改造,成為當務之急。
  4. Table 1 : maximum storm surge and sea level recorded in hong kong during the passage of tropical cyclones since 1954

    表一: 1954年以來熱帶氣旋影響香港期間錄得的風暴潮和
  5. According to the hong kong observatory s tidal records at the tai po kau tide gauge station, the highest sea level was 2. 94 metres above chart datum on that day

    根據香港天文臺埔?測潮站的記錄,當日的為海圖基準面以上2 . 94米。
  6. In the past 10 years 1995 - 2004, there were three occasions during which the sea level at tai po kau in january was higher than this occasion, with the highest of 3. 13 metres in 1995

    在過去十年一九九五年至二四年,埔?一月份的有三次比這次高,高的是1995年的3 . 13米。
  7. In the past 10 years ( 1995 - 2004 ), there were three occasions during which the sea level at tai po kau in january was higher than this occasion, with the highest of 3. 13 metres in 1995

    在過去十年(一九九五年至二四年) ,埔?一月份的有三次比這次高,高的是1995年的3 . 13米。
  8. 3. the drop datum of largest water level in researched reaches increases relatively with length increase of dredging channel in definite condition of discharge and sediment and definite dredged sediment quantity or dredged morphology of transversal section

    在一定的沙條件和一定的挖沙量或一定挖河斷面條件下,隨挖河長度增加,研究西安理工學工程碩士學論文河段最大水位降落值相對越
  9. The dalian new port, currently china ' s largest modern oil terminal, mainly transports crude oil from daqing and liaohe

    連新港棗中國目前規模深的以輸出慶、遼河原油為主的現代化油港。
  10. The 60mn hot die forging hydraulic press, with weight 30 % reduction of the main body compared with the traditional hydraulic press because of plate frame structure designed through new idea by adopting transverse pre - tightening technology mainly embodying the design and manufacturing level of the heavy - duty hydraulic presses at modem times, the first one with independent intellectual property right designed by china itself and a transverse pre - tightening plate - frame hydraulic press with max. tonnage in the world at present

    摘要60mn熱模鍛液壓機,採用橫向預緊技術,創新設計了板框式本體結構,與傳統液壓機相比,機械本體重量減少了30 % ,採用的主要技術集中體現了當代型液壓機設計和製造技術平,成為中國自行研製的具有自主知識產權的首臺,並且也是目前世界上的橫向預緊板框式液壓機。
  11. Conclusions can be drawn from the calculation results that the instantaneous horizontal displacement of the structure fluctuates around the static result and converge to the static displacement because of the influence of damp

    從計算結果可以看出,動力分析的移比靜力作用的很多並以靜力移為中心上下波動,並在阻尼作用下收斂到靜力移。
  12. Such a rise shortens the return period of high water level by half, that is, a high water level with a return period of 50 years would have a return period of about 25 years after the rise in the mean sea level.

    楊繼興說:維多利亞港的海平面在過去五十年上升了0 . 12米,這個升幅會使的重現周期縮短約一半。即是說,原本重現周期是五十年的,在海平面升高后的重現周期會是約二十五年。
  13. Based on analysis of the characteristics of the composite soil nailed wall, simulating the soil nail, concrete layer, deep mixing pile and step excavation, a model is established to calculate the deformation of the wall, compiled simple and applied program of one dimension fem ; according to the field test data and the calculated data by the fem software this paper has developed, the design method and deformation of the wall in xi ' an area is discussed. the shape of destructive sliding surface of the wall in loess strata in xi ' an area with deep groundwater is gotten. finally the lateral deformation distribution and the experiential formula to predict maximal horizontal displacement of the composite soil nailed wall are given

    針對復合土釘墻構造的特點,建立了模擬復合土釘墻受力變形的一種計算模型,該計算模型可對土釘、面層、深層攪拌樁以及分層開挖等進行簡化模擬;編寫了簡單實用的桿系有限元程序;結合工程實測資料及有限元法分析的結果,探討了西安地區的土釘設計以及復合土釘墻的變形規律,得出了西安地區一般黃土在無地下時的破壞滑動面形狀,復合土釘墻的側向變形曲線以及計算復合土釘墻移的經驗公式。
  14. ( 6 ) the ratio of the maximum value of the ground surface settlement and the horizontal displacement of the retaining structure has been found to be constant in the condition of an universal clay soil, steel bracing, seepage force etc

    總結出土質為一般粘性土,鋼支撐支護體系,考慮滲流作用的條件下沉降量與移的比值。
  15. Such a rise shortens the return period of high water level by half, that is, a high water level with a return period of 50 years would have a return period of about 25 years after the rise in the mean sea level. " nevertheless, as the effects of storm surges and long term sea level rise have been taken into consideration in the design of coastal projects, it is unlikely that the sea level will pose a threat to hong kong in the near future

    12米,這個升幅會使的重現周期縮短約一半。即是說,原本重現周期是五十年的,在海平面升高后的重現周期會是約二十五年。雖然如此,由於香港的海岸工程在設計時已考慮了風暴潮效應及海平面可能會上升,相信在未來一段時間內香港的海面高度仍不會對香港構成威脅。
  16. The aim is to get the rotation angles of left and right hands ' shoulder joints, elbow joints, wrist joints, sternoclavicular joint and the trunk when there is the longest horizontal distance between the center of gravity and the finish position

    主要目的在於利用創建的模式求解重心與沖線置生成平距離時,左右手之肩關節、肘關節、腕關節及頸關節與軀干扭轉的角度。
  17. For example, if you have three plumbers working on a project, the maximum units is 300 % - three plumbers working full - time

    譬如,如果您有三個管道工人執行一個項目,則是300 % ,即三個管工人的全部工作時間。
  18. Details behavior as bellows : ( 1 ) the damping force of the damper with concrete ductility column is higher, and the final damping force smoothly decreases. ( 2 ) the ductility ratio of the damper with concrete ductility column is larger, so it has good ductility and its most level displacement is 1 / 14 ~ 1 / 8 of the column height. ( 3 ) the hysteretic curve of the damper with concrete ductility column is plumper

    具體性能如下: ( 1 )混凝土延性柱耗能器的阻尼力比較高,後期阻尼力下降比較平緩; ( 2 )混凝土延性柱耗能器的移延性系數較,具有較好的延性,移達到柱高的1 / 14 1 / 8 ; ( 3 )混凝土延性柱耗能器的滯回曲線飽滿; ( 4 )混凝土延性柱耗能器中延性柱屈服后等效粘滯阻尼系數迅速增,消耗地震能量的能力增; ( 5 )混凝土延性柱耗能器中每根延性柱的破壞形態基本一致,表現了良好的共同工作性能。
  19. Based on the fundamental theory of dynamics of soil moisture and the condition of water storage pit irrigation, numerical modeling of soil moisture movement of single water storage pit in heterogeneous soil is established. adi ( alternating direction implicit method ) and gauess - seidel iterative method are used to solve it. by using the simulated value of modeling, the relation of water injection volume and maximum horizental distance of moisture frontal are concluded. according to the relation, interval of pits are derived. then, after analyzing the infiltration characteristic of soil moisture under the condition of interference infiltration in multi storage pit, numerical modeling of soil moisture movement of multi water storage pit in heterogeneous soil is established, and its numerical solution is also acquired

    利用adi (交替方向隱式差分法)結合gauess ? seidel迭代法對模型進行數值求解。利用模型的計算結果得出了單坑注量與濕潤鋒平推進距離之間的關系,並據此確定了坑距。在此基礎上,通過對多坑干擾入滲條件下土壤分入滲特性進行分析,太原理工學碩士研究生學論文建立了蓄多坑非均質土壤分運動數學模型,並對其進行數值求解。
  20. The maximal horizontal displacement appears in the area near the face of the wall and the maximal settlement appears in the ; 4

    ( 3 )平變發生在面板附近,豎向沉降在墻體的中下部。
分享友人